Project QA QC Engineer
Mirage Leisure & Development
Total years of experience :11 years, 8 Months
Arabian Ranches III, Lamborghini Villas DHE,
Client: EMAAR
Valuation: 1.3Billion AED
Responsible for controlling and assuring quality at site.
• Implement a comprehensive quality control plan, outlining quality standards, testing procedures, and inspection schedules.
• Maintain accurate records of all inspections, tests, and quality control activities, ensuring all documents are complete and up to date.
• Identify and document any deficiencies or non-conformities and work with the project team to develop corrective action plans.
• Prepare non-conformance reports and collaborate with contractors and subcontractors to rectify issues.
• Conduct periodic quality audits to assess the project’s overall quality and identify areas for improvement.
• Review and approve materials and equipment submittals to ensure they meet project specifications and quality requirements.
• Evaluate proposed change orders to determine their impact on project quality and advise on acceptance or rejection.
• Provide guidance and training to ensure project personnel, subcontractors, and workers understand and adhere to quality control standards and procedures.
• Suggest and implement initiatives to enhance the quality control process and reduce defects and errors.
• Work closely with project managers, engineers, architects, and stakeholders to address quality-related issues and make informed decisions.
• Conduct regular inspections and tests on materials, workmanship, and construction processes to verify compliance with quality standards.
• Ensure safety measures are in place to protect workers and the public, in compliance with regulations.
• Conduct a final inspection to confirm that all work meets the quality control plan and project requirements. Prepare and organize quality-related documentation for project closeout.
• To ensure all construction activities adhere to codes, regulations, and project specifications by monitoring contractors, subcontractors, and suppliers.
• Coordination with infrastructure team and understanding their requirements with building contractor.
• Coordinating with authorities (RERA & DDA) for arranging progress update and providing required records.
Project: SRTIP (Sharjah Research Technology and Innovation Park)
Client: GOV. Sharjah
Consultant: K&A
Valuation: 263Million +12million ID package
Responsible for managing overall quality of works. Coordinating with consultant & client for inspections. Presenting KPI in progress meeting. Preparing all relevant documents. coordinating with all the subcontractor for submission of engineering works. Preparing handing over documents.
QA QC Engineer. Completed on Highrise tower (3P+45+R) from Foundation to Handover.
Responsible for all architectural and structural works.
Client: EMAAR
Consultant: Atkins
Project Value: 1.2Billion AED(six tower two podiums)
Responsible for all inspections, preparation of MOS, authority coordination, Arranging quality meeting preparing minutes issuing internal NCN & Closing external NCN. coordinating with other contractors such as ID & Landscape.
Controlling quality of work on site according to specification & ISO 9001:2015, BS codes
Coordinating with client representatives
Raising IR(Inspection Request) External.
Making submittals (material, Drawing, Pre-qualification, test rept.)
Submitting ITP to consultant and ensuring that to be approved
Detail study of project specification.
Preparing method of statement of each activity & its implementation.
Taking clearance of Snag list from client.
Generating Snag list.
Taking on site test of concrete for workability
Checking steel reinforcements according to drawing.
Checking all finishing works
Compaction tests (Nuclear densitometer test etc.), soil test reports checking (as per MDD). Concrete crushing test reports.
Execution of work as per drawings and designs.
Checking as built prepared by draftsman for submission.
Preparing company's technical manual for site people
Controlling quality of work on site according to specification & ISO 9001:2008, QCS2010, BS
Coordinating with client representatives
Raising IR(Inspection Request) External
Making submittals (material, Drawing, Prequalification, test rept.)
Submitting ITP to consultant and ensuring that to be approved
Detail study of project specification
Reviewing of method of statement of each activity & its implementation.
Checking and Submitting PCR & As built given from subcont.
Taking clearance of Snag list from client.
Maintaining log for submittals, IRs and other documents.
Taking on site test of concrete for workability
Checking steel reinforcements according to drawing.
Checking all finishing works
Compaction tests (Nuclear densitometer test etc.), soil test reports checking. Concrete crushing test reports.
Working on inspection of High Voltage Cable trench inspection. Witness Scanning of ground for excavation.
Inspection Chamber and Duct Bank inspection.
Taking Approval from Civil team of QP for backfilling etc, All civil works related to Substation and High Voltage and Low voltage cable Laying.
Controlling quality of work on site according to specification & ISO 9001:2008
Maintaining good relationship with the consultant
Raising IR(Inspection Request)
Making submittals
Submitting ITP to consultant and ensuring that to be approved
Detail study of project specification
Detail study of method of statement of each activity & its implementation.
PCRs(pile construction report)
Maintaining log for submittals
Calculating quantity of concrete for order.
Calculating quantity of steel for site as per requirements
Giving requirements of concrete grade for mix design to concrete plant
Taking on site test of concrete for workability
Checking steel reinforcements according to drawing
Test setup of static and dynamic test
Integrity sonic logging anchor stressing calliper logging etc
Preparing PCR submission of IR to consultant taking permission of consultant for work to be started .Checking work quality checking levels of all excavation.Assuring that all yhe work is going according to required specification (QCS 2010).
1)detail checking of work done by sub cotractor.
2)making daily progress report and measurement sheet.
3)submitting bills and taking updates from Lavasa authorities.
4)Making arrangements of work calculating material requierments.
5)calculating rate analysis for item other than Boq.
6)Communicating with client for any query.
completed engineering degree from college of engg. &tech. babulgaon (jn)akola ( M.S) University :