Site Engineer
Construction and Reconstruction Company (CRC), Dorra Group
Total years of experience :11 years, 1 Months
- Worked on 6B + G + 6P + 40 Floor tower at the Business Bay
- Managed part B of the project including steel reinforcement, formwork and concrete pouring
- Interacted with sub-contractors including water proofing, post- tensioning, MEP
- Worked on grillage and fishbone models on the SAP
- Designed bridge components including beams, bridge decks, parapets and piers
- Tested bridge structures for wind and seismic loads
- Inspected the form work, reinforcement and casting of Al Baker Tower
- Observed the construction of the core by using mechanical formwork at Al Baker Tower
- Reviewed Shop Drawing and BOQs at the main office
- Assisted in the Quality Control office
- Observed leveling and surveying on site
- Revised steel and concrete supplier contracts
- Observed the dewatering, excavation and piling of the Panasonic Tower
- Read the scheduling and the timeline for the Panasonic Tower
- Observed foundation reinforcement and casting of Al Khour Complex Project
- Monitored due dates and sub contractors contract