Maynard Masangcay, TECHNICAL ENGINEER

Maynard Masangcay

TECHNICAL ENGINEER

ZTE PHILIPPINES INC.,

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Electronics and Communication Engineering
Expérience
5 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :5 years, 10 Mois

TECHNICAL ENGINEER à ZTE PHILIPPINES INC.,
  • Philippines
  • janvier 2013 à juin 2014

JOB DESCRIPTION
• Supervise Subcons on the Installation of ZTE Equipment on site in accordance with the Method of Procedures (MOP) on proper Installation.
• Perform Script Loading in the ZXCTN9008, 9004, and 9002 for Fiber Optics Operations.
• Perform Installation, Testing and Commissioning of ZXCTN9008, 9004, 9002, and 6220 for
Fiber Optic Technologies with ZTE Subcons as per requirement of SMART Communication Inc. and perform Link-up and Functionality Testing with NOC.
• Performs troubleshooting, fault testing and fault localization with SMART FO's and NOC.
• Performs testing of Fiber Optics Operations, Stability Testing and Link-up using CMA 3000
Anritsu.
• Prepares IAT, PAT/NAT.

TELECOM IMPLEMENTATION ENGINEER à ERICSSON TELECOMMUNICATION PHILIPPINES
  • Philippines
  • avril 2011 à août 2012

JOB DESCRIPTION
• As an Implementation Engineer I do the Monitoring of Subcons for the Activities in the site if
they will follow properly the method of procedure for Equipment SWAP and to meet the time
frame for the Activity.
• Perform Script Loading in the DUW for 3G of RBS 6201 for UMTS 2100 and HSPA 850 and do the Functionality Testing after the Integration for the said Bands.
• Perform Installation Testing and Commissioning of RBS 6201, 6202, 6301 for 2G technologies with the Ericsson ASP as per requirement of SMART Communication Inc. and perform
Functionality testing after integration.
• Pre-Commissioning of DUG, DUW and RUS in the RBS 6000 families that includes the configuration of Parameters and alarm settings.
• Performs troubleshooting, fault testing, fault localization and External alarms testing and fault
escalation.
• Coordination with Integration Engineer and NOC for RBS installation verification and RBS
integration test call.
• Performs testing of Antenna and feeder system using VSWR Tester (site master S331-D)
• Prepares RFI, BIS, PAT and FAT

LEAD TECHNICIAN à Sunpower Philippines Manufacturing Lmtd
  • Philippines
  • mai 2008 à janvier 2012

JOB DESCRIPTION
• Monitors daily tool performance and implements containment action to improve both tool
availability and yield.
• Establish and initiate ideas to continuously improve process.
• Perform minor troubleshooting and problem analyzing.
• Escalate issues and concerns or any other tool abnormalities to immediate superior.
• Support PE/EE/Trainers in other activities related to process improvement.
• Perform qualification and production run of quality wafers
• Check lot integrity and ensure no discrepancy.
• Active participation in SPC.

Éducation

Baccalauréat, Electronics and Communication Engineering
  • à AMA Computer College Biñan Campus
  • avril 2007

Bachelor of Science in Electronics and Communication Engineering (May 2003 - April 2007) AMA Computer College Biñan Campus Biñan, Laguna, Philippines

Specialties & Skills

Microsoft Excel
Telecom Software
Telecom Applications
Telecom Protocols
Communications Engineering
ANRITSU
ENGINEER
FIBER OPTIC
FIBER OPTICS
OPERATIONS
PROCESS IMPROVEMENT
TESTING

Langues

Tagalog
Expert
Anglais
Moyen

Loisirs

  • Learning Languages
    Learning languages through internet such as Korean and French.