Welding Inspector / General Inspector
في Petronnic SDN BHD
البلد :
ماليزيا
Representative Petronas Carigali Sdn Bhd
يونيو 2013
إلى يوليو 2013
MOC PIPELINE INSPECTOR (PIPELINE & PRE- COMMISSIONING) CONTRACT
في VELOSI (M) SDN BHD
البلد :
ماليزيا
Representative MURPHY OIL CO LTD. Position : MOC PIPELINE INSPECTOR ▪ 04/07/2013 - 31/07/2013 DP DSV Toisa Paladin Location : Bintulu Sarawak Area, Malaysia Task : Integrated Transportation & Installation of offshore facilities (Contract No: MURPHY / P8281) Pre commissioning and Hydro testing, Tie in Subsea Spool & Riser installation a) 8"-inch dia. SA-PA to S.PLEM (Multiphase Oil Pipeline) *8-inch sub-sea tie in spool @ SA-PA *8-inch sub-sea tie in spool @ S.PLEM b) 10"-inch dia. PR-PA to SA-PA (Multiphase Oil Pipeline) *10-inch sub-sea tie in spool @ PR-PA *10-inch sub-sea tie in spool @ SA-PA c) 16"-inch dia. SA-PA to SE-PA (Dry Gas Pipeline) *16-inch sub-sea tie in spool @ SA-PA *16-inch sub-sea tie in spool @ SE-PA *16-inch Riser @ SE-PA *Riser Guard @ SE-PA *Riser Clamp (1 no. Load bearing Clamp + 3 nos. Sliding Clamp) @ SE-PA d) 16"x 8km Pipeline installation SN-PA to BE-SA (Multiphase Gas Pipeline) *16-inch sub-sea tie in spool @ BE-SA *16-inch sub-sea tie in spool @ SN-PA ▪ 09/06/2013 - 04/07/2013 QP 2000 ( BARGE ) Location : Bintulu Sarawak Area, Malaysia Project : Integrated Transportation & Installation of offshore facilities (Contract No: MURPHY / P8281) NDT PROCESS : AUT Task’s:- a) 8"x 17km Pipeline installation SAPA to S.PLEM (Multiphase Oil Pipeline) b) 10"x 40km Pipeline installation PRPA to SAPA (Multiphase Oil Pipeline) c) 16"x 15.3km Pipeline installation SAPA to SEPA (Dry Gas Pipeline) d) 16"x 8km Pipeline installation SNPA to BESA (Multiphase Gas Pipeline)
مارس 2013
إلى أبريل 2013
GENERAL INSPECTOR (PIPING, MECHANICAL & PIPELINE) CONTRACT
في VELOSI (M) SDN BHD
البلد :
ماليزيا
Representative Carigali Hess Operating Co. Sdn Bhd Position : Acting Snr. General Inspector ▪ 01/03/2013 - 27/04/2013 DLB KUROSHIO 1 ( BARGE ) Location : Block A-18 of Malaysia -Thai Joint Development Area (MTJDA) Task : Develop New Platforms, Namely Bulan-B (BLB) along with the associated pipelines a) 16" Pipeline installation BLA-BLB b) BLB Jacket Installation c) BLB 16" Riser Installation d) CKC-CKD PL Free Span Correction e) Concrete Mattresses installation f) BLA 16" Riser Installation g) As-built Survey by K1 h) BLB Topside Installation i) 16" Pipeline Pre-Commissioning
يوليو 2006
إلى ديسمبر 2012
WELDING INSPECTOR / GENERAL INSPECTOR ( CONTRACT )
في EP ENGINEERING SDN BHD
البلد :
ماليزيا
Representative Petronas Carigali Sdn Bhd
Main Additional Accountabilities and Responsibilities @ PCSB / CHESS :
• Monitor the preparatory works prior to commencement of
work i.e. fill up the pipe tunnel, functional test of the
equipments and etc.
• effectiveness and in compliance to HSE and Quality
requirements.
• Ensure that work is carried out in accordance with the
Contract and specifications
• Monitor movement of the personnel, equipments,
barge/vessel spread.
• Participate in the implementation of HSE plan i.e. pre job
briefing, safety walkabout, hygiene inspection, drill, safety
campaign and etc.
• Implement and follow-up action in accordance with the
PETRONAS and PCSB’S HSE policies, procedures and
requirements.
• Monitor the marine spread activities i.e. anchor handling
operation, personnel/equipments transfer, mooring of
material barges.
• Verify and close out of the punch list of the project scope of
works in compliance to the contract and prior to issuance of
Notice of Provisional Acceptance
• Ensure safety standards and requirements and observed
bring policy matters to attention of superiors.
• Witness the calibration and testing of project equipment and
verify validity of the calibration and testing record.
• Monitor and verify the pre and post-installation surveys of all
structures to be installed by the Contractor is in accordance
with company requirement and specifications.
• Monitor and verify that all new structures position are within
tolerance as specified in Company’s standard.
• Ensure and verify the function ability and operability of the
barge positioning systems as outlined in Contract
requirements and Company’s specifications.
• Monitor, verify and in close liaison with Marine Captains,
Field Engineer, Surveyor, Barge Foreman, Tower operator
and AHT’s Master during anchor handling operations or
during
• Lifting Inspection and monitoring activities to ensure all
condition as good and meet requirement.
• ROV subsea monitoring performing underwater survey on
good condition.
• Monitoring and ensure all divers perform our duty as follow
by PTS and underwater work spec. IMCA
• Monitor and perform inspection Air diving equipment on mob
and before perform diving activities
• Visual inspection and visual checking SAT diver Chamber
before compress diver and SAT BELL for the diving activities
Main Additional Accountabilities and Responsibilities @ PCSB / CHESS :
• Monitor the preparatory works prior to commencement of
work i.e. fill up the pipe tunnel, functional test of the
equipments and etc.
• effectiveness and in compliance to HSE and Quality
requirements.
• Ensure that work is carried out in accordance with the
Contract and specifications
• Monitor movement of the personnel, equipments,
barge/vessel spread.
• Participate in the implementation of HSE plan i.e. pre job
briefing, safety walkabout, hygiene inspection, drill, safety
campaign and etc.
• Implement and follow-up action in accordance with the
PETRONAS and PCSB’S HSE policies, procedures and
requirements.
• Monitor the marine spread activities i.e. anchor handling
operation, personnel/equipments transfer, mooring of
material barges.
• Verify and close out of the punch list of the project scope of
works in compliance to the contract and prior to issuance of
Notice of Provisional Acceptance
• Ensure safety standards and requirements and observed
bring policy matters to attention of superiors.
• Witness the calibration and testing of project equipment and
verify validity of the calibration and testing record.
• Monitor and verify the pre and post-installation surveys of all
structures to be installed by the Contractor is in accordance
with company requirement and specifications.
• Monitor and verify that all new structures position are within
tolerance as specified in Company’s standard.
• Ensure and verify the function ability and operability of the
barge positioning systems as outlined in Contract
requirements and Company’s specifications.
• Monitor, verify and in close liaison with Marine Captains,
Field Engineer, Surveyor, Barge Foreman, Tower operator
and AHT’s Master during anchor handling operations or
during
• Lifting Inspection and monitoring activities to ensure all
condition as good and meet requirement.
• ROV subsea monitoring performing underwater survey on
good condition.
• Monitoring and ensure all divers perform our duty as follow
by PTS and underwater work spec. IMCA
• Monitor and perform inspection Air diving equipment on mob
and before perform diving activities
• Visual inspection and visual checking SAT diver Chamber
before compress diver and SAT BELL for the diving activities
يناير 2005
إلى ديسمبر 2005
WELDING INSPECTOR ( CONTRACT )
في CITO PETROLEUM (M) SDN BHD
البلد :
ماليزيا
Representative Petronas Carigali Sdn Bhd
• January 2005
BAKP-B BARAM SOUTH DEVELOPMENT FABRICATION
Location : SDE Teluk Ramunia, Johor Malaysia
Task : Production Platform BAKP- Jacket & Interconnecting Bridge
• October 2005
BAKP - B BARAM SOUTH DEVELOPMENT
Location : Brook loyard, Kuching Sarawak, Malaysia
Task : Fabrication Of Baram MSF, M2, M3 & Flare Boom
• January 2005
BAKP-B BARAM SOUTH DEVELOPMENT FABRICATION
Location : SDE Teluk Ramunia, Johor Malaysia
Task : Production Platform BAKP- Jacket & Interconnecting Bridge
• October 2005
BAKP - B BARAM SOUTH DEVELOPMENT
Location : Brook loyard, Kuching Sarawak, Malaysia
Task : Fabrication Of Baram MSF, M2, M3 & Flare Boom
أغسطس 2004
إلى نوفمبر 2004
SERVEYOR ( CONTRACT )
في BUREAU VERITAS (M) SDN BHD
البلد :
ماليزيا
SERVEYOR ( CONTRACT )
Project Kuala Lumpur Convention Centre Hall ( Aluminum
Truss ), Fabrication at Preserver Engineering Sdn Bhd Klang
Workshop Selangor.
Project Shin Eversendai Engineering (M) Sdn Bhd ( PQR &
WQT for Project 3x700MW Coal Fired Power Plant, Tanjung Bin
at Rawang Workshop, Selangor.
Project Kuala Lumpur Convention Centre Hall ( Aluminum
Truss ), Fabrication at Preserver Engineering Sdn Bhd Klang
Workshop Selangor.
Project Shin Eversendai Engineering (M) Sdn Bhd ( PQR &
WQT for Project 3x700MW Coal Fired Power Plant, Tanjung Bin
at Rawang Workshop, Selangor.
مارس 2004
إلى أغسطس 2004
WELDING INSPECTOR CONSULTONT ( CONTRACT )
في CPG LABORATORIES PTE LTD
البلد :
سنغافورة
Representative
• Project Changi Airport Terminal 3, Fabrication at Zeleco Engineering Sdn Bhd Rawang Workshop Selangor, Malaysia.
• Project Changi Airport Terminal 3, Fabrication at Zeleco Engineering Sdn Bhd Rawang Workshop Selangor, Malaysia.
أبريل 2003
إلى ديسمبر 2003
WELDING INSPECTOR ( CONTRACT )
في CARIMIN SDN BHD
البلد :
ماليزيا
Representative Petronas Carigali Sdn Bhd
Project DLB KUROSHIO 2 OFFSHORE Installation Pipeline 6” OD, 10”OD and Riser Angsi Pipeline.
Project SEA HORIZON OFFSHORE Transportation Installation and Pipe laying for North Lukut & Penara Drilling Platform and Pipeline Installation.
Project SETIA ABADI OFFSHORE PRE COMMISSIONING 30” OD Expansion Offset Tie-in @ M1DR-A and Pre Commissioning 30”OD x 155.545km E11R-C To M1DRA-A
Project DLB KUROSHIO 2 OFFSHORE Installation Pipeline 6” OD, 10”OD and Riser Angsi Pipeline.
Project SEA HORIZON OFFSHORE Transportation Installation and Pipe laying for North Lukut & Penara Drilling Platform and Pipeline Installation.
Project SETIA ABADI OFFSHORE PRE COMMISSIONING 30” OD Expansion Offset Tie-in @ M1DR-A and Pre Commissioning 30”OD x 155.545km E11R-C To M1DRA-A
سبتمبر 2002
إلى مارس 2003
WELDING INSPECTOR ( CONTRACT )
في VELOSI SDN BHD MIRI SARAWAK
البلد :
ماليزيا
Representative Sarawak Shell Sdn Bhd
Project Well Tie-in Activity at SFJT-B Complex
Project Test Separator Modification at E11 Complex
Project Maintenance activity at F23 Complex
Project Transportation and installation of Offshore Facility for 2004-2003 24”OD Riser, M1DRA and JINTAN-A Pipeline, at Teluk Romania Workshop, Johor Bahru
Project Well Tie-in Activity at SFJT-B Complex
Project Test Separator Modification at E11 Complex
Project Maintenance activity at F23 Complex
Project Transportation and installation of Offshore Facility for 2004-2003 24”OD Riser, M1DRA and JINTAN-A Pipeline, at Teluk Romania Workshop, Johor Bahru
أكتوبر 2001
إلى يوليو 2002
QA / QC INSPECTOR ( CONTRACT )
في MWCT PETRO CHEM (M) SDN BHD
البلد :
ماليزيا
Project Hartasuma Sdn Bhd Gelugor Combined Cycle Conversion at Gelugor Power Station, Pulau Pinang.
يوليو 2001
إلى سبتمبر 2001
QA / QC INSPECTOR ( CONTRACT )
في MPL ENGINEERING SDN BHD
البلد :
ماليزيا
Project Ionic Enersave Sdn Bhd Centralized Utility Facilities piping Kerteh Terengganu at MPL Workshop Shah Alam Selangor.
Project Ionic Enersave Sdn Bhd Manjung 3x750MW Coal Fired Power Station Waste Water Treatment Plant at MPL Workshop Shah Alam Selangor.
Project Ionic Enersave Sdn Bhd Manjung 3x750MW Coal Fired Power Station Waste Water Treatment Plant at MPL Workshop Shah Alam Selangor.
ديسمبر 2000
إلى يونيو 2001
QA / QC INSPECTOR PIPING ( CONTRACT )
في APECO ENGINEERING SDN BHD
البلد :
ماليزيا
Project Protek Engineering Sdn Bhd KHTP Independent Power Utility HRSG Boiler Installation Kulim Kedah.
سبتمبر 2000
إلى نوفمبر 2000
SAFETY OFFICER ( CONTRACT )
في PINEWELL MATRIC SDN BHD
البلد :
ماليزيا
• Project ABB ETSI Sdn Bhd Maintenance activity at Tenaga Nasional Sdn Bhd Kapar Klang, Selangor.
مارس 1999
إلى سبتمبر 1999
QC INSPECTOR PIPING ( CONTRACT )
في EQUATOR ENGINEERING SDN BHD
البلد :
ماليزيا
Project TEC Engineering Sdn Bhd KVCM Kerteh Terengganu.
نوفمبر 1998
إلى مارس 1999
ASST. QC INSPECTOR PIPING ( CONTRACT )
في EQUATOR ENGINEERING SDN BHD
البلد :
ماليزيا
Project MHI Engineering Sdn Bhd Petronas Fertilizer Gurun Kedah
يوليو 1997
إلى مارس 1999
ASST.SUPV.
في UNITED INSPECTION SERVICES SDN BHD
البلد :
ماليزيا
Project Equator Engineering Sdn Bhd Petronas Fertilizer Gurun Kedah.
ديسمبر 1994
إلى ديسمبر 1995
CLERK OFFICER
في Firma Guaman Raja Azhar & Hussin Safri Kemaman Terengganu.
البلد :
ماليزيا
Firma Guaman Raja Azhar & Hussin Safri Kemaman Terengganu.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني