مجموع سنوات الخبرة: 21 سنوات, 5 أشهر
نوفمبر 2019
إلى حتى الآن
Technical Office Manager
في EGEC Consultant Office
البلد :
مصر - الأقصر
Work in supervising of Integrated Sanitation Technologies in Some Rural Areas in Upper Egypt
funded by The International Bank, consisting of 15 projects in the villages of Qena, Al-Sharif Al-
Bahari and Al-Makhadah of the Qena Center and the villages of Al-Shoqifi, Al-Hussainat and
Bakhans belonging to the Abu_Tisht Center.
funded by The International Bank, consisting of 15 projects in the villages of Qena, Al-Sharif Al-
Bahari and Al-Makhadah of the Qena Center and the villages of Al-Shoqifi, Al-Hussainat and
Bakhans belonging to the Abu_Tisht Center.
أكتوبر 2002
إلى حتى الآن
Technical Office Manager
وجدت هذه الوظيفة عبر بيت.كوم
في المكتب الاستشاري إيچك
البلد :
مصر - قنا
Job role: - Technical office Manager
Worked at EGEC Office - Work in supervising of Integrated Sanitation Technologies in Some Rural Areas in Upper Egypt funded by The International Bank, consisting of 15 projects in the villages of Qena, Al-Sharif Al-Bahari and Al-Makhadah of the Qena Center and the villages of Al-Shoqifi, Al-Hussainat and Bakhans belonging to the Abu_Tisht Center
Worked at EGEC Office - Work in supervising of Integrated Sanitation Technologies in Some Rural Areas in Upper Egypt funded by The International Bank, consisting of 15 projects in the villages of Qena, Al-Sharif Al-Bahari and Al-Makhadah of the Qena Center and the villages of Al-Shoqifi, Al-Hussainat and Bakhans belonging to the Abu_Tisht Center
يناير 2019
إلى حتى الآن
Technical Office Manager
في مكتب إيچك للاستشارات الهندسية- EGEC- بيت خبرة هندسي
البلد :
مصر - قنا
Preparation of project-specific assays (lists of quantities).
- Preparation of special submission documents.
- Preparation of the preliminary quantity inventory for the project.
- Calculation of preliminary estimate of project cost.
- Supervision and evaluation of the project tender and differentiation between tenders
submitted by contractors.
- Review of Shop Drawing and As-build Drawing panels provided by contracting companies.
- Review and certification of quantities and extracts submitted by contractors.
- Certification of ores and samples for the duration of the project.
- Review of any panel modifications during the implementation period.
- Documentation of all project documents throughout the implementation period.
- Follow-up on the project's workflow rate.
- Preparation of special submission documents.
- Preparation of the preliminary quantity inventory for the project.
- Calculation of preliminary estimate of project cost.
- Supervision and evaluation of the project tender and differentiation between tenders
submitted by contractors.
- Review of Shop Drawing and As-build Drawing panels provided by contracting companies.
- Review and certification of quantities and extracts submitted by contractors.
- Certification of ores and samples for the duration of the project.
- Review of any panel modifications during the implementation period.
- Documentation of all project documents throughout the implementation period.
- Follow-up on the project's workflow rate.
يناير 2017
إلى نوفمبر 2019
Technical office engineer
Work in The Engineering administration - South Valley University in Qena - Supervision of the
establishment of the Faculty of Physical Therapy, the development and renovation of University
cities (annual maintenance). With a budget of 280 million pounds annually.
establishment of the Faculty of Physical Therapy, the development and renovation of University
cities (annual maintenance). With a budget of 280 million pounds annually.
ديسمبر 2006
إلى سبتمبر 2013
في Travco Engineering & Construction Co
Field of work : implementation and finishing (Aquaquiva Resort and Aqua Park - Makadi -
Hurghada) costs 650 million pounds, and consists of: 500 chalet, the main building, 10 swimming
pools, pump rooms and Solar Tank room and transformer room, 2 waterfall 1 fountain in the main
building, 3 restaurants and kitchens attached to them, boiler building, tennis court as well as green
spaces and walkers with concrete covered with 60% Total area, 2 Staff building (108 apartments).
Hurghada) costs 650 million pounds, and consists of: 500 chalet, the main building, 10 swimming
pools, pump rooms and Solar Tank room and transformer room, 2 waterfall 1 fountain in the main
building, 3 restaurants and kitchens attached to them, boiler building, tennis court as well as green
spaces and walkers with concrete covered with 60% Total area, 2 Staff building (108 apartments).
يونيو 2011
إلى مايو 2013
Structural Engineer
Mecca: - Supervising the construction of 2 commercial residential hotels
The first hotel is 26 floors at a total cost of SR 87, 500, 000.
The second hotel is 26 floors at a total cost of SAR 40, 500, 000.
Field of work:
The first hotel is 26 floors at a total cost of SR 87, 500, 000.
The second hotel is 26 floors at a total cost of SAR 40, 500, 000.
Field of work:
سبتمبر 2007
إلى يناير 2011
في Pathfinder
البلد :
لبنان
Worked in "Integration of reproductive health services"Project
سبتمبر 2006
إلى أغسطس 2007
Worked at (Abu Ashra Group) Co. - Hurghada
Field of work: - Construction of tourist center building, implementation of a hotel consisting of
ground floor and four floors (28 rooms each one ).
Field of work: - Construction of tourist center building, implementation of a hotel consisting of
ground floor and four floors (28 rooms each one ).
مارس 2005
إلى سبتمبر 2006
- Supervising the implementation of a sewage project for five villages -
Qus - Qena (Swiss aid) with a total value of 25 million pounds, including:
1. Implementation of the main network of water supply lines for five villages (315 mm, 400 mm, 560
mm P.V.C pipes).
2 - Implementation of the gradient lines, main lines and lifting stations for five villages (diameters
160 mm, 250 mm, 315 mm, 400 mm, 560 mm pipes P.V.C.).
3. Rehabilitation of the water purification plant in one of the five villages. 4 - Implementation of 2
Elevated tank .
Qus - Qena (Swiss aid) with a total value of 25 million pounds, including:
1. Implementation of the main network of water supply lines for five villages (315 mm, 400 mm, 560
mm P.V.C pipes).
2 - Implementation of the gradient lines, main lines and lifting stations for five villages (diameters
160 mm, 250 mm, 315 mm, 400 mm, 560 mm pipes P.V.C.).
3. Rehabilitation of the water purification plant in one of the five villages. 4 - Implementation of 2
Elevated tank .
ديسمبر 2003
إلى مارس 2005
Administration
Worked at Engineering