Total Years of Experience: 24 Years, 0 Months
September 2018
To Present
Consultant
at Salfo and Associates SA
Location :
United Arab Emirates - Abu Dhabi
Position: Assistant Resident Engineer - Water
Project: Supervision of Internal Roads and Infrastructure Works for South West Sector 17, Khalifa City - Abu Dhabi - Client -MUSANADA
Duties and Responsibilities:
• - Review all shop drawings, profiles and As built drawings for water network .
• - Review Method of Statements related to water network at site.
• - Review Material Submittals required for all fittings, pipes and water Chambers.
• - Site Supervision of water network execution and direct inspectors/contractor at site.
• - Review WIRs related to water network.
• - Attending progress and technical meetings.
• - Coordinate with, the clients (MUSANADA& ADDC ) and authorities
• - Coordinating and orienting contractor.
• - Coordinate and work with other disciplines during construction
of the project to meet the project objectives.
Project: Supervision of Internal Roads and Infrastructure Works for South West Sector 17, Khalifa City - Abu Dhabi - Client -MUSANADA
Duties and Responsibilities:
• - Review all shop drawings, profiles and As built drawings for water network .
• - Review Method of Statements related to water network at site.
• - Review Material Submittals required for all fittings, pipes and water Chambers.
• - Site Supervision of water network execution and direct inspectors/contractor at site.
• - Review WIRs related to water network.
• - Attending progress and technical meetings.
• - Coordinate with, the clients (MUSANADA& ADDC ) and authorities
• - Coordinating and orienting contractor.
• - Coordinate and work with other disciplines during construction
of the project to meet the project objectives.
March 2015
To September 2018
Senior Water Engineer
at M/s China Harbour Engineering Company
Location :
Qatar - Doha
Project : East Corridor P011-Doha-Client Ashghal
•Duties and Responsibilities:
•- In charge for all technical issues all shop drawings, profiles for water Ductile Iron transmission pipelines 35 KM, diameters 1400, 1200, 900 mm.
•- Preparing All Method of Statement related to the work at site .
•- Materials Surveying required for all fittings, pipes and water Chambers.
•- Attending progress and technical meetings.
•- Coordinating and orienting subcontractors.
•- Coordinate with the consultant, the clients (Kahramaa & Ashghal ) and authorities.
•- Coordinate and work with other disciplines during procurement services/construction phases of the project to meet the project objectives.
•Duties and Responsibilities:
•- In charge for all technical issues all shop drawings, profiles for water Ductile Iron transmission pipelines 35 KM, diameters 1400, 1200, 900 mm.
•- Preparing All Method of Statement related to the work at site .
•- Materials Surveying required for all fittings, pipes and water Chambers.
•- Attending progress and technical meetings.
•- Coordinating and orienting subcontractors.
•- Coordinate with the consultant, the clients (Kahramaa & Ashghal ) and authorities.
•- Coordinate and work with other disciplines during procurement services/construction phases of the project to meet the project objectives.
September 2007
To October 2009
Engineer
Location :
United Arab Emirates
and Responsibilities:
Prepairing shop drawings for all projects in the company for water & waste-water branch, request the materials, check the work in site with junior engineers . The value of projects up to 200 million ( AED
Prepairing shop drawings for all projects in the company for water & waste-water branch, request the materials, check the work in site with junior engineers . The value of projects up to 200 million ( AED
August 2004
To June 2007
Consultant Engineer
at Directorate of Military Works Ministry of Defense
Location :
United Arab Emirates
December 2000
To April 2002
Office Engineer
at Arab Contractors
Location :
Egypt
I make survey for the various projects in our branch and study the progress and the delay for each project, the profit and the lost, the reasons for lost or delay and the procedure to solve
April 1999
To December 2000
Infrastructure Engineer
at Arab Contractors
Location :
Egypt
Projects: Morocco Branch Projects
•Duties and Responsibilities:
This project cost was 10 million USD including construction of 30 km roads and 30km gravity R.C. sewer pipes different diameters from 200 too 1000 mm, the client was NATIONAL OFFICE OF AIRPORT, in this project I prepare the B.O.Q. for subcontractors, make the monthly payments, make the quantity surveyor and take the final approval of the client engineer, check the quality control in site and take the approval for all items from the client engineer such as backfilling of roads, leveling, taking samples for compacted layers, leveling of pipes manholes
•Duties and Responsibilities:
This project cost was 10 million USD including construction of 30 km roads and 30km gravity R.C. sewer pipes different diameters from 200 too 1000 mm, the client was NATIONAL OFFICE OF AIRPORT, in this project I prepare the B.O.Q. for subcontractors, make the monthly payments, make the quantity surveyor and take the final approval of the client engineer, check the quality control in site and take the approval for all items from the client engineer such as backfilling of roads, leveling, taking samples for compacted layers, leveling of pipes manholes
December 1996
To April 1999
Site Engineer
at Arab Contractors
Location :
Egypt
Projects: Sherbien Sewage Project
•Duties and Responsibilities:
the total cost of this project was 25 million Egyptian pounds, containing 35 km of gravity clay sewer pipes different diameters from 7 to 30 inches including manholes from 1.5 to 7 m depth, 5 lift stations diameter from 8 to 16 m with depth from 8 to 15m, force lines ductile iron with diameter 200 to 500 mm. I was quality control engineer
in this project, inspection of every item in the field such as leveling of the branches, seepage test, pressure test, backfilling, final approval to the client.
•Duties and Responsibilities:
the total cost of this project was 25 million Egyptian pounds, containing 35 km of gravity clay sewer pipes different diameters from 7 to 30 inches including manholes from 1.5 to 7 m depth, 5 lift stations diameter from 8 to 16 m with depth from 8 to 15m, force lines ductile iron with diameter 200 to 500 mm. I was quality control engineer
in this project, inspection of every item in the field such as leveling of the branches, seepage test, pressure test, backfilling, final approval to the client.
December 1995
To November 1996
Site Engineer
at Arab Contractors
Location :
Egypt
Projects: Post Graduate Studies, El-Mansoura University
•Duties and Responsibilities:
This period includes operation of the model and finishing of the practical research for M.Sc
•Duties and Responsibilities:
This period includes operation of the model and finishing of the practical research for M.Sc
December 1994
To December 1995
Site Engineer
at Arab Contractors
Location :
Egypt
Projects: El-Mansoura-School buildings
•Duties and Responsibilities:
The cost of this project was 4 million Egyptian pounds, construction of 5 multi-store school building, quality control of work, make shop drawings for execution , prepare monthly payments and quantities for client agreement.
•Duties and Responsibilities:
The cost of this project was 4 million Egyptian pounds, construction of 5 multi-store school building, quality control of work, make shop drawings for execution , prepare monthly payments and quantities for client agreement.
October 1993
To December 1994
Site Engineer
at Arab Contractors
Location :
Egypt
This project was construction of multi-store administration building and fire building, this including all the items such as excavation, foundation, reinforced concrete, insulation, masonry, plaster, marble, painting, finishing
The total cost was about 3 million Egyptian pounds, I was both QC &QS engineer in this project.
The total cost was about 3 million Egyptian pounds, I was both QC &QS engineer in this project.
May 1992
To October 1993
Site Engineer
at Arab Contractors
Location :
Egypt
Projects: Post Graduate Studies El-Mansoura University
•Duties and Responsibilities:
This period I studied courses in preparing year for Masters Degree including courses in sanitary such as advanced water& wastewater, industrial wastewater treatment.
•Duties and Responsibilities:
This period I studied courses in preparing year for Masters Degree including courses in sanitary such as advanced water& wastewater, industrial wastewater treatment.