Total Years of Experience: 28 Years, 4 Months
January 2017
To Present
Chairman and Co-founder
at M&N Habitat
Location :
France
Real estate management
June 2018
To January 2022
Deputy Construction Company Owner
at XXXXXXX
Location :
France
Rescue of a financially troubled company: project management (inc. roads, equipment, and property development), plant, legal redress, whole reorganisation, recovery plan, consolidation, legal, contracts, H.R.
December 2013
To January 2017
Procurement, supply chain, logistics, construction
at Total / Ponticelli
Location :
Republic of Congo
Locations: France and Republic of the Congo.
Sector: oil and gas services,
Project: Moho, construction, transport and integration of modules within Floating Production Unit ( FPU) ALIMA, within integrated teams with TOTAL EXPLORATION PRODUCTION CONGO ( TEPC) team, engineering by TECHNIP.
The objective for the company is the implementation of the necessary means in the realization of the project Moho ( offshore ), and, in the longer term, to base durably its industrial and commercial presence in Republic of the Congo.
Consequently, my mission contains 2 main parts led simultaneously:
- On the long term: project logistics, supply chain, procurement, purchases and transit management,
- On the court / middle term: the construction of industrial and commercial infrastructures.
1th part: creation of the project logistic department in Congo:
- International supply chain Management,
- Follow-up of the national, international transport and offshore supply,
- Custom imports in Congo,
- Local purchases, including manufacturing of metallic parts (structure and piping mainly),
- Local and international purchases of various goods, including specific tools, durable goods, etc.
- Storage 7.5 acres / 3 hectares,
2nd part: constructions of industrial infrastructures project management, studies and realization in Congo. In some figures: 750sqm of warehouses, 600sqm of offices and 3ha of installations on two different sites.
It includes:
- Invitations to tender and company selections,
- All trade works coordination, underground analysis, piles, landscapings, civil works, prefabricated offices assembling, steel structures construction,
- Electricity supply and distribution from20KV local network until 400/220V distribution additionally with diesel generators,
- Waste water treatment by water-treatment plant,
- Information technologies (internet, inter sites radio beams, networks, computer hard/software),
These missions are realized with Total EP Congo general specifications.
Sector: oil and gas services,
Project: Moho, construction, transport and integration of modules within Floating Production Unit ( FPU) ALIMA, within integrated teams with TOTAL EXPLORATION PRODUCTION CONGO ( TEPC) team, engineering by TECHNIP.
The objective for the company is the implementation of the necessary means in the realization of the project Moho ( offshore ), and, in the longer term, to base durably its industrial and commercial presence in Republic of the Congo.
Consequently, my mission contains 2 main parts led simultaneously:
- On the long term: project logistics, supply chain, procurement, purchases and transit management,
- On the court / middle term: the construction of industrial and commercial infrastructures.
1th part: creation of the project logistic department in Congo:
- International supply chain Management,
- Follow-up of the national, international transport and offshore supply,
- Custom imports in Congo,
- Local purchases, including manufacturing of metallic parts (structure and piping mainly),
- Local and international purchases of various goods, including specific tools, durable goods, etc.
- Storage 7.5 acres / 3 hectares,
2nd part: constructions of industrial infrastructures project management, studies and realization in Congo. In some figures: 750sqm of warehouses, 600sqm of offices and 3ha of installations on two different sites.
It includes:
- Invitations to tender and company selections,
- All trade works coordination, underground analysis, piles, landscapings, civil works, prefabricated offices assembling, steel structures construction,
- Electricity supply and distribution from20KV local network until 400/220V distribution additionally with diesel generators,
- Waste water treatment by water-treatment plant,
- Information technologies (internet, inter sites radio beams, networks, computer hard/software),
These missions are realized with Total EP Congo general specifications.
June 2012
To September 2012
Expediting Manager
at MAN DIESEL AND TURBO
Location :
Germany
Piping supply from Czech Republic to French Caribbean follow up.
September 2011
To April 2012
Procurement and Logistics Manager
at Vinci Construction France
Location :
France
Procurement and Logistics Department creation :
- budget drawing up and follow up,
- fleet management,
- creation of a warehouse (processes, procurement, stock control),
- market studies / invitations to tender / contracts,
- construction platform administration (safety, organisation, accesses, upkeep, electrical maintenance, communications media), machineries follow up (including tower cranes),
- waste management (recycling sorting),
- boiler shop,
- materials evacuation,
- internal and external transports,
- weighbridge.
Project: Nice Eco-Stadium (Nice, France)
- budget drawing up and follow up,
- fleet management,
- creation of a warehouse (processes, procurement, stock control),
- market studies / invitations to tender / contracts,
- construction platform administration (safety, organisation, accesses, upkeep, electrical maintenance, communications media), machineries follow up (including tower cranes),
- waste management (recycling sorting),
- boiler shop,
- materials evacuation,
- internal and external transports,
- weighbridge.
Project: Nice Eco-Stadium (Nice, France)
December 2009
To September 2010
Plant, Procurement, Logistics Manager
at BESIX - SIXCONSTRUCT
Location :
Qatar - Doha
November 2007
To December 2009
Plant, Procurement, Logistics, Construction Manager
at BESIX - SIX CONSTRUCT
Location :
United Arab Emirates - Abu Dhabi
- Multi projects and multi sites, logistics and internal / external transportations,
- Fleet management (up to 1000 machineries) : light vehicles and all type of construction machineries (including heavy and « specials » handling / lifting),
- Local procurements,
- Forecasting budget creation and follow-up,
- Market studies / invitations to tender / contracts, invoicing (internal / external, suppliers / clients),
- Importations follow-up (>1200 containers),
- Personnel transportation (up to 3000 emp../day),
- Storage / distribution (up to 40 000sqm2),
- Logistics H.R. (up to 450 employees),
- Drinking, non-drinking and sewage water follow-up,
- Waste management (including recycling sorting),
- Miscellaneous earthworks and construction works.
Main projects: Ferrari Experience theme park, and Yas-Island Car Parks, Yas Island Shopping Mall, Qatar National Convention Center.
- Fleet management (up to 1000 machineries) : light vehicles and all type of construction machineries (including heavy and « specials » handling / lifting),
- Local procurements,
- Forecasting budget creation and follow-up,
- Market studies / invitations to tender / contracts, invoicing (internal / external, suppliers / clients),
- Importations follow-up (>1200 containers),
- Personnel transportation (up to 3000 emp../day),
- Storage / distribution (up to 40 000sqm2),
- Logistics H.R. (up to 450 employees),
- Drinking, non-drinking and sewage water follow-up,
- Waste management (including recycling sorting),
- Miscellaneous earthworks and construction works.
Main projects: Ferrari Experience theme park, and Yas-Island Car Parks, Yas Island Shopping Mall, Qatar National Convention Center.
January 2005
To November 2007
Executive Manager
at Own Account
Location :
France
Light vehicles importations in Europ
April 2007
To August 2007
Maintenance and Construction Manager
at NATO, French Ministry of Defence
Location :
Kosovo
Creation and setting up of a « civilian » Maintenance Department for 8 to 12 K.F.O.R. military bases (all nationalities - around 4000 OTAN militaries in North-Kosovo and South-Serbia), creation of all internal procedures and all tools for budget follow up (incl. trainings), management of 30 employees (French and locals), alignment of facilities (including strategic) to regulation, procurement, market studies / invitations to tender / contracts, new construction works and renovations, client and suppliers invoicing, forward planning for preventives and curatives maintenances. Project CAPES France under French Department of Defense. All employees were 100% operational at the end of the mission.
July 2006
To November 2006
All Building Trade Construction Manager
at SAUDI-OGER
Location :
Saudi Arabia - Riyadh
Missions: construction follow up, forward planning and coordination. Employed as trainee for my General Engineer diploma.
April 2003
To December 2004
Lifting Equipments, Logistics, Construction Manager
at SAUDI-OGER
Location :
Saudi Arabia - Riyadh
Lifting equipment follow up (up to 35 hydraulics mobile cranes, up to 350t), internal transports (including « specials »), storage area concrete precast (15000sqm2), white precast fitting, up to 160 employees, 12 teams. Project: Riyadh Conference Center (budget is confidential).
March 2001
To March 2002
Logistics Assistant
at VERGERS DE FRANCE
Location :
France
Multi-site logistics management
September 1994
To February 2001
Operation, Freight Forwarder, Lifting, Construction, ... Manager
at Miscellaneous
Location :
France
Miscellaneous: warehousing, operation manager in transportation
Share on Facebook
Share on Twitter
Share Via Email