Moataz Mahmoud, Wireless RAN Teamleader

Moataz Mahmoud

Wireless RAN Teamleader

Huawei-DU project

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Diplôme, Telecommunication
Expérience
15 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :15 years, 5 Mois

Wireless RAN Teamleader à Huawei-DU project
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis juin 2015

• IBS solutions & installation.
• Fiber Optic installation.
• IBWave design basics
• DAS
• Small cells 3G, LTE, WIFI configuration and installation good knowledge
• Quality & acceptance works
• very good skills in excel
• software upgrade UMTS BSC6900, GU
. E2E Mobile networks
. VOLTE and Fixed LTE.
BSC6900/6910
• BSC6900/6910 UMTS integration
• IUb-IUr-IUCS-IUPS expanssion
• 2G/3G/eNodeB expansion/creation (cabinet, card, band, TRXs upgrade, carrier, …)
• QOS for the fair data usage between WCDMA and LTE.
• 3G UMTS 900 Band -creation and integration
• 3G RRU expansions power amplifier
.integration RNCs
new site screation and integration
IOT
5G basics

2G/3G/4G wireless back office senior RAN Engineer à vodafone
  • Egypte - Le Caire
  • mai 2014 à juin 2015

Main Roles / Responsibilities as Swap integration engineer:
• Management of swap activities by following/updating the swap process and guideline for telecom projects nationwide.
• Lead the Rollout swap teams to achieve swap activities objectives.
• Managing the Issue tracker for swap activities and escalating to corresponding project teams to get solved.
• Preparation the swap notification and report for each swap activity.
• Provide project management consultation to steering committees.
• Scope was no limited to Indoor/Outdoor/Enclosure, 2G/3G, GF/RT/COW/GRD sites)
• Swap from Ericsson to Huawei Equipments 2G /3G
• 2G expansion (cabinet, card, band, TRXs upgrade)
• Concentric to normal and normal to concentric cell conversion
• 2G cells expansion and conversion between Normal and concentric
• 2G, 3G IPRAN migration
• 2G, 3G new sites creation and commissioning
• 2G /3G swap preparation
• 3G expansion board, 1st, 2nd and 3rd carriers
• 3G UMTS 900 Band creation and integration
• 3G RRU expansions
• 2G /3G IPRAN migration
• KPI analysis and parameters optimization.
• Performance KPI and optimization graph monitors, analysis and troubleshooting (path imbalance, Low TCH assignments, low immediate assignments, Zero traffic PS, Zero traffic CS, Radio Call drop rate, Non-Radio, call drop rate, ......)
• follow up the Field maintenance engineers for troubleshooting support.
• 2G, 3G neighbors and relation script prepare
• Reaching ZERO KPI problematic sites (2G and 3G sites)


Awarded as one of the best performers and key person in the SWAP project from Vodafone CTO and from Huawei Egypt project director, Certificate is ready upon request


I started work in these projects from execution phase.

2G RAN back office support - senior engineer à huawei
  • Egypte - Le Caire
  • janvier 2010 à avril 2014

Job description details:
• Maintaining certain agreed level of Network performance, availability,
accessibility, integrity and usability by monitoring, analyzing and reporting
predefined Key Performance indicators (KPls).
• KPI analysis and parameters optimization
• Ensure maximum possible service coverage availability and perfect performance.
• 2G and 3G faults troubleshooting.
•Atoll and Wcell optimization tools
• 2G expansion and new site configuration.
• Handle trouble ticket within SLA or assign it to a certain team depend on the alarm
• follow up the Field maintenance engineers for troubleshooting support
• Handle the customer complain trouble tickets.
• Timely response to Fault complaint.
• Timely response to acknowledged Fault SLA
• Produce relevant report for Network Incidences/Outages.
• Analyze the complexity of the Fault and escalate as necessary
• Good experience to deal with Huawei tool M2000, U2000, MML command and LMT
• Expansion project (3012 AE, 3012, 3012II, 3900A, 3900C, 3006, 3002,
Ericsson(6601, 6201, 6601E, 6202) .etc.)
• BSC creation and software upgrade.
• Performance KPI and optimization graph monitors (path imbalance, Low TCH assignments,
low immediate assignments, Zero traffic PS, Zero traffic CS, Radio Call drop rate, Non-Radio
call drop rate, ......)

technical experience details:
• Has a good experience to deal with Huawei BSS monitoring tool M2000
• Has a good experience to deal with Huawei BSC controlling tool LMT
• Has knowledge about Huawei transmission monitoring tool U2000.
• New site integration.
• Frequency scan to avoid the interference.
• Cabinet expansion project (3012 AE, 3012, 3012II, 3900A, 3900C, 3006 3002, ...)
• Card expansion project (DDRU, DRFU, GRFU, ...)
• Card software upgrade.
• BSC software upgrade.
• Performance KPI graph monitors and cases handle (path imbalance, Low TCH assignments,
low immediate assignments, Zero traffic PS, Zero traffic CS, Radio Call drop rate, Non-Radio
call drop rate, ......)

Rollout engineer à Glextel
  • Egypte
  • décembre 2008 à décembre 2009

• microwave links (RTN 620, 950) installation and commissioning
• NEC microwave links (NEO - V4) installation and commissioning.
• Handling MW links (0.3, 0.6, 1.2, and 2.4) installation techniques of fixations.
• NEC swap by RTN620 and cutovers
• Mw links protection techniques (HSB, XPIC, SD, FD)
• OSN and ODF fiber connection and labeling
• Line of sight (LOS) report handling.
• RTN R3 Software upgrade.
• Transmission technical support
• Abis over IP project.
• BER handling.
• SDH, PDH good experience
• OptiX Metro 1000 to RTN650 swap project
• E1s and STMs optical fiber connection and installation
• 2G, 3G expansion.
• New sites installation.
• Site Surveys.
• Install Huawei BTS (3012 -3012II-3012AE - 3900-RRU 3G),
RBS(2202, 2308, 2206, 2106, 2107, 2206, 2207, 2216, 2308)
• New site Huawei.
• VSWR sweep test by site master.
• RF (antenna and feeder’s installation and arrangements)
• Installation and commissioning of Ericsson transmission equipment’s ADM DXX, Mini-link E & Traffic node
• Ericsson (6601, 2606, 2616, RRU, RNCs) installation and commissioning
• Ericsson PBC 5600
• Ericsson RBS 2G expansion
• VSWR sweep test by site master
• Site reports with full photo and data, Site Survey (new site, swapping site, RFI …)
• Report and documentation handling and arrange with complete photos and follow with the Operator.

Éducation

Diplôme, Telecommunication
  • à American university of cairo
  • juillet 2010
Baccalauréat, communicaton
  • à helwan university
  • mai 2008

BSC of communication engineering

Baccalauréat, Telecommunications and Electronics Engineering
  • à Helwan University
  • mai 2008

Specialties & Skills

RF Engineering
Roll Out
Microsoft Office - Word
Internet
2G/3G/4G
Internet of Things (IOT)
commuincations
Microsoft Office - Excel
Microsoft Office

Langues

Anglais
Expert
Arabe
Expert

Adhésions

Egyptian Engineering Syndicate
  • Engineer Membership
  • December 2008

Formation et Diplômes

CCNP (Formation)
Institut de formation:
CISCO
Date de la formation:
July 2016
CCNA (Formation)
Institut de formation:
CISCO
Date de la formation:
August 2015
Huawei Cyber Security (Certificat)
Date de la formation:
May 2016
Valide jusqu'à:
May 2020
Huawei Network Safety (Certificat)
Date de la formation:
June 2015
Valide jusqu'à:
December 2020