Total Years of Experience: 13 Years, 5 Months
October 2010
To Present
Project Manager / Site Engineer & Technical Office Engineer
at East Delta Contracting
Location :
Egypt - Cairo
I worked as a Site Engineer:
o Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
o Setting out, leveling and surveying the site.
o Checking plans, drawings and quantities for accuracy of calculations.
o Ensuring that all materials used and work performed are as per specifications.
o Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors.
o Manage subcontractors.
o Good knowledge in interior finishing materials.
o Supervising contracted staff.
o Liaising with clients, subcontractors and other professional staff.
o Checking and preparing site reports, designs and drawings.
o Providing technical advice & problem solving.
Site Works Experience:
o Gypsum Board Works (Ceiling, Partitions & Claddings).
o Plumping & Drainage Works.
o Masonry & Plaster Works.
o Flooring (Ceramic & Porcelain), Parquet & HDF Flooring.
o Painting Works.
o Electrical Works.
o Carpentry & Wooden Works.
o HVAC Works.
Also worked as a Technical Office Engineer:
o Studying CAD Drawings of the projects.
o Checking Bill of Quantities' items.
o Take as built site dimensions and prepare as built drawings.
o Finalizing presentation drawings and other major architectural rendering for client.
o Ability to create accurate Bill of Quantities and specifications.
o Provide assistance to project managers.
Projects have been done:
o H&M - Dandy Mall - (Training)
o Burger King - Al Sherouq (Oil Libya) - (Training)
o Sutherland Global Services - Old Post Building, Alexandria
(From 1st December 2010: 20th February 2011)
o Pronovias - El Mohandseen
(From 1st March 2011: 10th June 2011)
o French Connection - City Stars Mall
(From 1st November 2011: 5th January 2012)
o H&M - Katameya Down Town (5th Settlement)
(From 3rd March 2012: 3rd May 2012)
o Starbucks - Makram Ebied, City Center (Renovation)
(From 20th July 2012: 16th August 2012)
o Al-Shaya Head Office - City Stars, Star Capital (8) Building - (Current Project)
(From 1st December 2012: 3rd March 2013)
o Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
o Setting out, leveling and surveying the site.
o Checking plans, drawings and quantities for accuracy of calculations.
o Ensuring that all materials used and work performed are as per specifications.
o Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors.
o Manage subcontractors.
o Good knowledge in interior finishing materials.
o Supervising contracted staff.
o Liaising with clients, subcontractors and other professional staff.
o Checking and preparing site reports, designs and drawings.
o Providing technical advice & problem solving.
Site Works Experience:
o Gypsum Board Works (Ceiling, Partitions & Claddings).
o Plumping & Drainage Works.
o Masonry & Plaster Works.
o Flooring (Ceramic & Porcelain), Parquet & HDF Flooring.
o Painting Works.
o Electrical Works.
o Carpentry & Wooden Works.
o HVAC Works.
Also worked as a Technical Office Engineer:
o Studying CAD Drawings of the projects.
o Checking Bill of Quantities' items.
o Take as built site dimensions and prepare as built drawings.
o Finalizing presentation drawings and other major architectural rendering for client.
o Ability to create accurate Bill of Quantities and specifications.
o Provide assistance to project managers.
Projects have been done:
o H&M - Dandy Mall - (Training)
o Burger King - Al Sherouq (Oil Libya) - (Training)
o Sutherland Global Services - Old Post Building, Alexandria
(From 1st December 2010: 20th February 2011)
o Pronovias - El Mohandseen
(From 1st March 2011: 10th June 2011)
o French Connection - City Stars Mall
(From 1st November 2011: 5th January 2012)
o H&M - Katameya Down Town (5th Settlement)
(From 3rd March 2012: 3rd May 2012)
o Starbucks - Makram Ebied, City Center (Renovation)
(From 20th July 2012: 16th August 2012)
o Al-Shaya Head Office - City Stars, Star Capital (8) Building - (Current Project)
(From 1st December 2012: 3rd March 2013)
Share on Facebook
Share on Twitter
Share Via Email