Electrical engineer/Electrical Engineering Coordinator
ThyssenKrupp
Total years of experience :22 years, 8 months
•Key Projects: Imperial Oil/Exxon Mobil - Kearl Oil Sands (phase 1 and phase 2) and Syncrude Canada - Mildred Lake Mine Replacement
•Provide engineering support for electrical and instrument systems, ensuring designed, installed and maintained to safety/performance standards
•Review and revise electrical layout, single line, instrument, piping and vendor drawings, approve field cable tray lay out and cable routing
•Work with subcontractors, assess field change requests, approve daily LEMs and evaluate contract bids and inspection test plans
•Interact with client, provide weekly/monthly project reports
•Supervise testing, inspection and commissioning activities
•Devise engineering site instructions and respond to RFIs
•Collaborate with internal team in preparation of estimates and proposals
•Partner with senior engineer to select electrical equipment, control system and field instruments
•Promote safe work culture, achieved one million man hours without life-threatening injury
•Managed multiple projects, encompassing design and project engineering, ensuring completed within schedules, budgets and to high quality standards
•Devised protection and control engineering packages for power substation
•Prepared SLDs, logic diagrams, AC/DC studies/schematics, wiring diagrams, panel layouts and control building layouts
•Oversaw installation of electrical equipment, ensuring as per project standards
•Work closely with engineers in multiple disciplines as well as vendors and manufacturers
•Prepared RFQs, bill of materials and estimates for project man hours
•Performed engineering studies including technical/economic analysis
•Mentored junior engineers
•Maintained complete project documentation including all the final as-built drawings.
•Reviewed and interpreted design-based memos, scopes, technical documents and construction work packages
•Worked on power transmission network-on 66, 132, 220, 500kV systems
•Devised plans, single line diagrams and elevation drawings as required
•Participated as integral team member in project start-ups, bid reviews and progress meetings
•Maintained complete project documentation including all design packages
•Managed project control including budgets, scheduling, quality and change activity
•Managed suppliers, subcontractors and all design activities, ensuring on time and meeting all quality/safety standards
•Collaborated with site construction teams, ensuring installations executed efficiently, according to designs/specifications and meeting codes
•Participated in project meeting
•Completed in-depth training program and enhanced knowledge base
•Partnered with senior electrical engineers on power system operation, maintenance and construction supervision
•Participated in multi-disciplinary coordination and planning sessions, garnered experience in collaboration and project management
•Acquired understanding of health, safety and environment and quality management programs, ensured all projects adhere to standards
The course covers a wide range of topics including programming, databases, security, project management and computer networking. - See more at: http://www.beds.ac.uk/howtoapply/courses/postgraduate/applied-computing-and-information-technology#sthash.ThyGX8lp.dpuf
http://engineering.must.edu.pk/electrical/introduction.html