Total Years of Experience: 19 Years, 8 Months
July 2013
To December 2014
Senior Electrical Engineer
at Dorsch Qatar
Location :
Qatar - Doha
Senior Electrical Engineer for Central zone at infrastructure project Lusail smart City.
Review the, Design detail from Schematic design, Detail design, (IFT) Issue for tender, document for Substation, Utility tunnel, Car park till (IFC) Issue for construction up to material shop drawing approval for Electrical equipment’s Cable laying, 66KV, 11KV Switchgear, substation, street lighting, feeder pillar, storm water pump electrical equipment, Wet utility tunnel, dry tunnels for cabling
Follow up the contractor to complete the work according to the specification and time.
Review the 66KV, 11KV & 415 V for cable layout method statement load calculation.
Construction Consultant to all substation, Car park, and
Review design document and shop drawing for Firefighting alarm system.
Review load calculation for all the 66KV & 11KV 415V cable at design stage.
Review the, Design detail from Schematic design, Detail design, (IFT) Issue for tender, document for Substation, Utility tunnel, Car park till (IFC) Issue for construction up to material shop drawing approval for Electrical equipment’s Cable laying, 66KV, 11KV Switchgear, substation, street lighting, feeder pillar, storm water pump electrical equipment, Wet utility tunnel, dry tunnels for cabling
Follow up the contractor to complete the work according to the specification and time.
Review the 66KV, 11KV & 415 V for cable layout method statement load calculation.
Construction Consultant to all substation, Car park, and
Review design document and shop drawing for Firefighting alarm system.
Review load calculation for all the 66KV & 11KV 415V cable at design stage.
July 2011
To July 2013
Senior commissioning Electrical Engineer
at Saudi Electricity company
Location :
Saudi Arabia - Riyadh
Review in detail the design, and drawing.
Review the scheme drawing, final setting and the configuration in all protection relays.
Follow up the contractor to complete the work according to the specification and time.
Follow up all the activity according to procedure of work and safety.
Follow up all the testing relays according to SEC-stander and testing procedure.
40 Engineer under supervision responsibility as 380 KV GIS high voltage test 4 Engineers, 2 Engineers installation for all Electrical equipment, 3 Engineers for Power cable testing, 16 Engineer for protection panels functional check and relay testing, 10 witness Engineer from our department CSD, 2 Engineers SCADA and 3 Engineers for substation automation system (SAS).
Review the scheme drawing, final setting and the configuration in all protection relays.
Follow up the contractor to complete the work according to the specification and time.
Follow up all the activity according to procedure of work and safety.
Follow up all the testing relays according to SEC-stander and testing procedure.
40 Engineer under supervision responsibility as 380 KV GIS high voltage test 4 Engineers, 2 Engineers installation for all Electrical equipment, 3 Engineers for Power cable testing, 16 Engineer for protection panels functional check and relay testing, 10 witness Engineer from our department CSD, 2 Engineers SCADA and 3 Engineers for substation automation system (SAS).