lead project control/planning engineer
tombim services limited
Total des années d'expérience :6 years, 4 Mois
1 Preparation of engineering drawings.
2 Preparation of Shop drawings, Patterns for Profiling.
3 Calculation of Tonnage for Lifting.
4 Preparation of Material take-off for procurement.
5 Preparation of Daily, weekly Report.
6 Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
7 General Supervision.
8 Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
9 Coordinating Scheduling preparation with the proper resource loading. Etc.
December, 2012 - January 2013
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer
Inim IA/IP Process Piping Fabrication Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.
September, 2012-January, 2013
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer
EAP 4th Compressor Installation Project
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.
June, 2012-August, 2012
Mobil Producing Nigeria Unlimited.
Tombim Services Limited, Port Harcourt, Rivers.
Senior Lead Project Control/Planning Engineer
Ubit GY Pigging Facilities and Fuel Gas Upgrade-Phase 1 Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
➢ Coordination of Planning, Reporting, Tracking of Project Progress and Reporting.
➢ Coordinating Scheduling preparation with the proper resource loading. Etc.
March, 2012 - May, 2012.
Chevron Nigeria Ltd.
Tombim Services Limited, Port Harcourt, Rivers.
Project/Planning/Piping Engineer
Fabrication of Both Ubit GB Gas-lift Project, Pipe Concrete Sleepers Support, Ubit GJ (GP) Piping.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
Oct, 2011- Feb., 2012.
Chevron Nigeria Ltd.
Tombim Services Limited, Port Harcourt, Rivers.
Project/Planning/Piping Engineer
FABRICATION OF RISER GUARD FOR ESCRAVOS GAS PLANT-PHASE 3B.
A. Fabrication of Meren-1 Production Platform Riser Guard for 16" Gas Riser, Type-1.
B. Fabrication of Meren-1 Production Platform Riser Guard for 8" Gas Riser, Type-2.
C. Fabrication of Meren-2 Production Platform Riser Guard for 16" Gas Riser.
D. Fabrication of Parabe Production Platform Riser Guard for 28" Gas Riser, Type-1
E. Fabrication of Parabe Production Platform Riser Guard for 18" Gas Riser, Type-2
F. Fabrication of Delta Production Platform Riser Guard for 22" Gas Riser.
G. Fabrication of Ewan Production Platform Riser Guard for 16" Gas Riser.
H. Fabrication of Tapa Production Platform Riser Guard for 16" Gas Riser.
I. Fabrication of Malu Production Platform Riser Guard for 18" Gas Riser.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Preparation of Daily, weekly Report.
➢ Assist in Planning, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ General Supervision.
Aug., 2010-Sept, 2011
Homik Engineering Ltd, Port Harcourt, Rivers State.
Project/Planning/Piping Engineer
A. Fabrication of Escravos Produce Water Disposal (PWD) Project.
➢ Preparation of engineering drawings.
➢ Preparation of Shop drawings, Patterns for Profiling.
➢ Calculation of Tonnage for Lifting.
➢ Preparation of Material take-off for procurement.
➢ Planning, Scheduling, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ Preparation of Daily, weekly Report.
➢ Preparing Engineering drawings, Shop drawings, Patterns for Profiling, Material take-off, Tonnage Calculation, Total Surface area for Painting.
➢ General Supervision.
June, 2009-July 2010.
Chevron Nigeria Ltd.
Homik Engineering Ltd, Port Harcourt, Rivers State.
Project/Planning/Piping Engineer
Fabrication & Installation of Wellhead upgrade for Okoro field Deck Extension (Offshore Installation
A. Fabrication & Installation of Wellhead upgrade for Okoro field Deck Extension (Offshore Installation)
B. MOC 24, Dehydration water outlet line.
C. Fabrication of West fault block platform Boat Landing.
D. Fabrication of Ebok Wellhead template Structure (Pancake Deck extension & Production module Deck extension)
E. Design, Fabrication & Installation of Wellhead upgrade for Okoro field piping hook-up.
F. Ebok FSO Spreader Beam.
➢ Planning, Scheduling, Organizing and Coordinating Engineering Activities, Preparing Work Break-Down Structure (WBS), Work Plan Procedure, Scheduling/Planning using MS-Project, S-Curve for Job tracking.
➢ Preparation of Daily, weekly Report.
➢ Preparing Engineering drawings, Shop drawings, Patterns for Profiling, Material take-off, Tonnage Calculation, Total Surface area for Painting.
➢ General Supervision.
➢ Site Visitation (Bumi Armada FPSO, Offshore.)
➢ Preparation of Okoro Piping General Arrangement.
➢ Preparation of Okoro Isometric Drawing.
➢ Okoro Piping Stress Analysis Calculations.
➢ Preparation of Okoro WellHead Piping Hook-Up Isometric Drawing (As-built.)
1 Preparation of Plot Plan, Piping General Arrangement & Isometric Drawing.
2 Stress Analysis of Piping and Structural Calculations.
3 Preparation of Daily, weekly Report.
4 Preparation of Detailed Pipe Supports & Spring hangers. Planning and Scheduling of Project Scope.
5 Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
6 Preparation of Material take-off.
July 2008 -May, 2009.
Chevron Nigeria Ltd.
Cohis International Technical Services, Warri, Delta State.
Project/Planning/Piping Engineer
Fabrication of Robertkiri and Escravos offshore facilities.
A. Fabrication of Robertkiri Security Tower.
B. Double Jointing and Marking of Robertkiri 16" Piling Pipes with pad eyes and Stabbing guide.
C. Fabrication of Robertkiri Crude Oil Loading Jetties (North Jetty, South Jetty and Central Jetty)
D. Fabrication of Escravos Crude Oil Loading Central Jetty & unloading South Breasting Dolphin and North Breasting Dolphin.
E. Excravos 12" Piling Pipes with Pad eyes and Stabbing guide.
F. Fabrication of 4 Nos 6" risers clamp.
G. Modification of Escravos Crude Oil unloading South and North Breasting Dolphin.
➢ Planning, Organizing and Coordinating Engineering Activities.
➢ Preparing Engineering drawings, Shop drawings, Patterns making for Profiling, Assisting in actualization of Work Breakdown Structure (WBS) & Project Plan/Schedule.
➢ Preparation of Daily, weekly Report.
➢ Preparing Tonnage calculation and Total Surface Area for Painting.
➢ General Supervision.
Oct., 2007. -June, 2008.
Moni Pulo Nigeria Ltd.
Cohis International Technical Services, Warri, Delta State.
QA/QC/Planning Engineer
A. Meren Wip Revamp Project 1. (Sump Tank Relocation Deck extension)
➢ Preparation of Weld Map, Dimensional Control, Joint fit-up, Daily weld, Weld Summary Report's.
➢ Preparation of NDT Requisition.
➢ Prepare necessary Engineering document such as Quality Assurance and Quality control Procedure, Material traceability report etc.
➢ Compilation of QA/QC As-Built document.
➢ Fit-Up inspection and weld visual inspection of fabricated structural & piping work.
➢ Preparation of material Tonnage Calculation and Surface area for painting.
➢ Preparation of Daily, weekly Report.
➢ General Supervision.
➢ Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
Project/Planning/Piping Engineer
A. Detailed As-built of Elelenwan Manifold.
➢ Preparation of Equipment, Plot Plan, Piping General Arrangement & Isometric Drawing.
➢ Preparation of Detailed Pipe Supports & Spring hangers.
➢ Stress Analysis of piping and Structural Calculations.
➢ Preparation of Material take-off.
➢ Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
Aug., 2007 -Sept., 2007.
Shell Petroleum Development Company, Nigeria.
Cohis International Technical Services, Warri, Delta State.
Project/Planning/Piping Engineer
Gas Compressor Package and Gas Lift Installation for Abana Field.
➢ Preparation of Plot Plan, Piping General Arrangement & Isometric Drawing.
➢ Stress Analysis of Piping and Structural Calculations.
➢ Preparation of Daily, weekly Report.
➢ Preparation of Detailed Pipe Supports & Spring hangers. Planning and Scheduling of Project Scope.
➢ Developing work breakdown structure, S-Curve for Project, developing Contract Control Schedules and Milestones
➢ Preparation of Material take-off.
M.Eng Mechanical engineering
• B.Eng metallurgical and material engineering FEDERAL UNIVERSITY OF TECHNOLOGY. AKURE In-view
bachelor of engineering in metallurgical and material engineering
Mosogar Pri. Sch., Mosogar 1987, PSLC--------1987