مدير مشروع
مجموعة المجال العربي
مجموع سنوات الخبرة :35 سنة, 5 أشهر
العمل مدير تنفيذي لمشروع انشاء مستشفى الصحه النفسية في منطقة نجران
العمل مدير مشروع انشاء محطة لتحلية مياه البحر في منطقة جازان
• From May 2011 to present ALMAJAL ALARABY GROUP \ SECTOR CONTRACTOR
Am Started work as a constriction manager for the implementation of the project of establishing Hospital of psychiatric and addiction treatment at Najran area from the date of 17/5/2011 until the date 23/1/2012.
At the date of 23/1/2012 was assigned by the director of project management to work as a project manager for the establishment of a desalination plant at the port of Jizan I'm still on the job until now.
The project consists of construction of the terminal building and the implementation of the foundation for the five water tanks on foundations type of concrete piles
As well as the implementation of the restoration work and the reform of the Intake of sea water
And implementation of the necessary infrastructure networks to operate the plant.
• From 2008 to Apr 2011 Allabina-Architecture & Engineering Consultancy
Outline of Responsibilities
- Review of engineering designs from the documents and drawings attached to each project based on the global standard technical specification and standards adopted Jamahiriya
- Preparation of audit reports for project accordance to the basis of the latest standard specifications
- Follow-up the projects assigned to the Allabina through field visits project sites and evaluate the quality of work progress as planned timetable for the project and commitment to implement the work as the technical specifications by quality control standards
- Continue to research and study of standard specifications and technical activate communication with the rest of the fellows on the different group area consultation and exchange of information and views
مراجعة و تدقيق للتصاميم الانشائية للمشاريع
متابعة و الاشراف على المشاريع الجارية ميدانيا
دراسة و مراجعة المستندات لزوم المشاريع من تقارير شهرية و يومية و اسبوعية و التقارير الفنية و البرامج الزمنية
وضع التقيم الفني للمشاريع وفق المواصفات القياسية العالمية المتبعة
مهندس مقيم لمشاريع الابنية و شبكات البنية التحتية
• September 1995- Oct. 2008 Jordan Telecom Group (orange)
Outline of Responsibilities
- Resident Engineer for the building projects
- Network planning engineer for outside plant network
- Resident Engineer for the project infrastructure outside plant networks
- Coordination of the work of the architect the necessary displacements of existing networks and necessary during the removal of the expansion of roads (Ministry of Public Works, Greater Amman Municipality and the municipalities main)
• General responsibilities
- Resident Engineer for the project buildings and infrastructure networks, communication networks and oversee the implementation according to a technical specifications adopted and approved for a time schedule to the end point we agree for finishing works
-A Leadership of the technical staff and supervisor programming currency, commensurate with the operational activities and implementation priorities for the operation of networks according to the expectations and obligations of management with others
- Work for the planning areas and to provide telephone service due to the age design
- Participation as the accredited representative of the company coordinating meetings with other government services that require the opinion of management, if conducted in the implementation of any projects attach our network
- Participation committees to prepare and evaluate Tenders for projects of the company
- Participation in many training courses in various fields such as computer and communications technology and engineering management and communication
- Participation in a training course for outside plant networks in Germany over the specifications of civil works for the implementation of telephone networks and buildings structure for telephone communications and access to the latest evolution of the industry factories for copper cables, optical fibber glass cable and examination of these plants during a visit to the German at Munich city & also seen a reality of telephone networks and components, visit the factory of a modern pre-cast concrete August 1994 - December 1995
• Salem Engineering Establishment
August 1994 - December 1995
General Responsibilities: -
Implementation manager for the construction of a building overtime for the Department of Lands and Surveys
ادارة الموقع و توفير كامل متطلبات المشروع من مواد و عمالة فنية
اعداد و حساب الكميات و التقارير الشهرية و المستخلصات المالية
الاتصال المباشر مع المالك و المهندس المقيم و تقديم طلبات العمل و الاعتمادات
• February 1994 - August 1994 Sobh Engineering Office - Consulting Engineers
General Responsibilities: -
Site engineer for the project set up factory of tomato plant
مهندس استشاري للاشراف على تنفيذ الاعمال الانشائية و البنية التحتيه
متابعة الانجاز و التقارير اليومية و الاسبوعية و الشهرية
متابعة الاختبارات الفنية و اعتمادات المواد
• COMPANY ALI ALZ03BY FOR CONTRATTOR FOR CONSTRUCTIONS
December 1990 - February 1994
company for contracting of construction roads, buildings and infrastructure worksListeRead phonetically
Dictionary - View detailed dictionary
General responsibilities
- Management a company projects and the preparation of agendas and the accounts of the necessary mateial to identify the required staff according to the budget.
- Preparation of the time schedule for the project and submit it to the owner or the adoption Engineering
- Study and evaluate the tenders for the projects proposed for implementation
- Study of projects and inventory quantities and the preparation of the program and the timeline for the implementation of the project and study the size of technical manpower and machines to be made available to carry out work in line with the workload and duration of contractual
- Study of tenders and analysis price for any contract
- Follow up the implementation of the work and the preparation and prepare reports, daily and weekly and monthly.
- Prepare work orders, and presented to the Advisory Office
- Preparation data and calculations to account for a financial claims outstanding.
- Follow-up laboratory tests.
- Field follow-up to the reality of the progress of work at the sites and coordination with technical teams
- Follow-up testing procedures and technical tests of materials used
Public Security Directorate - the Department of Buildings
متابعة تنفيذ الاعمال المدنية لمشاريع الطرق و الابنية و شبكات البنية التحتية
اعداد البرنامج الزمني و حساب كميات المشاريع
متابعة الاشراف على مشاريع الابنية و الصيانة
المشاركة بدراسة و اعداد البرنامج الزمني للمشاريع
المشاركة في دراسة تطوير المنشائات القائمة و برامج صيانتها
May 1989 - September 1990
Department of Buildings is responsible for a special projects buildings to public security.
The following duties are
- Follow-up to oversee the implementation of the buildings in accordance with the approved technical specifications
- Follow up the progress of work in accordance with the planned time schedule for project
- Part in studies for the development and maintenance of existing buildings.
• Salem Engineering Establishment
Nov1988 - May 1989
The following duties are
-site engineering & estimating quantities for a project of Al Husen school
With all regards
00962779131055
00966544065007
Email:bataynehomar@hotmail.com
obatayneh@yahoo.com
مهندس تنفيذ موقع و حاسب كميات
بكاليوريس في علوم الهندسة المدنية
1982 - 1988, University of Mosul - Iraq B.Sc