Field Service Engineer(FSE)
Ceren Elektronik
Total years of experience :0 years, 10 months
Health Care Department: Installation & Calibration of Philips Defibrillator (HeartStart MRx)
Development: Upgrading and Testing of new software into Defibrillator
Maintenance Department: Enveloping, servicing & doing the FCO’s of the defibrillator for around 100 devices in Riyadh, Madinah & Tabuk region
Saudi United for Mechanical, Electrical and Electronic Industries Corp. (Member of Abu Nayyan Group), Riyadh, Kingdom of Saudi Arabia.
Site: Information Technology and Communication Center, (ITCC) Riyadh
• Control Panel: Installation, modes of low, medium and high voltage panels
• Commissioning and Testing: Torque, Current and voltage testing. Post complete checking of the panels after installation
General Electric (G.E.) Health Care, Riyadh, Kingdom of Saudi Arabia.
• Health Care Department: Installation, features, modes and benefits of X-Ray equipment (XR-656/650)
• Development: Upgrading and Testing of new software into monitors (used in patient monitoring)
• Maintenance Department: Enveloping and servicing of X-RAY table, OTS (Overhead Tube Stand), Wall
A. Abu Nayyan Electric Corp., Riyadh
• Automation Department: Basically worked on SCADA (Supervisory Control And Data Acquisition)
systems using PLC
• Fabrication Department: Assembly and fabrication of Control Panels of different ranges
• Management Department: Project management techniques and how to be an Entrepreneur
Subjects of Interest
• Logic Design, µC, µP, DSP, Embedded Systems, Computer Controlled Networks, Control Circuits
Computer Software
• MS Office, C, C++, µP, µC, VHDL, MATLAB
I have pursued Bachelor of Engineering in Electronics and Tele-Communication. I was the General Secretary of my college for the year 2012-13, I have also won many certificates as an Organizer, which shows that I am a team worker.
I had done my HSC with major subjects as Physics, Chemistry and Maths (PCM). I had also opted for Electronics as a vocational subject, so that I have a ggod knowledge about it before entering into Engineering.
I had completed my studies from Kindergarden (KG) upto tenth (Xth) in this school.