Total Years of Experience: 27 Years, 2 Months
May 2011
To Present
(Site Construction Manager)
at Wady El Nil contracting & real Estate Investments Co.
Location :
Egypt
May 2011 - Present Wady El Nil contracting & real Estate Egypt
Investments Co.
Site Construction Manager
Job Title & Abbreviation: Construction Manager (CM)
Department: Construction Department
Report to: Project Manager
Deputy: Project Engineer
Job Location: Project Site (within the area of Mansoura, Cairo)
Responsibilities and Authority
1. General supervision of all contracted work on site: programming of work, estimation of materials and maintenance of continuous workflow.
2. Monitor construction activities for the use of appropriate equipment, methods and resources, and review construction/procurement progress against the execution plan to ensure progress is as scheduled, and identify solutions and corrective actions when evaluation identifies problems.
3. Reporting to management on all aspects of site work: subcontractors’ progress, material shortage, labor unrest, and transfer of personnel/ equipment to other areas.
4. Assist in preparation of Program of Works in liaison with PM.
5. Preparation of Site Mobilization Scheme and general site requirements and presenting to the Project Manager for approval.
6. Preparation of Materials requisitions for the site and counter-signs the materials requisitions prepared by the site engineer and authorize it from PM.
7. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements of plant, material, labor and possible delays, etc.
8. Liaising with Consultants supervisory staff on daily basis and I m responsible for the site communication with the Consultant and Subcontractors.
9. Coordinating works of Subcontractors and prepares correspondence with all concerned parties consultants, Subcontractors, suppliers, clients, etc.
10. Regularly carrying-out work measurement and preparing valuations where necessary.
11. Coordinating activities with stores, purchasing department, personnel and engineering services.
12. To ensure all company procedures are being applied: working hours, material requisitioning and returns, security guards, wages procedures, holidays and leave.
13. Ensure proper implementation of site safety requirements and maintain a healthy, safe and tidy site.
(Projects).............
o In project (Naparoo Hospital) Total Area = 24000 m2, 5 floors, (With landscape) (cost 208 million L.E).
o In project (Villas Narcissus Complex ..VIP.. ) Total = 800 nos + 5 Palace (cost 24000 million L.E).
*Projects including:
Soil works
Slap on grad
R.C (Solid slab, flat slab).
Brick work, plastering, painting, Marble, Granite and Ceramic
Aluminum False ceiling, Gypsum False ceiling
Aluminum works and the other ordinary civil works).
Sanitary works.
Repair of concrete cracks
Korean works, gas system hospital
Water proofing works
Vinyl flooring
Investments Co.
Site Construction Manager
Job Title & Abbreviation: Construction Manager (CM)
Department: Construction Department
Report to: Project Manager
Deputy: Project Engineer
Job Location: Project Site (within the area of Mansoura, Cairo)
Responsibilities and Authority
1. General supervision of all contracted work on site: programming of work, estimation of materials and maintenance of continuous workflow.
2. Monitor construction activities for the use of appropriate equipment, methods and resources, and review construction/procurement progress against the execution plan to ensure progress is as scheduled, and identify solutions and corrective actions when evaluation identifies problems.
3. Reporting to management on all aspects of site work: subcontractors’ progress, material shortage, labor unrest, and transfer of personnel/ equipment to other areas.
4. Assist in preparation of Program of Works in liaison with PM.
5. Preparation of Site Mobilization Scheme and general site requirements and presenting to the Project Manager for approval.
6. Preparation of Materials requisitions for the site and counter-signs the materials requisitions prepared by the site engineer and authorize it from PM.
7. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements of plant, material, labor and possible delays, etc.
8. Liaising with Consultants supervisory staff on daily basis and I m responsible for the site communication with the Consultant and Subcontractors.
9. Coordinating works of Subcontractors and prepares correspondence with all concerned parties consultants, Subcontractors, suppliers, clients, etc.
10. Regularly carrying-out work measurement and preparing valuations where necessary.
11. Coordinating activities with stores, purchasing department, personnel and engineering services.
12. To ensure all company procedures are being applied: working hours, material requisitioning and returns, security guards, wages procedures, holidays and leave.
13. Ensure proper implementation of site safety requirements and maintain a healthy, safe and tidy site.
(Projects).............
o In project (Naparoo Hospital) Total Area = 24000 m2, 5 floors, (With landscape) (cost 208 million L.E).
o In project (Villas Narcissus Complex ..VIP.. ) Total = 800 nos + 5 Palace (cost 24000 million L.E).
*Projects including:
Soil works
Slap on grad
R.C (Solid slab, flat slab).
Brick work, plastering, painting, Marble, Granite and Ceramic
Aluminum False ceiling, Gypsum False ceiling
Aluminum works and the other ordinary civil works).
Sanitary works.
Repair of concrete cracks
Korean works, gas system hospital
Water proofing works
Vinyl flooring
November 2008
To April 2011
PROJECT ENGINEER
at COMMODORE CONTRACTING CO.
Location :
United Arab Emirates - Abu Dhabi
Department: Construction Department
Report to: Construction Manager
Deputy: Site Engineer
*Responsibilities and Authority
1. General supervision of all contracted work on site: programming and scheduling of
work, estimation of materials and maintenance of continuous workflow.
2. Preparation of Materials requisitions for the site and counter-signs the materials
requisitions prepared by the site engineer and authorize it from the PM /CM.
3. Preparing a take-off for all quantities and specifies materials for the project and
prepares Schedule of Materials forms.
4. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements
of plant, material, labor and possible delays, etc.
5. Supervision of general site-progress and directs site engineer to execute the work in the
scheme required by management.
6. Checking the materials received on site to be in compliance with requirements.
7. Checking setting out of works executed by Foreman and Site Engineer.
8. Efficient distribution of material and utilization of manpower.
9. Ensuring the safety of personnel and company assets.
10. To ensure all company procedures are being applied: working hours, material
requisitioning and returns, transfer of PMV, security guards, wages procedures, holidays
and leave.
11. Ensure proper implementation of site safety requirements and maintain a healthy, safe
and tidy site.
(Project)...
(ALaryam tower)Area=60000m2. 40floors(cost 450 million AED)
*Projects including:
„Ï Soil works
„Ï Piles and pile capes and all kind of foundation.
„Ï R.C ( flat slab).
„Ï Brick work, plastering, painting, Marble, Granite, Ceramic
„Ï Aluminum False ceiling, Gypsum False ceiling
„Ï Aluminum works, and the other ordinary civil works).
„Ï Sanitary works.
„Ï Repair of concrete cracks,
„Ï jet grout, Diaphragm wall, anchors, piles, dewatering system.
„Ï Excavation Works.
„Ï Korian works
„Ï Swimming pool
„Ï Sauna, Steam room
„Ï Water proofing works
„Ï Vinyl flooring
Report to: Construction Manager
Deputy: Site Engineer
*Responsibilities and Authority
1. General supervision of all contracted work on site: programming and scheduling of
work, estimation of materials and maintenance of continuous workflow.
2. Preparation of Materials requisitions for the site and counter-signs the materials
requisitions prepared by the site engineer and authorize it from the PM /CM.
3. Preparing a take-off for all quantities and specifies materials for the project and
prepares Schedule of Materials forms.
4. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements
of plant, material, labor and possible delays, etc.
5. Supervision of general site-progress and directs site engineer to execute the work in the
scheme required by management.
6. Checking the materials received on site to be in compliance with requirements.
7. Checking setting out of works executed by Foreman and Site Engineer.
8. Efficient distribution of material and utilization of manpower.
9. Ensuring the safety of personnel and company assets.
10. To ensure all company procedures are being applied: working hours, material
requisitioning and returns, transfer of PMV, security guards, wages procedures, holidays
and leave.
11. Ensure proper implementation of site safety requirements and maintain a healthy, safe
and tidy site.
(Project)...
(ALaryam tower)Area=60000m2. 40floors(cost 450 million AED)
*Projects including:
„Ï Soil works
„Ï Piles and pile capes and all kind of foundation.
„Ï R.C ( flat slab).
„Ï Brick work, plastering, painting, Marble, Granite, Ceramic
„Ï Aluminum False ceiling, Gypsum False ceiling
„Ï Aluminum works, and the other ordinary civil works).
„Ï Sanitary works.
„Ï Repair of concrete cracks,
„Ï jet grout, Diaphragm wall, anchors, piles, dewatering system.
„Ï Excavation Works.
„Ï Korian works
„Ï Swimming pool
„Ï Sauna, Steam room
„Ï Water proofing works
„Ï Vinyl flooring
February 2004
To October 2008
Site Construction Manager
at Wady El Nil contracting & real Estate Investments Co. (Site Construction Manager)
Location :
Egypt
Feb 2004 - Oct 2008 Wady El Nil contracting & real Estate . Egypt
Investments Co.
Site Construction Manager
Job Title & Abbreviation: Construction Manager (CM)
Department: Construction Department
Report to: Project Manager
Deputy: Project Engineer
Job Location: Project Site (within the area of Mansoura-Damitta)
Responsibilities and Authority
1. General supervision of all contracted work on site: programming and scheduling of work, estimation of materials and maintenance of continuous workflow.
2. Monitor construction activities for the use of appropriate equipment, methods and resources, and review construction/procurement progress against the execution plan to ensure progress is as scheduled, and identify solutions and corrective actions when evaluation identifies problems.
3. Reporting to management on all aspects of site work: subcontractors’ progress, material shortage, labor unrest, and transfer of personnel/ equipment to other areas.
4. Assist in preparation of Program of Works in liaison with PM..
5. Preparation of Site Mobilization Scheme and general site requirements and presenting to the Project Manager for approval.
6. Preparation of Materials requisitions for the site and counter-signs the materials requisitions prepared by the site engineer and authorize it from PM.
7. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements of plant, material, labor and possible delays, etc.
8. Liaising with Consultants supervisory staff on daily basis and he is responsible for the site communication with the Consultant and Subcontractors.
9. Coordinating works of Subcontractors and prepares correspondence with all concerned parties consultants, Subcontractors, suppliers, clients, etc.
10. Regularly carrying-out work measurement and preparing valuations where necessary.
11. Coordinating activities with stores, purchasing department, personnel and engineering services.
12. To ensure all company procedures are being applied: working hours, material requisitioning and returns, security guards, wages procedures, holidays and leave.
13. Ensure proper implementation of site safety requirements and maintain a healthy, safe and tidy site.
(Projects).............
In project (Ramada hotel) Total Area = 18000m2, 12floors, (With landscape) (cost 155 million L.E).
In project ( Damietta Hospital) Total Area =
25000 m2, 7 floors, (With landscape) (cost195 million L.E).
*Projects including:
Soil works
Piles, dewatering system.
Excavation Works.
pile capes and all kind of foundation.
Slap on grad
R.C (Solid slab, and flat slab).
Brick work, plastering, painting, Marble, Granite, and Ceramic
Aluminum False ceiling, Gypsum False ceiling
Aluminum works, Grc works, Grb works, and the other ordinary civil works).
Sanitary works.
Repair of concrete cracks
Korean works, gas system hospital
Swimming pool
Sauna, Steam room
Water proofing works
Investments Co.
Site Construction Manager
Job Title & Abbreviation: Construction Manager (CM)
Department: Construction Department
Report to: Project Manager
Deputy: Project Engineer
Job Location: Project Site (within the area of Mansoura-Damitta)
Responsibilities and Authority
1. General supervision of all contracted work on site: programming and scheduling of work, estimation of materials and maintenance of continuous workflow.
2. Monitor construction activities for the use of appropriate equipment, methods and resources, and review construction/procurement progress against the execution plan to ensure progress is as scheduled, and identify solutions and corrective actions when evaluation identifies problems.
3. Reporting to management on all aspects of site work: subcontractors’ progress, material shortage, labor unrest, and transfer of personnel/ equipment to other areas.
4. Assist in preparation of Program of Works in liaison with PM..
5. Preparation of Site Mobilization Scheme and general site requirements and presenting to the Project Manager for approval.
6. Preparation of Materials requisitions for the site and counter-signs the materials requisitions prepared by the site engineer and authorize it from PM.
7. Preparation of bi-weekly and/or Monthly reports for the site highlighting requirements of plant, material, labor and possible delays, etc.
8. Liaising with Consultants supervisory staff on daily basis and he is responsible for the site communication with the Consultant and Subcontractors.
9. Coordinating works of Subcontractors and prepares correspondence with all concerned parties consultants, Subcontractors, suppliers, clients, etc.
10. Regularly carrying-out work measurement and preparing valuations where necessary.
11. Coordinating activities with stores, purchasing department, personnel and engineering services.
12. To ensure all company procedures are being applied: working hours, material requisitioning and returns, security guards, wages procedures, holidays and leave.
13. Ensure proper implementation of site safety requirements and maintain a healthy, safe and tidy site.
(Projects).............
In project (Ramada hotel) Total Area = 18000m2, 12floors, (With landscape) (cost 155 million L.E).
In project ( Damietta Hospital) Total Area =
25000 m2, 7 floors, (With landscape) (cost195 million L.E).
*Projects including:
Soil works
Piles, dewatering system.
Excavation Works.
pile capes and all kind of foundation.
Slap on grad
R.C (Solid slab, and flat slab).
Brick work, plastering, painting, Marble, Granite, and Ceramic
Aluminum False ceiling, Gypsum False ceiling
Aluminum works, Grc works, Grb works, and the other ordinary civil works).
Sanitary works.
Repair of concrete cracks
Korean works, gas system hospital
Swimming pool
Sauna, Steam room
Water proofing works
January 2000
To December 2003
Project Engineer
at A.C (American Center) (Project Engineer
Location :
Egypt - Cairo
Projects including:
Soil works
pile capes .
Brick work, Marble
Sanitary works.
Repair of cracks, columns Jacket
jet grout, micro Piles, dewatering system.
Excavation Works.
Soil works
pile capes .
Brick work, Marble
Sanitary works.
Repair of cracks, columns Jacket
jet grout, micro Piles, dewatering system.
Excavation Works.
May 1998
To December 1999
site engineer
at Sefi . Fontec France CO. (Site Engineer
Location :
Egypt - Cairo
Projects including:
Soil works
Piles and pile capes and all kind of foundation.
jet grout, Diaphragm wall, anchors, micro Piles, piles, dewatering system.
Excavation Works.
Soil works
Piles and pile capes and all kind of foundation.
jet grout, Diaphragm wall, anchors, micro Piles, piles, dewatering system.
Excavation Works.
August 1997
To April 1998
site engineer
at High Stael CO.(Site Engineer) Aug. 1997 till April. 1998
Location :
Egypt
Projects including:
Soil works .
Slap on grad
R.C (Solid slab, hollow blocks slab and flat slab)
civil works) .
Excavation Works.
Water proofing works
Soil works .
Slap on grad
R.C (Solid slab, hollow blocks slab and flat slab)
civil works) .
Excavation Works.
Water proofing works
Share on Facebook
Share on Twitter
Share Via Email