Construction Manager
Pivot Engineering &General Contracting
Total years of experience :22 years, 3 months
Accomplishments
Construction of NEB Infrastructure Upgrade
Owner :- Abu Dhabi Company for Onshore Oil Operations (ADCO)
Responsibilities
• Provide engineering assistance to make sure compliance with all PERMITS/ HSE/REQULATIONS standard operating procedures.
• Coordinate field work of controls/monitors on-site subcontractors.
• Maintain ongoing familiarization with all procedures, equipment processes
• Assist provides engineering support to distribution facility personnel
• Coordination between civil, MEP and architectural works and progress meeting with site staff to push the project.
Saraya C34 Residential Tower
The project include the construction of residential tower located in prestigious Saraya master-planned development located on Abu Dhabi corniche.The building consists of two basement levels providing 234 parking spaces, aground floor, mezzanine floor, 3 podium, levels, an amenity floor, 32 typical floos and roof floors, the building provides 175 luxury apartment and recreational facilities including a gym, swimming pool and multi purpose rooms.
Responsibilities
• inter-discipline coordination and overall quality control of the work.
• schedule preparation, pre-planning and resource forecasting for engineering and other technical activities relating to the project.
• Develops project objectives by reviewing project proposals and plans; conferring with management.
• Investigating problems and complaints.
• Leading the team to achieve the planned target within schedule and under budget.
Al Silaa Emirati Community Project. Construction of 448 Villas, Project Cost AED 1.3 Billion.
Consultant; Keo International,
Client; Aldar Properties
A new Community in the Al Silaa City, Western Region, consists of Community Centre, Mosques, Children Playgrounds, 448 Residential villas with all related services.
Responsibilities
• Leading the team to achieve the planned target within schedule and under budget.
• Co-ordination between civil, MEP and architectural works to push the project.
Accomplishments
Complex villas in Mohammed Bin Zayed City
Responsibilities
• Establish the logistics plan for the above from the commencement date to the date of handing over guide the technical office to comply with the specs and all the contract requirement
• Implement the construction works according to the quality policy and safety instruction
• Coordinate with the MEP Engineers in order to accommodate all the co ordinations drawings with the relevant civil and arch. requirement
• Prepare the look ahead program, and co-ordinate with the site staff to distribute the manpower according to the main project program within the budget
• Arranging weekly coordination and progress meeting with the site staff and sub-contractors
• Coordinate with subcontractors for the weekly program
Accomplishments
5 Building (tow building G+8 and three building G+6)
Responsibilities
• Daily, weekly & Monthly reports to (CM).
• Ensuring all site activities are flowing smoothly.
• Attending of clients Progress & Technical meetings.
• Dealing with Government Authorities regarding performing and handing over clearances
Accomplishments
9 villas in deferent location in Dubai (Albarsha 1&2, Muhesnah, Nad Alhamar, Altawar, Om suqiem, Al mezhar, Murdif )
Responsibilities
• Responsible for day to day site work
• Follow up with site engineers of subcontractor to ensure that work is being carried out as per design drawings, specifications & meeting planned dates in schedule
• Daily reporting about progress, non-compliance, delay in work to the Project Engineer
• Ensure that Communication regarding any changes in plan have reached the Sub-Contractor’s Representatives
• Conducting regular job site inspections
• Actively monitor the work environment for hazards
• Assist in the quality and safety audit
• Identify and highlight possible risk on project
• Assist in necessary project documentation
• Accurately inventorying the jobsite and ensuring that the supplies are properly maintained
• Support in finalization of Billing Break ups, Bill Certification etc.
• Coordination for verification of extra claims raised by the contractor
Structural Design for villas and buildings untill G+4, And also Site Supervisor
Junior Structural Design with team, and Site Supervisor for social club project.
• Bachelor of Science in Engineering from Islamic University of Omdurman, Faculty of Engineering Dept. of Civil Engineering Sudan in 2001