1-Beni Suef combind cycle 4800 MW
- all buildings HVAC, fire protection and plumbing Works
- all company scope of work buildings ( GIS, CCB, Gas turbine, steam turbine and adminstration) coordination
2- AL Mostasmeren sub station 66 K.V.,
220K.V., CCB
3-ministeries project in New capital
- all buildings HVAC, fire protection and plumbing Works
- all company scope of work buildings ( GIS, CCB, Gas turbine, steam turbine and adminstration) coordination
2- AL Mostasmeren sub station 66 K.V.,
220K.V., CCB
3-ministeries project in New capital
August 2014
To December 2015
مدير الاعمال الميكانيكيه
at مؤسسة الافتكار للتجاره والمقاولات
Location :
Saudi Arabia - Riyadh
تصميم اعمال التهويه والتكييف والاعمال الصحيه واعمال مكافحة الحريق
التنسيق بين اعمال الميكانيكا والكهرباء والاعمال المدنيه والمعماريه
تنفيذ اعمال الميكانيكا واعمال الموقع العام
التنسيق بين اعمال الميكانيكا والكهرباء والاعمال المدنيه والمعماريه
تنفيذ اعمال الميكانيكا واعمال الموقع العام
January 2011
To August 2014
technical office section head- project management section head
at el sewedy -engineering
Location :
Egypt
1- designing the following machines(crushing m/c-cable sim cutter-balancing machine-tank 30 MVA)
2-marassi water pump station site manager
3-up town Cairo site manager for the installation of water pump station and sewage pump station
4-marassi irrigation pump station site manager
5- manager of installation of water meters and electerical meters in all clusters in marassi
2-marassi water pump station site manager
3-up town Cairo site manager for the installation of water pump station and sewage pump station
4-marassi irrigation pump station site manager
5- manager of installation of water meters and electerical meters in all clusters in marassi
June 2008
To January 2011
mechanical maintenance engineer
at el sewedy cables-egypt
Location :
Egypt
1-testing and eraction of (v.c.v. line, drum twister 4000, strainding 61, drawing neihoff, hfsab lead, screening and opgw) m/c
2-performing predictive, preventive and sudden maintenance
3-performing spare part list for all machines
4-performing any modification when need
2-performing predictive, preventive and sudden maintenance
3-performing spare part list for all machines
4-performing any modification when need
September 2007
To June 2008
design engineer
at engineering task group
Location :
Egypt
1-performing design calculation for all machines
2-performing design drawings
2-performing design drawings
Share on Facebook
Share on Twitter
Share Via Email