unit operator
Sharjah Electricity & Water Authority
Total des années d'expérience :17 years, 7 Mois
To operate & control the Gas Boiler & Turbo Generator (4 x 33 mw), (4 x 75 mw) Gas Turbine (2 x 22 mw), (5 x 36 mw), (2 x 123 mw) as per guideline and as per standard operating practices from control room.
Responsible for handling normal plant operations including start up shut down shift management follow up with the field operators for field operation
Responsible for handling emergency plant operations including black out, tripping etc.,
Work coordinate with team members.
Capable of preparing shift reports on plant performance parameters.
Monitoring and recording daily generation report
To operate and control the CFBC Boiler 440 TPH & 1X 135 MW Turbo generator from control room.
Responsible for handling normal plant operations including start up shut down shift management follow up with the field operators for field operation
Responsible for handling emergency plant operations including black out, tripping etc.,
Work coordinate with team members.
Capable of preparing shift reports on plant performance parameters.
Monitoring and recording daily generation report
To operate and control the CFBC Boiler 440 TPH & 1X 135 MW Turbo generator from control room.
To operate and control the CFBC Boiler 85TPH&170TPH, WHRB Boilers& 2X25 MW Turbo generator from Control Room.
WORKING AS A COMMISSIONING ASSISTANT IN RAYALASEEMA THERMAL POWER PROJECT 2*210MW, CUDDAPPAH, ANDHRA PRADESH.
POWER PLANT OPERATION THROUGH DCS.
COMMISSIONING OF ELECTRICAL SYSTEM.
HT< MOTORS, LT TRANSFORMERS, LT PANELS, ELECTROSTATIC PRECIPITATOR, MOTOR OPERATED VALVES.
(under ministry of power Govt. India) from National Power Training Institute,[NPTI] Neyveli
sslc