Responsible for directing, managing, coordinating and expediting through engineering team, sub-contractors, vendors and suppliers, subordinate supervisors for the planning, execution of assigned customer Projects within cost, schedule and contract limitations while ensuring total customer satisfaction. Directing a team of 700. Reporting to the Operation Manager
• Prepared project execution strategy, implemented quality control standards and cost control on project for on time completion.
• Provided leadership to project team to accomplish project goals and monitored out-put.
• Provided technical advice and guidance to engineering team for installation, testing and commissioning. Studied specifications to plan procedures for project execution on basis of starting and completion times.
• Supervise, monitor and report Project progress throughout the project cycle to ensure on time completion. Attend Project Progress Meetings and coordinate with other departments.
• Study specifications to plan procedures for beginning work on the basis of starting and completion times.
• Confer with and direct supervisory personnel engaged in planning and executing work procedures, interpreting specifications and coordinating various phases of project to prevent delays.
• Confer with supervisory personnel to resolve complaints and grievances within work force.
• Ensure that established practices, procedures and quality standards are maintained and followed by performing regular checks on the progress and quality of work.
• Oversaw all aspects of mobilization & demobilization of manpower for the Projects, preparation of BOQ/ Material Submittals.
• Manage Cash Flow Requirements for the Projects. Controlled expenditures within limitations of project budget.
• Liaised with Client/ Consultant/ Sub-Contractors.
Responsible for directing, managing, coordinating and expediting through engineering team, sub-contractors, vendors and suppliers, subordinate supervisors for the planning, execution of assigned customer Projects within cost, schedule and contract limitations while ensuring total customer satisfaction. Directing a team of 700. Reported to the Operation Manager
• Prepared project execution strategy, implemented quality control standards and cost control on project for on time completion.
• Provided leadership to project team to accomplish project goals and monitored out-put.
• Provided technical advice and guidance to engineering team for installation, testing and commissioning. Studied specifications to plan procedures for project execution on basis of starting and completion times.
• Supervise, monitor and report Project progress throughout the project cycle to ensure on time completion. Attend Project Progress Meetings and coordinate with other departments.
• Study specifications to plan procedures for beginning work on the basis of starting and completion times.
• Confer with supervisory personnel to resolve complaints and grievances within work force.
• Ensure that established practices, procedures and quality standards are maintained and followed by performing regular checks on the progress and quality of work.
• Oversaw all aspects of mobilization & demobilization of manpower for the Projects, preparation of BOQ/ Material Submittals.
• Manage Cash Flow Requirements for the Projects. Controlled expenditures within limitations of project budget.
• Liaised with Client/ Consultant/ Sub-Contractors/DCA/DEWA/DM/ADDC/ADSSC/ADM for all requirements till delivery
• Spearheaded and managed Project of Al Zeina, Yas Island This project includes 14 tower apartments of 1221 duplex apartments and 34 beach villas with Lighting, Power, HVAC fire alarm, voice evacuation sprinklers, lighting control, CBS emergency lighting, Gas detection, BMS, CCTV,
Responsible for engineering team, sub-contractors, vendors and suppliers, subordinate supervisors the planning, execution of assigned customer Projects within cost, schedule and contract limitations while ensuring total customer satisfaction. Reporting to the Project Manager.
Key Achievements:-
Spearheaded and managed the successful Electrical Engineering Project of Mall of the Emirates worth AED. 250million This project includes Substations, Lighting, Power, fire alarm, voice evacuation, lighting control, CBS
• emergency lighting, Gas detection, BMS, CCTV, VMS, signage and lightning protection systems Coordinated with DEWA for drawing approvals, Inspections and energization
• Leveraged seasoned technical expertise in managing the Dubai Festival City Hill Side Apartments & Al Badia Golf Club Project worth AED. 250 Million.
Provided leadership to project team to accomplish project goals and monitor out-put Directly supervised a team of8 Engineers & 12 Draftsman involved in the Design, Project management and commissioning of various Projects.
• Directed, managed, coordinated and expedited through subordinate Engineers & Inspectors for delivery and implementation of assigned customer electrical contracting projects within cost, schedule and contract limitations while ensuring total customer satisfaction. Monitored work in progress at site, including quality control inspections of Main contractor works Performed site supervision of all phases of electrical contracting projects and effective management of engineering personnel. Approved materials & Shop drawings, supervised procurements. Attended Factory acceptance test,
Key Achievements:-
• Spearheaded and managed the Power Supply to Haradh Crude increment II Saudi Electricity Co. Project of Construction of 105 KM 230 KV Transmission line and 2 Sub Stations
Provided leadership in Engineering for successful implementation of the projects
Key Achievements
• Appointed as the Management Representative for the implementation of ISO-9002 in the company.
• Successfully involved in the development of increment III Aramco Dammam, Cooling Tower Project, Aramco, Rastanura, Construction of 380- KV Substation at Al-Fadhili a Joint Venture Project with ABB Contracting Co. Ltd. Riyadh, Maintenance of Electrical installation at Saudi Aramco Terminal and offshore installations Rastanura, Construction of New Loading facilities at RT Refinery Saudi Aramco Rastanura
• Responsible for design approval, drawing approval, site inspection, issuance of certificate of energisation.
Major Projects handled:-
• Reinforcement of 110KV substation, Kanhangad with 2 Nos 10MVA Transformers.
• Electrification of Hotel Complex. Hotel Fort Vihar Kanhangas with 2 Nos Lift and 100 KVA DG Set.
• Electrification of Hospital with CT Scan, X-Ray, Lift, DG set at Muthoot Hospital, Kozhenchery.
• Installation of 200 Nos of 11 KV substations with more than 200 KM of 11 KV HT Line.
• Complete electrification of the following factories :-
- KA Boards & Plywoods, Kumbla, Kassargod
- Co-operative Latex Factory-Kanhangad