Mussadiq Saddiq Butt, Site Supervisor

Mussadiq Saddiq Butt

Site Supervisor

Keir International Company

Location
Saudi Arabia - Riyadh
Education
Diploma, Electrical Engineering
Experience
18 years, 11 months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 11 months

Site Supervisor at Keir International Company
  • Saudi Arabia - Riyadh
  • My current job since May 2016

Major Responsibilities: Site and Team Supervision, site Safety Arrangements & Installation, Trench Excavation, cable pulling.

Successfully Working Experience with KEIR International in different Projects like

Saudi Electricity supply Company 33KV Underground Cable Replacement Project, Saudi Electricity supply Company Riyadh Metro 33KV Project, SEC Unified Contract Project, Sec Emergency Department Project, MOI (MIFONE) Civil / Fiber Duct and Fiber Optic Cable Installation Project.
 
Supervising and responsible for site basic safety arrangements, installations, Trench Excavation with Cable pulling in SEC underground Cable Projects Low Voltage Distribution to Medium Voltage Transmission Feeder Projects up to 33KV as per SEC/Municipality Requirements and standard. also good knowledge and Experience in Optical Fiber Cable (OFC) installation/ Pulling with Manual Manpower and Fiber feeder Blowing Machine,
Handling KEIR International Site Manpower team and Shift as Per Company required Plans/Works Schedule, make and control daily time sheets attendance and report to Project Manager, discuss the site issues with the Management in Weekly Meetings and share my opinions and Experience with Management.
Handling Site Excavation team and Equipments Movements from Store yard to site and site to store yard, supervising after basic site Safety installation Trench required Road asphalt cutting after completion of Trench Excavation section Putting sand in trench and make ready site section for cable Pulling.
Supervising and monitoring of Required Cable Drums, Cable Drum Holder, Pulling Machine, Cable Roller/side roller/ X Roller Transportation from Store to Site and arrange all related cable pulling arrangement before cable pulling and supervise the cable pulling team and works under management of KEIR COM with SEC Consultant, after completion of cable pulling works also pulling the PVC Fiber Pipe With the Cable, after that return all materials and Company Assets to Company store.

General Foreman at JAL International Company LTD
  • Saudi Arabia - Riyadh
  • February 2015 to May 2016

Major Responsibilities:

1. To supervise and manage the site team & subcontractors and equipments, Work schedule meet the master plan and division objective by daily maximum length achievements, and confirm the efficient site progress considering the team and equipments safety.
2. Manage the team and work schedules to efficiently maintain the master plan and Company objectives
or execution activity.
3. Coordination, supervision and monitoring activities, scheduling and team selection, site survey, location
site layout, well site construction, location preparation for completion, Electrical service, well site facility installation, oversee construction activates such as facility and pipeline, electrical, communication repair.
4. Maintain proper record keeping of constructions projects, inspection of work to ensure it fits specification, enforcing adherence to all safety and environmental/ governmental regulations.
5. Support as required the field operation for daily production, excavation, electrical and completion,

Other Responsibilities:

1. Compliance to related QMS policies, procedures and guidelines.
2. Counting, receiving and deliver site materials WH to site, site to WH.
3. Insure company equipments in safe condition and ready to use at any time.
4. To complete the project as per plans and deadline.
5. To identify any clarifications, site problems, support required with the site engineer and proposing the solutions.
6. Confirming and the safety quality work implementation.
7. Assist the site team for best execution practices.
8. Providing all the support required to success project completion.



• Working Under JAL International Company LTD in ECD ( Energy Contracting Division) and Supervising Electrical/Excavation Works in JAL International (Saudi Electricity Supply Company) SEC Unified Project in Riyadh Branch,
• Handling M/V & LV schemes Trenches/Excavation/joint pits works As per SEC standard With JAL Requirement and Successfully Supervised 100 Plus Schemes MV/ LV Excavation and Electricals Jobs Under JAL International Management In Unified Contract Project,
• Working and supervising daily site activity works As per Company plan such like:

Arrangements of Machines and Equipments Transportation from warehouse to scheme site then return to warehouse, site location description to Drivers and Operators.
Site Safety Arrangements before start work, Trench Asphalt Cutting for Excavation as per Scheme with SEC plan sketch, trench Excavation and after Removing Garbage,
Cable lying and after cable lay Backfilling materials arrangements with backfilling and trench concrete making and pouring works supervision.
Scheme required Electrical Materials collecting/issuing from warehouse to site, handling Electrical Team and explain scheme plan to Technicians and supervising electrical team work like Meter box assembly installation, Minipillar installation & cable Termination, Cable jointing Supervision MV/LV & Straight and Branch T Type joint, cable Termination supervision in substation and installation of new Transformers & RMU with LDP Panels, Meter Box installation & cable termination, installation of fuse carrier and bus-bars in substation LDP side & cable termination, Cable Insulation Testing With MAGGER Meter During SEC Shutdown time,
Supervised the Subcontractor Trench, Excavation, Cable laying & PVC Pipe Laying for Optical Fiber Cable and backfilling Works according to the JAL International Company LTD as per Saudi Electricity Supply Company Stander and requirements,

ELECTRICAL FOREMAN at BASMAN Establishment for Treading & contracting Jeddah KSA
  • Saudi Arabia - Jeddah
  • September 2011 to November 2014

Responsibilities & Experience: Site Supervision + Installation + Maintenance + Road Cutting Responsibility before Excavation as per drawing + Supervision Excavation/Cable Laying & Backfilling

Supervised Jeddah Municipality (Street light Project) under Establishment Basman, Successfully Supervised Excavation, cable laying, backfilling, Street Light Distribution Panel Installation, cable terminations in fuse boxes and also worked with consultant during site inspection all related work on deferent below sites

1 District Al-jawed 25km .2 South cornice roads Jeddah 60km
3 Stadium road south Jeddah 5km .4 District AL-Sabinal Jeddah 40km
Also handling and supervision Electrical and Excavation Groups during in project, duty discretion and time sheet controlling jobs,

Working Experienced with BASMAN Establishment at TABUK International AIR PORT in (GACA) General Authority of Civil Aviation KSA Project) as a Electrical Foreman and successfully supervised the Excavation and Electrical Groups works such like, MV Cable Trench Excavation, Cable Lay MV/LT, Optical Fiber Cable Laying, Package Substations Transformers Installations and Cable Termination & Jointing, Old Generators Dismantling and new Diesel Power Generators Installation with Automatic Transfer switch (ATS)
Working Experienced with ADB Airfield Solutions in (TABUK International AIR PORT) under BASMAN Establishment worked on CCR (Current Constant Regulator) Panels Replacement and Airport Runway light Transformers Replacements.
Working experienced Installations of Manual Transfer Switch (380VAC, 4000AMP, 65KA), with Schneider made 4000AMP feeder line bus-bars from Transfer switch to synchronizing panel in AR’AR AIRPORT under BASMAN Establishment in (GACA, General Authority of Civil Aviation) Project
Handle (Saudi Electricity Supply Company Project) responsibilities of tracking Meter/ Trench / Maintenance delays and conducting area inspections
Perform routine checkup to ensure that the Projects work conforms to the environmental and quality standards, Responsible for assisting Project Engineer in the training and development of electrical technicians.

Electrical Technician/Team Leader at Khurram Electronics & Refrigeration
  • Pakistan - Peshawar
  • April 2009 to August 2011

Responsibilities & Experience: Electronic/Electrical & Refrigeration and Air Conditioner Technician and Team Leader.

In during this job experience I was done installation of windows/split type Air conditioner and after installation maintenance service/repairing also working experience of refrigerators maintenance, New UPS Installation and Wiring as per customer requirements, CD/DVD/TV New assembling and repairing,

Experienced and good knowledge about home/offices electricity wiring and UPS System Installation,
Good knowledge about home appliances installation maintenance and repairing such like Water Cooler,
AC, Electric Water Heater, electric heater, cooking range and stoves electric/gas and all related troubleshooting

Electrical Technician at ELC SOLUTIONS CORP
  • Pakistan - Islamabad
  • April 2008 to May 2009

Responsibilities & Experience: Installation and commissioning of diesel powered generator + Automatic Transfer Switch/Manual Transfer Switch

Working Experience with ELC CORP in Installation & Commissioning of Diesel Generators at Nokia Siemens Networks (Telenor Pakistan Ltd) in GSM BTS/HUB Prescribed Sites, Installation Experience of different kind companies Generators such Like Caterpillar CAT, ADAM GEE, Ghaddar, From 13kva to 225kva

Also working experience in Generator Replacements project at Nokia Siemens Networks (Telenor Pakistan Ltd) as a Electrical Technician and successfully replaced install and commission Diesel Generators, ATS Panels And LDP With New Systems and Upgrade the TELENOR Sites Power Systems Under Management of ELC Solutions Corp Good experienced in Installation & commissioning of Automatic Transfer Switch/Manual Transfer Switch (Single, Duel) Panel & Load Distribution Panels with reference of ELC SOLUTIONS CORP and TroubleShooting in all related Electrical works.

Working Experienced in controlling cables and Power cable termination in Generator penal, Automatic Transfer Switch, Loud distribution panel side, Installation of Diesel Fuel Tank with Automatic Refueling Panel and (G.I) Pipe & rubber Pipe and other equipment, automatic fuel level signal switch installation and control cable installation,

Electrical Technician at Shoib Electronics GHAZI
  • Pakistan - Peshawar
  • March 2005 to March 2008

Responsibilities & Experience: Electrical and Electronic installation repairing and maintenance

Worked as a electrical technician and done Assembling of CD/DVD/TV sets and repairing works, installation of windows/split type Air conditioner and after installation maintenance service/repairing also working experience of refrigerators maintenance,

Installation and Repairing UPS System and All Related Works in UPS, Service & Repairing
And also refrigerators maintenance, during works in workshop this period I done Compressor replacement, refrigerant gas charging, gas welding, home appliances installation maintenance and repairing such like Water Cooler, AC, Electric Water Heater, electric heater, cooking range and stoves electric/gas and all related troubleshooting

Education

Diploma, Electrical Engineering
  • at Professional Skill Educational Council (PSEC)
  • June 2011
High school or equivalent, art, Islamic studies .civics
  • at Board of Intermediate & Secondary Education Abbottabad
  • October 2008
High school or equivalent, Islamic studies , general science
  • at GHS GHAZI HARIPUR
  • June 2005

Specialties & Skills

Installation
Electric Power
Electrical Maintenance
Election Law
Comissioning
Microsoft Office
Adobe photo shop
House wiring+ VOLTMETERS+ CLAMP AMMETERS+ MEGGERS+EARTH METER+ INFRA RED HEAT SENSOR METERS
BASIC ELECTRICIAN TOOLS+ CRIMPING TOOL (MANUAL & HYDRAULIC)+SOLDERING IRON/GUNS
BENCH DRILL PRESS/HAND DRILL+ ELECTRIC AND GAS WELDING, HEAT GUN
Driving

Languages

English
Intermediate
Urdu
Expert
Arabic
Intermediate

Training and Certifications

Primary first Responder (Certificate)
Date Attended:
November 2022
Valid Until:
November 2024
OHS General Induction (Certificate)
Date Attended:
June 2023
Valid Until:
November 2025

Hobbies

  • internet browsing