Instrumentation Engineer
Kuwait Drilling Company
Total des années d'expérience :14 years, 8 Mois
NOV MD Totco DAQ system configuration and calibration of the sensors using MD Totco calconf software .
Configuration, calibration & Trouble shooting of NOV Rig sense system .
All the maintenance work & Troubleshooting for MD Totco instruments like Level sensor, mud flow sensor, proximity sensor, block height Encoder and pressure sensor
Maintenance of Instruments in Cameron International Choke manifold system
NOV Electronic Braking system( EDS 3 & EDS 4 ) trouble shooting, Maintenance and calibration of all the sensor within the system
Trouble shooting, maintenance & calibration of MSA H2S & LEL monitoring system & Detcon wireless H2S & LEL detection system
Trouble shooting and maintenance of Hochiki America Corporation Fire alarm system
Trouble shooting and maintenance lock out PLC system of MH wirth Mud pump
Trouble shooting and maintenance of Rig CCTV monitoring system
Trouble shooting and Maintenance of Driller Cameras at Monkey board and Stabbing board and sub base.
Maintenance of GENT Honey well fire alarm system
Installation and maintenance of GAI-tronics Audio messenger paging system
trouble shooting & Maintenance NOV KEMS AUTO DRILLER
Trouble shooting and maintenance of Computers & printers
Trouble shooting of top Drive TDS 11SA and PS2 750A with Electrician
Trouble shooting of SCR & VFD system with Electrician
Trouble shooting Generators with Electrician
Trouble shooting of Mud Pump with Electrician
Coordinating of all operation and maintenance services with Aramco
Preparation of Service orders for Additional Maintenance Services.
Preparation of Weekly work Progress and Preventive maintenance report for whole Operation and Maintenance works.
Other Responsibilities handled (As Maintenance Engineer)
Supervision of SCADA operation and monitoring of PLC based sewage treatment plant (STP).
Supervision Operation, monitoring and distribution of Electric power to Aramco temporary facilities from diesel generators station
Supervision Operation and monitoring of circuit breakers at switchgear
Supervision All electrical and HVAC maintenance at ARAMCO Temporary facilities offices and accommodation
Project Erection, Testing and Commissioning, PLC configuration and maintenance of Instrument H2S monitors at Aramco khuff gas wells at hawaiyah and North Harad
ARAMCO Co ordination & scheduling of inspection, Termination and commissioning, PLC configuration and modification
Develop workplans, co ordinate materials, perform job related documents, resolve conflicts in design & construction related to the installation of H2S sensors
Calibration, Loop Checking and trouble shooting of instruments connected to SCADA and PLC based control system
Responsible for review and evaluation of contractors submittals such as Program of Work Schedule, Shop and Working Drawings, Variation Order and Time Extension Requests, Progress Billings. Also in-charge in preparing project progress/ accomplishment reports.
ARAMCO certified Work permit receiver
Attending job X meetings and Preparing Planning, Scheduling & estimation for the instrumentation Section
Handling all bidding works and also prepare all Technical specification and data for the materials, equipments and instruments
Procurement of materials from inside and outside of kingdom of Saudi Arabia
Prepare ARAMCO identity cards through ARAMCO web site
Handling sub contractors materials sending and billings
Ensure all safety aids are available at the productions
Cable work of all types of cables, Structure works & Airline work, Impulse line work, & Calibration of Field Instruments
Co-ordinate with clients and various department authorities of works,
Carried out calibration activities of process control instruments like Rosemount, Foxboro, and Honeywell etc.
Graduated from one of the best college in India