Construction Project Manager
SNC Lavalin
Total years of experience :16 years, 0 months
• Managed all project activities, Engineering till commissioning activities.
• Lead team of engineers and site assisting staff
• Managed resources for the activities in the Project
• Ensured all Fabrication activities by contractor within budget
• Coordinated with client and third party to resolve construction issues
• Implemented the Project Quality Plan at site and propxecution of Fabrication er monitoring
• Issued TQ (Technical Query) to Client if required
• Attended coordination meetings with Client & Consultants
• Prepared the method statements for work activities as well as developing specific method statements for every special activity at site
• Conducted daily progress meetings with planning engineer and site personals to tract the daily activities as per work schedule
SATAH AL RAZBOOT(SARB)PKG4 PROCESS 12 NO MODULES ADMA OPCO ZIRKU ISLAND ABU DHABI UAE 10693 METRIC TON
Managed all project activities, Module Fabrication of structural steel, Piping, Equipment installation, assembly of Module, testing, Painting, Fireproofing, insulation and construction activities. Co-ordinate with other project sections to achieve targets. Deal with clients and client representative.
Establish the overall work plan, daily site resource allocation, coordinating site activities, mobilization plan and review them periodically to ensure the project performance.
Optimizing the allocated resources for assigned works to meet budget and minimize deviations in resource requirements and forecasts.
Managing all activities related in this procedure concerning to construction aspects of the project
Managed all project activities, Module Fabrication, Piling Structure, Offshore Rig Skids and structures, Assembly, Rolling of sheets, pipelines, piping fabrication and construction activities.
Lead team of engineers and site assisting staff
Managed resources for the activities in the construction
Coordinated with client and third party to resolve construction issues
Prepared the Project Quality Plan and designing of all the relevant forms to collect the required data as per PQP as well as contract requirement
Implemented the Project Quality Plan at site and proper monitoring
Quality audits to check the effectiveness of quality plan
Conducted Engineering meetings with the technical departments and review the construction drawings.
Issued TQ (Technical Query) to Client if required
Attended coordination meetings with Client & Consultants
Prepared the method statements for work activities as well as developing specific method statements for every special activity at site
Conducted daily progress meetings with planning engineer and site personals to tract the daily activities as per work schedule
Raised NCRs to concerned departments on any non-conformance occurred and reviewing the problem
Managed all maintenance, shutdown, welding and construction activities of piping, pipeline, gas processing plants, tanks
Overviewed Workshop Activities
Managed project QC procedures, instructions, records and documents
Evaluated quality control activities, records and documentation, reporting, quality trends and implement corrective actions
Conducted preparatory meetings for each new element of work prior to starting the new activity on site
Performed all tests in accordance with ACI and ASTM testing procedures and standards
Performed reinforcing steel inspections on material and installations
Managed the “pour card” system to ensure that all rough-in and formwork elements are installed correctly and completely prior to releasing concrete for placement
Managed the quality control testing for all mechanical and plumbing systems (i.e. pressure testing, leak testing, water testing, etc.)
Issued notices of non-compliance for work which fails to meet the specification criteria, and manages the list until all activities are completed
Prepared the punch-list in conjunction with the client and manages the list until all activities are completed
Installed and erected Kausar Phase II, 100 MMSCFD
Kausar condensate handling facility
Installed Hanover compressors at Naimat Basal field
Ahmed to Kausar 6”pipeline project 4.5 KMs
Kausar-Tuba Facility Work
Pipeline Project 4.5 KMs
Installed Wellhead compressors at Kausar & Umer Fields (4NOs)