meera mohideen, QA/QC Engineer

meera mohideen

QA/QC Engineer

KCCEC Engineering and Contracting Co.

Location
Kuwait
Education
Bachelor's degree, Electrical and Electronics Engineering
Experience
14 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 7 Months

QA/QC Engineer at KCCEC Engineering and Contracting Co.
  • Kuwait - Al Kuwait
  • My current job since April 2016

-Study/ review the contract documents and preparation and submission of Project Quality Control Plan, InspectionTest Plans, Technical procedures and etc., for all major KOC, KNPC and MEW Projects.
-Conducting the QC technical audits in the organization¡¦s projects and reporting the results to the projects management and organization¡¦s top management.
-Provide the project technical support through the project QC Team and maintain the Quality standards.
-Selection and assignment of duties to the project QC Inspectors.
-Arranging and providing the QC technical trainings to the Engineers and Inspectors.
-Coordinating and arranging the third party inspection activities related to the project operations.
-Coordinate with project procurement team, prepare and submit the Project procurement plan, approved vendor list, Long Lead Items categorization and prioritizing.
-Support the proposal/ Tendering department to identify the QHSE requirements from the tender documents and provide the required technical feedback/ requirements in order for them to evaluate the tenders properly.
-Reviewing the QHSE requirements from the Clients for Organization¡¦s prequalification, business development
purpose and preparation and submission of related documentation.
-Preparing and updating the Product / Service related Risk Assessment Register based on ISO 9001:2015 standard requirements for all processes like HR, Procurement, and Tendering etc.
-Preparing and updating the HSE related Risk Assessment Register based on BS OHSAS 18001:2007 standard requirements for all work activities.
-Preparing and updating the Environmental Aspect/ Impact Register based on ISO 14001:2015 standard
requirements for all work activities.
-Responsible for coordinating with the project operations and business development to get the newly awarded project and ongoing project details to prepare and implement the QHSE annual audit plan.
-Scheduling and Conducting the QHSE internal audits for project operations and various departments in the
organization.
-Directly reporting to the QHSE Manager related to the QHSE audit results, finding and related issues.
-Coordinating and arranging the Organizations QHSE Management Review Meeting and assist the QHSE Manager for reporting the QHSE performance and collecting the feedback and instructions from the organizations top management
-Coordinate non-conformance identification, disposition and corrective action follow-up.
-Preparation, implementation and maintenance of Organization¡¦s Integrated Management System Manual, procedures, policies, forms and other related documentation (Quality, Health& Safety and Environment) for ISO/BS Certification.
Preparation, implementation and maintenance of Organization¡¦s administration related policies, procedures for the day to day operations.
-Coordinating with other departments and project operations to understand any new requirement of procedures, policies and any updating the existing system.
Coordinating with the ISO/ BS certification body to conduct the external certification/ surveillance QHSE audits.

QA/QC Engineer (E&I) at Alghanim International
  • Kuwait - Al Ahmadi
  • August 2014 to April 2016

-Inspection and surveillance on field project construction works (Electrical &Instrumentation). Ensuring Quality
Procedures and IFC drawings are being followed and implemented.
-Develop and issue Monthly Project Quality Index Report to the main office regarding the Project Quality trend.
-Inspection of cable laying, dressing, glanding, termination and testing activities and documentation.
-Inspection of cable trays, conduits and ladder installation and documentation.
-Inspection of Installation and Testing of Earthing System (Clean & Safe).
-Inspection of Electrical Panels, MCS, Instrument Marshalling cabinet’s and JB’s installation and testing.

Project Engineer at Trans W Engineering and Trading Co.
  • Kuwait - Hawali
  • September 2012 to August 2014

- Responsible for Installation and Commissioning of SKF Vibration Monitoring System for Boiler Feed water Pump Motor, FD Fan Motor and Condensate Pump Motor at Shuaiba South Power Station

- Responsible for Installation / Commissioning of MCC panel at Az-Zour Power Station

- Responsible for Installing Vibration Sensor pad, Grease Inlet and Outlet pipes at NDE side for MV Motors at Az- Zour Desalination Project.

- Responsible for Technical approvals and Installation of MV Starters for the ongoing Green Carbon Project

- Responsible for Revamp of Cathodic Protection System Project for Condenser and Heat Exchanger Area and Sea Water Intake Area with Ministry of Electricity and Water (MEW) at Doha East Power Station

- Responsible for Technical Discussion with End User and Principal for all Cathodic Protection Project inquiries

- Responsible for checking and approving the Technical aspects and finalising the offers for sales team.

- Responsible for all Technical Approvals from End - User / Clients of all Major Projects

- Liaising with customers on a regular basis to ensure the successful design and manufacture of products to agreed budgets and time frames.

- Preparing Bill of materials and Specifications, Project Scheduling and Manpower Estimation for commercial and Industrial projects.

M&E Co ordinator at Lebanon Builders
  • India
  • July 2011 to May 2012

• Responsible for checking plans, manpower allocation and co-ordination and supervision at site.
• Responsible for preparing drawings for conduits and wiring.
• Responsible for conduits laying, Earthing, cable routing, specification and scheduling.
• Act as liaison with M & E Consultants and subcontractors.
• Manpower Management, Planning & Scheduling.
• Attending site co-ordination meetings with consultants, contractors and sub-contractors.
• Coordinate all relevant drawings and information to eliminate "interference" problems.
• Identifying variation to original scope of work and helping Q.S department.
• Daily progress reports to be prepared.
• Scheduling of day-to-day activities with respect to available materials, manpower, machinery and transport.
• Execution of Site activities as per the Technical requirements and as per planning.

Project engineer at Garisan Etika Sdn Bhd
  • Malaysia
  • August 2010 to July 2011

• Responsible for Maintenance, Service and Testing of Diesel Generator Sets (7500KVA) and Motors, performing regular testing like Insulation Resistance (IR) and Polarisation Index (PI) and Periodic testing like Mechanical Bumping and Particle Discharge Tests.
• Responsible for Testing and Maintenance of control panels, performing tests like Short Circuit test and Continuity Test.
• Responsible for preparing single line drawings (SLD) with complete load calculation for 108MW Power Plant and 12MW Biomass Power Plant.
• Responsible for preparing L1 (Management Progress), L2 (Co-ordinating & Monitoring with Site and Engineering), L3 (Shortage and Blockages) and L4 (Execution/Inspection in detail engineering) Project schedule using Microsoft Project.
• Responsible for preparing manpower histogram, key category histogram (heavy equipments, Tools and Tackles)
• Responsible for preparing cable length, specification, routing and scheduling.
• Liaise with contractor for Preliminary Work, Boiler, BOP, Generator, Fuel Preparation and Civil Work for 12MW Biomass Power Plant.
• Involved in ISO 9001:2008 (Project and Engineering) Auditing.

Trainee Engineer at Garisan Etika Sdn Bhd (India Branch)
  • India
  • June 2009 to July 2010

• Involving in project team discussion
• Responsible for supervision of Truss Fabrication
• Prepare daily and monthly report for work progress.
• Liaise with main contractor and consultant.
• Prepare work arrangement in site.
• Prepare daily and monthly report for work progress.
• Liaise with suppliers.
• Control and monitor outgoing and in progress machineries.
• Monitor and control machineries expenses.
• Implement cost reduction program.
• Increase supervisor and mechanics productivity.

Education

Bachelor's degree, Electrical and Electronics Engineering
  • at PSNA College of Engineering and Technology
  • April 2009

Specialties & Skills

Electrical Engineering
ISO 14001
OHSAS 18001
Quality Control
MS-Project
Quality Assurance
AutoCAD
ISO 14001 : 2015
MS-Office
QHSE AUDITS
Internal Audit
BS OHSAS 18001 : 2007
Safety Management Systems
Team Management
Quality Auditing
Auditing
Safety Auditing
Risk Management
Safety Audits
Safety Management
Accident Investigation

Languages

English
Expert
Hindi
Beginner
Tamil
Expert

Memberships

Kuwait Society of Engineers
  • Electrical & Electronics Engineer
  • April 2018

Training and Certifications

ISO 9001:2015 - QMS Awareness Training (Training)
Training Institute:
K.V Management System Solutions
Date Attended:
June 2017
Duration:
8 hours
Managing Safely (Training)
Training Institute:
IOSH
Date Attended:
June 2017
Duration:
21 hours
BS OHSAS 18001:2007 Lead Auditor (OHMS) (Training)
Training Institute:
CQI IRCA Certified Training (CQI Number 37863)
Date Attended:
July 2017
Duration:
40 hours
ISO 14001:2015 (EMS) Lead Auditor (Training)
Training Institute:
CQI IRCA Certified Course (CQI Number 40615)
Date Attended:
July 2018
Duration:
40 hours
First Aid Basic Safety Awareness (Training)
Training Institute:
TUV Nord
Date Attended:
April 2016
Duration:
8 hours
Risk Management (Training)
Training Institute:
Global Experts
Date Attended:
February 2017
Duration:
20 hours
Internal Audit (ISO 9001, 14001 and BS OHSAS 18001) (Training)
Training Institute:
Maqlink Consultants
Date Attended:
April 2016
Duration:
8 hours
(Training)
Safety Course (Training)
Training Institute:
Construction Industry and Development Board
Date Attended:
February 2011

Hobbies

  • Listening Music, Playing Football