Murad Abd Allah, MEP Technical & Estimation manager

Murad Abd Allah

MEP Technical & Estimation manager

Trojan General Contracting

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Mechanical Engineering
Experience
22 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 6 Months

MEP Technical & Estimation manager at Trojan General Contracting
  • United Arab Emirates - Abu Dhabi
  • My current job since April 2011

tender evaluation technically, pricing all MEP works, building buisness relations with all suppliers, generating technical drawings and materials proposals for running projects, Budget issuing to project manager, following all procurment activities, following planing and cash flow for projects, leading team of engineers, project managers, draughtmen for all related MEP works

List of Executed projects :
1-5000 Villas in Al Ain City (Design & Build) including Infrastructure.
(VRF system used and Estidama Pearl 2 regulations applied), Water, Sewerage, LV & HV power cables & Substations, Lifting Stations, Pumping Stations, Solar Street Lighting, Solar Water heating
2-Institute of Applied Technology / 2700 Student, 35, 000 Sq. Mtr.
CONSULTANT: Syrconsult - MEP Project Value (375, 000, 000) AED.
(Modular Plant District Cooling Plant 4000 TR, Infrastructure MEP, Several Buildings served by FAHU, FCU &VAV), LPG for Labs, Fire fighting external and internal networks, Pump Rooms, Auditorium, Covered Olympic Swimming Pool, Foot ball Stadium & Basket Ball Covered Hall

3-Hydra Avenue Towers (C4, C5 & C6) residential (B+G+4P+ 29) three towers residential complex./Abu Dhabi - Al Reem Island (Design & Build), Consultant: Prime Engineering, MEP Project Value (135, 000, 000) AED (District Cooling connection, 5200 TR, Fire fighting, Low current, Synthetic Natural Gas, Plumbing, Pump Rooms, FAHU, AHU, Smoke Management system, swimming Pools, Central vacuumed garbage system, Telecommunication, Security systems &Smart Home System
4-Designing & Executing Many Private palaces with air cooled chillers, VRF system, infrastructure MEP, Pump Rooms, Telecommunication & Security systems

5-District Cooling Plant (Design & Build ) At Yas Island-Emirati Housing Villas 488 Villa 7200 TR two plants, complete MEP infrastructure piping networks and power cables LV, Substations, Water pipes and sewerage networks with lifting stations, Solar Street Lighting & Telecommunication

6-Al Ajban Farms (Design & Build ) Full farm Facilities to produce slaughtered chickens, farms eggs, raising Chickens with all related requirements for chickens and infrastructure works to serve each building. Value of the project (150, 000, 000) AED MEP Scope. MEP infrastructure piping networks and power cables LV, Substations, Water pipes and sewerage networks with lifting stations, Solar Street Lighting, Ammonia Chillers for Slaughter House 1200 TR, cold rooms, Compressed air networks, generator rooms & pump rooms

7-Military Projects Several Buildings served by District Cooling Plant, MEP infrastructure piping networks and power cables LV, Substations, Water pipes and sewerage networks with lifting stations, Street Lighting, fire hydrants, pump rooms, generator rooms, building services FCU, FAHU, Chilled Beams, Plumbing and fire fighting services, water treatment plant, frequency convertors, power substation, Telecommunication & Security systems

8-Special Care Housing 24 units+ Management Building (Mental Illness Institution) (Design & Build) served by package units, complete infrastructure MEP Power, Plumbing, Fire Fighting, Telecommunications, Street Lighting, Pump rooms, power substation

9-42 Villa Complex in Reem Island -Complete MEP & infrastructure services high Quality

10-Zero Energy Villa- private investment (totally Solar powered, Water recycling systems)

Technical & Estimation Manager, at Bipower Electromechanical Co./ member of al Habtoor group
  • United Arab Emirates - Abu Dhabi
  • April 2010 to April 2011

Responsibilities & Duties:-

Reporting to General Manager & Projects Manager.
Tender Projects Estimation & Pricing, Offer Letters & Contracts Preparing.
Design & Build of Many Projects with full technical Support (Materials, Drawings, Procurement, Calculations).
Generating Materials Technical Submittals, Drawings, Calculations and Selection for all equipments
Site Co-Ordination with civil and electrical engineers, Work Plans arranging with man power histograms
Daily/Monthly progress, payment reports arranging, following authorities regulations and approvals
Materials procurement as per approved submittals, Budget monitoring against progress at site
Project Budget & out Sourcing preparing & following to match Commercial & Technical Target.


EXECUTED PROJECTS:
1-(UM AL QIWEEN GENERAL HOSPITAL (420 BEDS) (MEP)
CONSULTANT: Hospital Designers & Planners (HDP)
Project Value (415, 000, 000) AED.
Served by Air Cooled Chillers 2600 TR, Pump Rooms, 8 Operation Theater, MRI rooms, FAHU, FCU, Smoke management system, nurse call, security systems, complete infrastructure, water treatment plant, power substation

2-(POLICE IT & LICENSE DEPT.) 42, 000 SQ. METER (MEP)
Consultant: Secure (ministry of interior affairs)
Project Value (125, 000, 000) AED
Served by air cooled chillers 1, 700 TR, complete infrastructure for MEP & data communication interface with other existing buildings, FAHU, FCU, VAV, CRAC Units, security systems, pump rooms, generator rooms, Substation

Senior Mechanical Projects Engineer at Drake & Scull International
  • United Arab Emirates - Dubai
  • September 2007 to March 2010

Responsibilities & Duties:-

Reporting to Project Manager / Projects Director.
EPC project (45, 000, 000) USD value, Movenpick Hotel - Laguna Tower (3B+G+F+42 floors),
EPC project (82, 000, 000) USD value, Ocean Heights Tower. (82 floors)
Several Designs & Engineering for (Sahara Mall-Sharjah, King Abdullah Hospital -Saudia Arabia, Golden Mile - Palm Dubai, Indigo Twin Towers..etc)
Designing and Executing (HVAC, Plumbing, Fire Fighting Systems) According to international standards.
Generating Materials Technical Submittals, Drawings, Calculations and Selection for all equipments
Site Co-Ordination with civil and electrical engineers, Work Plans arranging with man power histograms
Daily/Monthly progress, payment reports arranging, following authorities regulations and approvals
Materials procurement as per approved submittals, Budget monitoring against progress at site

Senior Mechanical Project Engineer at Qatar Electromechanica Group
  • Qatar - Doha
  • August 2005 to August 2007

Responsibilities & Duties:-

 Reporting to Projects Manager
 Re-design, Execute Mechanical Services, tender estimation, budget monitoring, materials submittals,
 Materials procurement, drawings generating, Planning and man power distribution…etc.

(EPC) Executed Projects Summary with inclusive dates:

1-Jun/06 - Jun/07 (Al Mana Towers Complex) consist of twin towers & shopping Mall (2B+G+F+18+R). Total Area ( 180, 000 m2), Consultant: Khatib & Alami

2-Sep/ 06 - Jun/07 (Residential Building) Consist of (2B + G + M + 13 floors + P+R) TotalArea215000m2 Consultant: Al Diwan Engineering
3-Apr/ 06 - Jul/ 07 (La Cigale Hotel - Extension) consist of (B + G + 9 floors) 6 Floors Parking Area & Top Floors Ballroom Hall, Total Area = 95, 000m2 Consultant: Khatib & Alami
4-Aug/05 - Apr/06( Future Pipes Ind. Factory Construction) consist of (Administration, factory Shed, External Services, Stores, Pump Rooms) buildings Total Area115, 000m2 Consultant: Matt Mc-Donalds (UK)
5-Dec/ 2005 - Jun/06 (BTT Qatar Workshop Construction) consist of (Administration, factory Shed, External Services, Stores) Total Area = 65, 000 m2 Consultant: Arab Engineering Office
6-Oct/05 - Mar/06(Doha Taxi -Car Wash) automated car wash Shed, Underground water treatment tanks, Automotives maintenance shops) Total Area = 42, 000 m2 Consultant: Atkins (Sweden).
7-Mar/06-Sep/06 (Marriot Hotel) HVAC system Up-grading.
Consultant : Qatar National Hotels Association.

Mechanical Engineer Site at Anas Anani electromechanical works contracting co.
  • Jordan - Amman
  • November 2001 to August 2005

Responsibilities & Duties:-

Reporting to Project Manager / Projects Director
Re-design, Execute Mechanical Services, Budget Monitoring, materials submittals & procurement
Drawings generating, Coordination, Planning and man power distribution.
Site following up, Commissioning &Testing of (pumps, AC units, Boilers…etc.)


(EPC) Executed Projects Summary with inclusive dates:

1-Sep/04 - Jun/05 (Land Rover Show Room) consist of (2B+G+2 floors) Wide Show rooms for automobiles & offices, Total area 7000 m2, Consultant Arabtech Jardaneh Engineering
2-Nov/04 - Aug/05 (Ibn Al-Haitham Hospital Extension) consist of (2B+G+5 floors) surgery rooms
200 patient rooms, shops in ground floor and Doctors offices, Total area 76, 000 m2
Consultant :Yaghmour engineering Office.
3-Nov/02 - Dec/04 (King Hussein Medical Center Infrastructure & Renovation) consist of several new buildings (boilers, generators, grade 6 fuel, pumps) rooms, full new infrastructure networks (storm water, waste water, oxygen, medical gases, steam), Main kitchens & Laundry renovation and up grading of all equipments and piping.
Consultant: Arabtech Jardaneh Engineering & Military Engineering Division.
4-Nov/01 - Dec/02 (BMW Service Center) consist of (2B + G + 3 floors) offices & repairing areas occupied with compressed air oil removal systems fully automated, Total area 56, 000 m2.
Consultant: Arabtech Jardaneh Engineering

Education

Bachelor's degree, Mechanical Engineering
  • at al mustansryah university/enginnering college
  • September 2001

Specialties & Skills

Project Estimation
MEP Design
MEP Execution
Budgeting
CCS Estimation/Planing/Budget/Cost Control
Mechnical HVAC design
Auto Cad Draughting
Plumbing works Design
Engineering Design,execution, commsioning
Team Leader, Team Player
strategic thinking and solution provider
technical manager

Languages

English
Expert
Arabic
Expert

Memberships

engineers association of Jordan
  • Member
  • April 2001

Training and Certifications

issued by Ingersoll Rand (Certificate)
Date Attended:
August 2004
Valid Until:
August 2004
certified by Jordnian Engineers Association (Certificate)
Date Attended:
May 2001
Valid Until:
May 2001
issued by Satchwell (Certificate)
Date Attended:
April 2006
Valid Until:
May 2006
issued by Candy (Certificate)
Date Attended:
January 2013
Valid Until:
January 2013