oghenedoro eghwubare, lead project control/planning engineer

oghenedoro eghwubare

lead project control/planning engineer

tombim services limited

Location
Nigeria
Education
Master's degree, Metchanical Engineering
Experience
6 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :6 years, 4 Months

lead project control/planning engineer at tombim services limited
  • Nigeria
  • January 2013 to April 2013

1 Preparation of engineering drawings.
2 Preparation of Shop drawings, Patterns for Profiling.
3 Calculation of Tonnage for Lifting.
4 Preparation of Material take-off for procurement.
5 Preparation of Daily, weekly Report.
6 Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
7 General Supervision.
8 Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
9 Coordinating Scheduling preparation with the proper resource loading. Etc.

Senior Lead Project Control/Planning Engineer at Tombim Services Limited
  • Nigeria
  • December 2012 to January 2013

December, 2012 - January 2013
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer

Inim IA/IP Process Piping Fabrication Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.

Senior Lead Project Control/Planning Engineer at Tombim Services Limited
  • France
  • September 2012 to January 2013

September, 2012-January, 2013
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer

EAP 4th Compressor Installation Project
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.

Senior Lead Project Control/Planning Engineer at Tombim Services Limited
  • France
  • June 2012 to August 2012

June, 2012-August, 2012
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer

Ubit GY Pigging Facilities and Fuel Gas Upgrade-Phase 1 Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.

Project/Planning/Piping Engineer at Chevron Nigeria Ltd
  • France
  • March 2012 to May 2012

March, 2012 - May, 2012.
Chevron Nigeria Ltd.
Tombim Services Limited, Port Harcourt, Rivers.
Project/Planning/Piping Engineer

Fabrication of Both Ubit GB Gas-lift Project, Pipe Concrete Sleepers Support, Ubit GJ (GP) Piping.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.

Project/Planning/Piping Engineer at Chevron Nigeria Ltd
  • France
  • October 2011 to February 2012

Oct, 2011- Feb., 2012.
Chevron Nigeria Ltd.
Tombim Services Limited, Port Harcourt, Rivers.
Project/Planning/Piping Engineer

FABRICATION OF RISER GUARD FOR ESCRAVOS GAS PLANT-PHASE 3B.
A. Fabrication of Meren-1 Production Platform Riser Guard for 16" Gas Riser, Type-1.
B. Fabrication of Meren-1 Production Platform Riser Guard for 8" Gas Riser, Type-2.
C. Fabrication of Meren-2 Production Platform Riser Guard for 16" Gas Riser.
D. Fabrication of Parabe Production Platform Riser Guard for 28" Gas Riser, Type-1
E. Fabrication of Parabe Production Platform Riser Guard for 18" Gas Riser, Type-2
F. Fabrication of Delta Production Platform Riser Guard for 22" Gas Riser.
G. Fabrication of Ewan Production Platform Riser Guard for 16" Gas Riser.
H. Fabrication of Tapa Production Platform Riser Guard for 16" Gas Riser.
I. Fabrication of Malu Production Platform Riser Guard for 18" Gas Riser.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.

Project/Planning/Piping Engineer at homik engineering limited
  • Nigeria
  • August 2010 to September 2011

Aug., 2010-Sept, 2011
Homik Engineering Ltd, Port Harcourt, Rivers State.
Project/Planning/Piping Engineer

A. Fabrication of Escravos Produce Water Disposal (PWD) Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Planning, Scheduling, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ Preparation of Daily, weekly Report.
➢ Preparing Engineering drawings, Shop drawings, Patterns for Profiling, Material take-off, Tonnage Calculation, Total Surface area for Painting.
➢ General Supervision.

Project/Planning/Piping Engineer at Chevron Nigeria Ltd
  • Nigeria
  • June 2010 to July 2011

June, 2009-July 2010.
Chevron Nigeria Ltd.
Homik Engineering Ltd, Port Harcourt, Rivers State.
Project/Planning/Piping Engineer

Fabrication & Installation of Wellhead upgrade for Okoro field Deck Extension (Offshore Installation
A. Fabrication & Installation of Wellhead upgrade for Okoro field Deck Extension (Offshore Installation)
B. MOC 24, Dehydration water outlet line.
C. Fabrication of West fault block platform Boat Landing.
D. Fabrication of Ebok Wellhead template Structure (Pancake Deck extension & Production module Deck extension)
E. Design, Fabrication & Installation of Wellhead upgrade for Okoro field piping hook-up.
F. Ebok FSO Spreader Beam.
➢ Planning, Scheduling, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ Preparation of Daily, weekly Report.
➢ Preparing Engineering drawings, Shop drawings, Patterns for Profiling, Material take-off, Tonnage Calculation, Total Surface area for Painting.
➢ General Supervision.
➢ Site Visitation (Bumi Armada FPSO, Offshore.)
➢ Preparation of Okoro Piping General Arrangement.
➢ Preparation of Okoro Isometric Drawing.
➢ Okoro Piping Stress Analysis Calculations.
➢ Preparation of Okoro WellHead Piping Hook-Up Isometric Drawing (As-built.)

piping/project control/planning engineer at cohis technical limited
  • Nigeria
  • January 2007 to June 2010

1 Preparation of Plot Plan, Piping General Arrangement & Isometric Drawing.
2 Stress Analysis of Piping and Structural Calculations.
3 Preparation of Daily, weekly Report.
4 Preparation of Detailed Pipe Supports & Spring hangers. Planning and Scheduling of Project Scope.
5 Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
6 Preparation of Material take-off.

Project/Planning/Piping Engineer at homik engineering
  • Nigeria
  • July 2008 to May 2009

July 2008 -May, 2009.
Chevron Nigeria Ltd.
Cohis International Technical Services, Warri, Delta State.
Project/Planning/Piping Engineer

Fabrication of Robertkiri and Escravos offshore facilities.
A. Fabrication of Robertkiri Security Tower.
B. Double Jointing and Marking of Robertkiri 16" Piling Pipes with pad eyes and Stabbing guide.
C. Fabrication of Robertkiri Crude Oil Loading Jetties (North Jetty, South Jetty and Central Jetty)
D. Fabrication of Escravos Crude Oil Loading Central Jetty & unloading South Breasting Dolphin and North Breasting Dolphin.
E. Excravos 12" Piling Pipes with Pad eyes and Stabbing guide.
F. Fabrication of 4 Nos 6" risers clamp.
G. Modification of Escravos Crude Oil unloading South and North Breasting Dolphin.
➢ Planning, Organizing and Coordinating Engineering Activities.
➢ Preparing Engineering drawings, Shop drawings, Patterns making for Profiling, Assisting in actualization of Work Breakdown Structure (WBS) & Project Plan/Schedule.
➢ Preparation of Daily, weekly Report.
➢ Preparing Tonnage calculation and Total Surface Area for Painting.
➢ General Supervision.

QA/QC/Planning Engineer at cohis technical limite
  • Nigeria
  • October 2007 to June 2008

Oct., 2007. -June, 2008.
Moni Pulo Nigeria Ltd.
Cohis International Technical Services, Warri, Delta State.
QA/QC/Planning Engineer

A. Meren Wip Revamp Project 1. (Sump Tank Relocation Deck extension)
➢ Preparation of Weld Map, Dimensional Control, Joint fit-up, Daily weld, Weld Summary Report's.
➢ Preparation of NDT Requisition.
➢ Prepare necessary Engineering document such as Quality Assurance and Quality control Procedure, Material traceability report etc.
➢ Compilation of QA/QC As-Built document.
➢ Fit-Up inspection and weld visual inspection of fabricated structural & piping work.
➢ Preparation of material Tonnage Calculation and Surface area for painting.
➢ Preparation of Daily, weekly Report.
➢ General Supervision.
➢ Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones

Project/Planning/Piping Engineer at cohis technical limited
  • Nigeria
  • August 2007 to September 2007

Project/Planning/Piping Engineer

A. Detailed As-built of Elelenwan Manifold.
➢ Preparation of Equipment, Plot Plan, Piping General Arrangement & Isometric Drawing.
➢ Preparation of Detailed Pipe Supports & Spring hangers.
➢ Stress Analysis of piping and Structural Calculations.
➢ Preparation of Material take-off.
➢ Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones

Aug., 2007 -Sept., 2007.
Shell Petroleum Development Company, Nigeria.
Cohis International Technical Services, Warri, Delta State.
Project/Planning/Piping Engineer

Gas Compressor Package and Gas Lift Installation for Abana Field.
➢ Preparation of Plot Plan, Piping General Arrangement & Isometric Drawing.
➢ Stress Analysis of Piping and Structural Calculations.
➢ Preparation of Daily, weekly Report.
➢ Preparation of Detailed Pipe Supports & Spring hangers. Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
➢ Preparation of Material take-off.

Education

Master's degree, Metchanical Engineering
  • at University of Benin
  • July 2014

M.Eng Mechanical engineering

Bachelor's degree, metallurgical and material engineering
  • at federal university of technology, akure
  • July 2006

• B.Eng metallurgical and material engineering FEDERAL UNIVERSITY OF TECHNOLOGY. AKURE In-view

Bachelor's degree, metallurgical and material engineering
  • at Mosogar Sec. Sch
  • July 2006

bachelor of engineering in metallurgical and material engineering

High school or equivalent,
  • at Mosogar Pri. Sch
  • January 1987

Mosogar Pri. Sch., Mosogar 1987, PSLC--------1987

Specialties & Skills

Project Management
Project Control
ENGINEER
FABRICATION
MATERIAL TAKE-OFF
PAINTING
SCHEDULING
SCHEDULING/PLANNING
SHOP DRAWINGS
TAKE-OFF
microsoft project and primavera p6
SAP ERP, CAD ERP
ms project,
PRIMAVERA P6

Languages

English
Beginner
Arabic
Beginner
Albanian
Beginner

Memberships

Nigerian Metallurgical society (MNMS) Reg. No. C943
  • Member
  • January 2012
Nigeria society of Engineers (MNSE)
  • Member
  • January 2012

Training and Certifications

pmp pro (Certificate)
Date Attended:
December 2012
Valid Until:
December 2012