Mohamed Mokhtar Shoieb, Senior Resident Engineer

Mohamed Mokhtar Shoieb

Senior Resident Engineer

Engineering Consultants Group

Location
Egypt
Education
Master's degree, Construction Management
Experience
36 years, 0 months

Share My Profile

Block User


Work Experience

Total years of experience :36 years, 0 months

Senior Resident Engineer at Engineering Consultants Group
  • Egypt - Alexandria
  • My current job since January 2019

• Greek Village - North Coast at KM 137 - MARASSI Village for EMAAAR as Owner, GLEEDS as project management and Arabian Construction Company (ACC) as Main contractor - Different types of villas including all public facilities with total value of 4, 000 Million LE - Under Construction.
• New Alamein City - Latin District Residential Compound including all public facilities (71 Building of 2 Basement + Ground + 4 to 7 Typical floors) - 8, 000 Million LE for Housing & Residential Ministry as Owner and ORASCOM Contracting Co. SA. as Main Contractor - Under construction.

Engineering Director at Almadaenmisr Investment’s & Real-estate Company
  • January 2016 to December 2018

Alexandria -
Egypt.
• Two Residential Building - Smouha Capital Center (Ground + 10 Typical floors) - 75 Million LE at
Smouha, Alexandria, Egypt - Under construction.
• Residential Building (Ground + 9 Typical floors) - 16 Million LE at Elsyoof, Alexandria, Egypt.
• Complex Compound of (Basement + Mall 3 floors on 4500 m2 + 5 Towers 8 typical floors) - 450
Million LE at Damanhoura at Main Alexandria - Cairo Road - Buhira area.

General Manager at Alexandria – Egyp
  • February 2012 to December 2015

Greenalex General Contracting and Consultation’s office - Alexandria -
Egypt.
• Residential Building (Ground + 15 Typical floors) - 9 Million LE for Mr.Meelad and Mr. Taalat at
Miami, Alexandria, Egypt.
• Residential Building (Ground + 16 Typical floors) - 8 Million LE for Mr.Ahmed Goomaa at Sidi Besher,
Alexandria, Egypt.
• Coastal Village for 18 Room at North Coastal at Km 77 (Ayida Village) - 12 Million LE at Ayida Village
Km 77.250 North Coast - Alexandria / Matrooh Road.
• Structural Solutions and repair for many inclined buildings, Cracked Structural buildings, and many
other cases.
• Solar Energy Station for 500 KW On-Grade at Alexandria - Matroooh Road - KM 77 for Mr. Ibraheem
Taha.
• Full Repair of the walls, Roof and all mega size tanks (5000 to 20, 000 M3) for Waste treatment
Station for Water Holding Company.
• Engineering support for the construction of Water Treatment station for 5000 M3 daily for M/s

Executive Manager at Ali Bin Salem Contracting Company L.L.C
  • United Arab Emirates - Dubai
  • March 2003 to January 2012

• Residential Building (3 Basement+ Ground + 21 Typical floors) - 120 Million Dhs for Mr.Jahed Kareem and M/s DARTIN Engineering Consultant at Dubai Sport City - Dubai.
• Residential Building (2 Basement+ Ground + 19 Typical floors) - 82 Million Dhs for Mr.Fawaz AL Khatieb and M/s Space Engineering Consultant and Prago-project Project Management at Dubai Jumierah Village City - Dubai.
• Labour Camp (300 Room) - 24 Million Dhs for M/s Khalid Gamal AL Ghurair Real estate & M/s Dr.Hisham Laham Engineering Consultant office at Al-Quasis 3rd, Dubai.
• Residential Building (Basement+ Ground + 17 Typical floors) - 75 Million Dhs for Mr.Jahed Kareem and M/s DARTIN Engineering Consultant at Dubai Sport City - Dubai.
• Club for Women Association of Dubai at Hatta - 23 Million Dhs for Dubai Municipality - Project’s Department and M/s ECG - Engineering Consultant Group (Overseas International Consultant Office).
• Labour Camp (540 Room) - 42 Million Dhs for M/s Ali Bin Salem Contracting Company & M/s ART at Al-Quasis 3rd, Dubai.
• Prestigious luxury palace -12 Million Dhs for H.H Shikah Moza Bin Zayed & M/s Eng: Adnan Saffarini consultant office at AL Mezher 2nd, Dubai.
• Residential Building Ground + 2 Typical floors - 6 Million Dhs for Mr.Ahmed Al Gaziry & M/s Eng: Adnan Saffariny consultant office at AL Muteena Road - Dubai.

Planning Engineer at Dubai – U.A.E
  • United Arab Emirates
  • October 2001 to April 2003

Support and direct the planning & the follow up activities.
• Establish the planning & follow up system in the projects.
• Optimise the company resources usage between the projects on weekly basis as per studied
sub-programs co-ordinating with the operation manager and GM.
• Evaluate & put the strategy plan to recover the delays in the projects and follow it.
• Prepare the master company progress status report (Includes all the company projects) for the
senior management review and for them action plan.
Mohamed Mokhtar Curriculum Vita Page 4
• Check the required planned resources for the tendered projects with the company future
planned resources.
• Co-ordinate between the planned revenue of the projects and company master plan with GM.
• Extension of time claim review and finalisation with the commercial manager to the engineer
approval.
• Discuss and achieve the department targets co-ordinating with the other department’s
managers and GM.
• General representation of the company at a senior level as required
Projects participated by me: -
• Extension of Terminal 2 - Dubai International Airport AX272D -25 Million Dhs.
• Internal Upgrade works -Dubai International Airport (High Prestigious Finishes works) -75 Million Dhs.
• On / Off Shore works for Qatar fertiliser factory (QAFO) in Qatar - 180 Million Dhs.
• Construction of 2 luxury hotels, the grand parking and the external works of the Conference palace of
the Gulf Countries -Abu Dhabi-1, 300 Million Dhs (Joint venture with Arabian Construction Co.- ACC).

Planning Engineer at Dubai – U.A.E
  • June 1997 to August 2001

(Same as per earlier)
Projects participated by me:-
• Construction of the extension of runway - 45 Million Dhs - and taxiway of Sharjah International Airport
including the entire required infrastructure works with Hallcro international Consultant office.
• Wadi AL Basseiurah and AL Fay Dams - 85 Million Dhs - (Compacted aggregate dam has 1500 M
Long and 25 (at the top)/70 (at the bottom) M width includes 12 KM Road to AL Basseiurah city for
Ministry of Agriculture and fishers and W.S.Atkins & Overseas Partners.
• New roads and car parks - 38 Million Dhs - in different locations in Sharjah (Includes infrastructure
works) for Sharjah Municipality.
• Emirates Hills Infrastructure Development Package no. 1- 120 Million Dhs - (for 450 Villa) (Includes
construction of lakes, roads, street lighting, etisalat cabling, Kerbs and footpaths for EMMAR and
Parsons Int.

Planning & Cost Control Manager at Dubai – U.A.E
  • August 1994 to May 1997

(Same as per earlier)
Projects participated by me.
• ENOC Main Offices Building - Ground and 4 typical floors at AL Garhood Rd. for Emirates National
Oil Company and Khatib & Alami international Consultant office.
• Grand Mosque at Bur Dhabi for H.H. Ruler's Office and Arenco Consultant office.
• 50 Villas (Ground and 1 St. Floor) at Airport Road for Dubai Air wing and Rice Perry Ellis international
Consultant office.
• Dubai Water Leakage Detection & Network Restitution project including laying 92 KM of PVC 1000,
750, 500 mm diameter, construction of 120 Valve chambers, 2 pump station and 9000 House
connections. At different five locations in Dubai (Al Satwa, Jabel Ali, Al Quoz, Al Aweer, Nad Al
Sheba) for Dubai Electrical & Water Authority and Parsons international consultant office.
Duties & Responsibilities for Project Management Duration:-
• Direction of Site In-Charge.
• Responsible for the project operations productivity.
Mohamed Mokhtar Curriculum Vita Page 5
• Responsible for ensuring project controls and plans are implemented and site reporting is
carried out.
• Responsible for monitoring project progress and reviewing with the General Manager the
implementation of corrective action when necessary.
• Materials handling and wastage control.
• Project budget review and control on a monthly basis.
• Ensure that documents from site are timely prepared and transmitted to Head Office
concerning materials receipts, daily reports, requisitions, labour cards...etc.
• Receipt of all variations and change orders and assessment of impact on the approved
Construction Schedule within 48 hours from receipt of variation or change order.
• Timely valuation and billing of the works in accordance with the periods contained in the
Contract Conditions or as directed at regular intervals by the General Manager, or end of each
month at the latest.
• Report to General Manager all variances from project base plans; time schedules etc., on a
weekly basis.
• Ensure compliance with safety regulations.
• Implementation of Quality Procedures.
• Take required actions on Site Engineers and other staffs for any serious flaws or deviations
from the standard norms of company policy and procedures.
• Attending Site Meetings.
• Coordination with the Consultant and also to all Sub-Contractors on a regular basis not
exceeding two week intervals.
Projects executed and completed by myself (As Project Manager):-
• Luxury Villa (Ground and 1 St. Floor) for Sheikh Salem Al Sabah and Test Consultant office.
• 32 Villas (Ground and 1 St. Floor) at Zayed Rd. (Interchange no 4) for H.H. Sheikh Saud Bin Rashed
Al Moalla and Arenco Consultant office.
• Showroom & Warehouse at Al Aweer for Mr. Saeed Mohamed Al Ghandi and Arif & Bintoak
Consultant office.

Project Manager
  • March 1988 to August 1994

Ministry of Public Works and Water Resources (Projects Section), Egypt.
Duties & Responsibilities:- (Same as per earlier)
Projects executed and completed by myself:-
• Irrigation Improvement project for west of Kafer AL Sheikh City including construction of 5 no. Of 12-m
width & 60 m length bridges, 3 regulators and 10 Km Water supply pipes (0.5 to 1.2-Meter Diameter).
• Land & 2 tower Water concrete tanks and pumping stations project at east of Tanta.
• Design steel, concrete bridges crossing the river and different types of regulators.
• AL Montaza Tower - 16 Million E.P - (Ground + 12 typical floors) located in AL Montaza Road in
Alexandria for Mr. Baiomee and Dr. Khalil engineering consultant office.
• G+7 Building in AL Mamoura in EL Etisalat road - Alexandria for Mr. Mahmood AL Hady and his
brothers.
• G+7 Building in Tanta for Dr. Omar Al Sebakhy - 4 Million E.P.

Education

Master's degree, Construction Management
  • at Srarsdale University
  • January 1999

in

Bachelor's degree, Construction Management
  • at AL Mansoura University
  • January 1987

.c Civil Engineering degree,

Specialties & Skills

SME management
Contract Management
BUDGETING
CONSULTING
MICROSOFT OFFICE
MICROSOFT WORKS
NETWORKING
PROGRESS
PROJECT MANAGEMENT
QUALITY
BRIDGES