5/2012 -Present Ramz AL Hadhara, Iraq- Fast Track Project- Hilla Site
Instrument and control Engineer for 2X 9E Gas Turbine units responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermo cables
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Work on MVIe and toolbox ST as well as to complete cranking, off line water wash and first Firing the units till reach Full Speed No Load (FSNL)
• Work on Cimplicity screens in HMI
Instrument and control Engineer for 2X 9E Gas Turbine units responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermo cables
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Work on MVIe and toolbox ST as well as to complete cranking, off line water wash and first Firing the units till reach Full Speed No Load (FSNL)
• Work on Cimplicity screens in HMI
June 2010
To Present
Instrument and control Engineer
at IFC
Location :
Iraq - Hillah
6/2011 -05/2012 Ramz AL Hadhara, Dura refinery - Baghdad
Instrument and control Engineer for 2X F5 Gas Turbine units responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermocouples
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Commissioning and tested most of BOP instrumentation
Instrument and control Engineer for 2X F5 Gas Turbine units responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermocouples
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Commissioning and tested most of BOP instrumentation
January 2010
To Present
control department
at international free company
Location :
Iraq - Baghdad
work in control dept (liying cables and termination and loop check and calibration instrument and check instrument whith mark6e and make crank and FSNL and connecting whith grad )
October 2010
To June 2011
Instrument and control assistant Engineer
at LM Gas Turbine
Location :
Iraq - Baghdad
10/2010 -06/2011 Ramz AL Hadhara, South Baghdad 2 Power Plant - Iraq-Baghdad
Instrument and control assistant Engineer for 16 units LM Gas Turbine responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermocouples
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Commissioning and tested most of BOP instrumentation
• Insulation Test for most Cables and Motors
• Dry loop and continuity check for all power, I&C cables
• Prepare and documented all required test sheets
Instrument and control assistant Engineer for 16 units LM Gas Turbine responsible on
• Calibrate and verify all pressure switches
• Calibrate and verify all transmitters
• Calibrate and verify all thermocouples
• Calibrate and verify all RTD
• Calibrate and verify all control valves
• Complete applied all activities referring to owner commissioning book
• Commissioning and tested most of BOP instrumentation
• Insulation Test for most Cables and Motors
• Dry loop and continuity check for all power, I&C cables
• Prepare and documented all required test sheets