moataz askar, Structural Consultant

moataz askar

Structural Consultant

Honest For Real Estate Development Residential & Tourist Villages – Alexandri

Location
Egypt - Alexandria
Education
High school or equivalent, civil department
Experience
13 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 2 Months

Structural Consultant at Honest For Real Estate Development Residential & Tourist Villages – Alexandri
  • United Arab Emirates
  • January 2013 to April 2013
Project Manager at Wataneya For Development And Contracting
  • June 2009 to October 2009

(A) Implementing the project within the time schedule and budget

(B) Performing different tasks such as studying contract drawings, foreseeing conflicts between arcitectural and structural drawings, initiating sound solutions and discussing it with the consultant

(C) Monitoring manpower and project progress and efficiently utilizing equipment & other resources.

(D) Making monthly invoices and monthly progress reports and introducing modifications to time schedule as necessary to meet the final handing over date

(E) Making necessary decisions on site from day to day as required to cut expenses and keep it within budget and save if possible

(F) Discussing and negotiating price with the owner & the consultant achieving satisfactory results.

Project Manager
  • January 2009 to October 2009

Reviewing and modifying if necessary contract drawings for different project facilities.
• Reviewing and updating the time schedule of the project.
• Reviewing submittals and transmittals of the project.
• Preparing and submitting monthly progress reports.
• Reviewing invoices for the subject project.
•Finalizing material tests as per ASTM, BS and other relevant
codes.
• Site inspection of the forgoing tasks.
• Addressing weekly meetings, discussing progress, negotiating prices and providing sound solutions for problems arising on site.
Sewer Project At Helwan

Project Manager
  • November 2008 to December 2008

Reviewing and modifying if necessary contract drawings for different project facilities.
• Reviewing submittals and transmittals of the project.
•Finalizing material tests as per relevant codes.
• Site inspection of the forgoing tasks.
•Addressing weekly meetings, discussing progress, negotiating prices and providing sound solutions for problems arising on site.

Quantity Surveyor at Beverly Hills
  • Egypt
  • June 2006 to October 2008

(A) Reviewing quantity take offs for zone 4A-4B and zone S1which include excavation, backfilling, reinforced concrete, brick work, interior and exterior finishes, windows & doors, marble works, fences, landscape, plumbing, mechanical, electrical fixtures, handrails, suspended ceiling, architectural fixtures, infra structures such as, water pipelines, sewer pipelines, electrical cables, telephone cables & others.

(B) Reviewing invoices for the subject project.

(C) Initiating site work instruction (S.W.I) and variation orders (V.O) for the subject project.

(D) Reviewing as built drawings for the different superstructures and infrastructures.

The project is covering an area of about 2400 feddans including residential buildings, villas, landscape and different kinds of infra structures.

Technical Support
  • February 2005 to January 2005

Office (M.O.H.P) - Cairo
Health Sector Reform Program

Civil Engineer at Joannou & Paraskevaides – Sharm El Sheikh Four Season Resor
  • December 2002 to March 2002

(A) Executing different project components on site.

(B) Directing labors & making necessary decisions on site in conjunction with others to achieve target plan.

(C) Monitoring progress & achieving the best productivity on site.

Engineering Manager at Alex. Co
  • February 2001 to May 2001

For Engineering & Building - Alex.

Chief Office Engineer at Costain Samcrete – Cairo Dar El Fouad Hospital
  • March 1999 to May 1999

(A) Checking rebar shop drawings and bar bending schedules.

(B) Checking formwork drawings.

(C) Studying conflicts between structural and architectural drawings and providing ample solutions.

(D) Studying conflicts between grade levels and site conditions and adjusting levels as required.

(E) Calculating quantity take offs for the different structure components.

(F) Reviewing method of statement for the different construction stages.

(G) Providing solutions for problems which arise on site from day to day.

(H) Providing data for coordination of case work requirements.

(I) Preparing data and producing as built drawings.

(J) Designing steel platform for mechanical works as per AISC.

Structural Engineer at Campenon Bernard
  • August 1999 to January 1999

(A) Preparing and checking reinforcing steel drawings.

(B) Checking formwork drawings.

Chief Office Engineer at J.A.Jones Const. Co. – Cairo Air Force Aeromedical Center
  • April 1993 to August 1993

(A) Detailing rebar shop drawings and bar bending schedules.

(B) Studying conflicts between structural and architectural drawings and sending RFI's to the consultant.

(C) Checking formwork drawings.

(D) Material checks and quantity take offs.

(E) Submittal and shop drawing review.

(F) Designing R.C columns & beams as per ACI in areas of
conflict.

Structural Engineer at Islamic Community – Menouf Islamic Center
  • October 1990 to April 1990

(A) Modifying the structural design of the Islamic center skeleton in a manner which produced a substantial saving on the entire cost of the project.

(B) Supervising the foundation stage of the project.

(C) Reviewing monthly invoices and quantity take offs.

Structural Engineer at Fru-Con Const. Co
  • December 1988 to February 1988

(A) Preparing formwork drawings.

(B) Preparing rebar shop drawings and bar bending schedules.

Office Engineer at Turner Inter. Ind. – Cairo Air Force Conference Center
  • August 1987 to November 1987

(A) Detailing rebar shop drawings and bar bending schedules.

(B) Studying conflicts between structural and architectural drawings and sending RFI's to the consultant.

(C) Checking formwork drawings.

(D) Material checks and quantity take offs.

(E) Submittal and shop drawing review.

(F) Designing R.C columns & beams as per ACI in areas of conflict
(G) Designing the supporting system of the false ceiling.

(H) Making the exterior and interior finishing details.

Structural Engineer at Different R. Concrete & Steel Structures
  • June 1987 to June 1987

(A) Designing different R.C and steel structures as per the Egyptian code of practice such as underground and elevated R.C water tanks, pump stations, water treatment facilities, R.C and steel frames, flat solid slabs and flat plates for factories and storage buildings, steel trusses and saw tooth roofs, thin shell roots, water intakes, different types of foundations for structures and heavy machinery, residential buildings, earth retaining structures, thrust blocks, timber and steel joists and pipe trestles.

(B) Supervising construction of special designs to assure strict compliance to design intent.

(C) Solving design and field problems through sound engineering principles.

(D) Quantity take offs for different structures.

(E) Examining an exiting residential building defining the
nature and pattern of cracks and taking readings of the surface
hardness of R.C columns with Schmidt.

Personal Confidential Upon Request.

  • October 1983 to June 1986
  • July 1978 to October 1983
Structural Consultant
  • to

(A) Reviewing and modifying if necessary structural drawings for different health facilities.

(B) Reviewing and modifying if necessary the contract documents and specifications for the subject health facilities as per the world bank requirements.

(C) Reviewing the qualifications of consultants and contractors and producing the short list for those qualified as per the world bank requirements.

Project Director
  • to

(A) Implementing the project within the time schedule and budget

(B) Performing different tasks such as studying contract drawings,
foreseeing conflicts between site conditions and drawings,
initiating sound solutions and discussing it with the consultant
(C) Monitoring manpower and project progress and efficiently
utilizing equipment & other resources.
(D) Making monthly invoices and monthly progress reports and
introducing modifications to time schedule as necessary to meet
the final handing over date
(E) Making necessary decisions on site from day to day as
required to cut expenses and keep it within budget and save if
possible
F) Discussing and negotiating price with the owner & the
consultant achieving satisfactory results.

Misr Consulting Engineers (MCE) - Cairo
Rehabilitation Of Civil Works At Wadi Mawr (YEMEN)

Project Coordinator
  • to

(A)Reviewing and modifying if necessary contract drawings
for different project facilities.
(B)Reviewing the time schedule of the project.
(C)Reviewing submittals and transmittals of the project.
(D)Reviewing invoices for the subject project.
(E)Finalizing material as per ASTM, BS and other relevant
codes and negotiating prices.
(F)Addressing weekly meetings and discussing progress.

3. MAY 2010 till OCT 2010 Zoman El Hagry Co. - Kingdom of Saudi Arabia
Road works - El Khobar

Office Engineer at Howard Herbert Jones – Cairo Rod el Farag Water Plan
  • to

(A) Detailing rebar shop drawings and bar bending schedules.

(B) Studying conflicts between structural and architectural drawings and sending RFI's to the consultant.

(C) Checking formwork drawings.

(D) Material checks and quantity take offs.

(E) Submittal and shop drawing review.

(F) Designing R.C columns & beams as per ACI in areas of conflict
(G) Designing reinforced concrete as per ACI.

(H) Designing structural steel and cofferdams as per AISC

(I) Designing sheet piling system.

(J) Solving design and field structural problems through sound engineering principles.

(K) Examining the existing old structures defining the nature and pattern of cracks and advising an adequate remedy.

(L) Survey assignment to locate the axes and boundaries of special structure.

Consulting civil engineers (EKR) - Alex.

Education

High school or equivalent, civil department
  • at college of engineering
  • January 1995

Specialties & Skills

Structural
Consultant Coordination
CONSULTING
PROGRESS
GRAPHIC DESIGN
MECHANICAL
MICROSOFT WORKS
SUPERVISORY SKILLS