Excellence PMO
Excellence PMO
Total years of experience :27 years, 0 months
STC Business Sector B2B Excellence Operation Department. “PMO” Highly effective operations Expert. Improvement and development of the strategy, Financially project control data design & modeling - Financially Technical analysis - Finance dispute analyst & Root cause analysis - Digital project control - Developed the change management system, Schedule development - Support management teams by generating progress dashboard reports - Define & Create +15 Team’s task planning and flows achievements measure - Managed budgets, Financial planning, Forecasting, Hiring planning, Improving communication channels, Managing business process improvements - Expert MS Excel & Project Data owner (Director associate)
Professional Freelancer in Consulting Smart Infrastructure Electrical Engineering for Civil building construction.
worked as professional engineer in Building management system & (ELV) Electrical Low Voltage system
manage design - supervisory work progress - lead installation team - suggestions product use in project . control project cost . milestone creation - project schedule development
-. CAD “Product Data Management “(Document - Design - Devices & Component - Configuration)
-. Preparing Master Schedule for Testing & Commissioning.
-. Divide of the team according to tasks and experiences (Designing - Configuration - Testing)
-. Follow Specifications and Standards Design
-. Prepares FAT & SAT test report for SAS
-. Prepares Cost & Time Estimating CBS report use matrix - (Engineer - Materials - Equipment - Software - hardware)
-. Priority Estimating matrix (Urgent - Important)
-. For Project Initiation I use many strategic plans to avoid risk.
-. Suggested Improvement in Test Performance
-. Solve & Supporting problem resolution and decision-making. Use multi technique as Brainstorm - flow chart -
-. Guidance Technical Team in site and help him
-. Tracking Activities Performance and Progress in Site
-. Preparation of Technical Proposals
-. Preparing Material Requirements Planning
-. Create Dashboard report for project situation
-. Create KPI Dashboard for work growth tracking
-. Monitoring and Controlling Expenses and Budgets.
-. Training and Empowers Engineers
-. Preparing Bill of Quantities list
-. Focus on HSE measures And Focus Achieve task with Quality
-. Operation experience for flow project and evaluate performance.
2. SAS
( Configuration - Testing - Fix Bugging - Installation)
PAS ( Gateway & Fullserver )
IEC61850 Settings of IED ABB, Areva, Siemens, SEL, Tapcontrol Controlling by Engineering PC.
Data Set Engineering of Third Party IED’s
Integrating of Third Party IED’s like:
-Areva - P546, P443, P633
-Reinhausen - TAPCON 260
- ABB 670 Series - RED 670, RET-670, REC 670, REF615
Generation of Load Files and SCD
Configuration of SNMP OPC Server.
Communication Switch Configure RJ45 & Fiber Optic
Logic use CFC
To configure network topology and communication between gateways, protection relays, SCADA, HMI’s and PLC.
SAS Version 6 & Version 7
SAS BCU and AVR Functional Description.
SAS Equipment List.
SAS Estimation of AC/DC Load.
SAS IP Addressing Concept.
3. HMI
( Configuration - Testing - Fix Bugging - Installation - Drawing & Designing )
" Alarms - Event - Command - Measurement - AVR Control "
Substation level work ( 380kv - 110kv - 33kv - 13.8kv )
Project work
JEDDAH = Haramin-2 & 3 & 4 Substation.
MAKKAH = Haramin-1 & Eiwaa Substation.
MADINAH = Bani Al-Najar & Haramin-5 & 6 Substation.
RIYADH = KFD & 9027 Substation.
JIZAN = King Abdullah Economic City Substation.
4. Performing SAS FAT & SAT
Factory Accepting Test.
Site Accepting Test.
5. Team Support
Online ( E-mail - WhatsApp - SMS )
Mobail
6. Mode the performance of work
Time = Average 13 hours daily include Saturday.
Relocation every time.
Heavy duty.
Every time success
7. SAS Detailed Design:
Preparation of SAS Panel Layouts
Preparation of SAS Panel AC /DC Schematics
Preparation of SAS Fiber Optic Cable Schedule.
8. SAS Base Design:
Coordinating with the customer for Inputs for the SAS Base Design Preparation
Preparation of SAS Base Design Documents which includes the following documents.
Business Development and implementation
oversee the activities of workers; hire, train and evaluate new employees; and ensure that a company is on track to meet its financial goals. also develop and implement budgets, also ensure workers have the resources to complete their work....
1. Costing, estimating and planning projects.
2. Ensuring best value is obtained for the project including supplier base, use of internal and external resources.
3. Maintaining and completing Project Key Performance Indicators.
4. Writing detailed and summarized project progress reports.
5. Identifying, costing and processing any contract variations.
6. Tracking activities against the detailed project plans.
7. Monitoring actual expenditure figures against project budgets.
8. Organizing and facilitating Project Steering / Operating Committees meetings.
9. Use Microsoft Project for project plan .
SIEMENS 7 years Experience of Energy Automation Substation, including 2+ years of broad-based management in best in Designing CAD and Support. Excel at building high performance teams, project management and implementing best practice methodologies and continuous improvement and cost-effectively utilize technology in alignment with corporate goals. Strategically consistently improve delivery times and service levels while reducing cost. Proven areas of expertise include:
• RTU " Remote Terminal Unit " Test & Commission:-
£ SAT AK 1703
£ SICAM
£ MICROSOUL
• PAS "Power Automation System".
£ IED "Intelligent Electronic Device" (IP) Protocol 61850.
£ Transmission Protocols IEC "International Electrotechnical Commission" 60870-5-101, 104.
£ HMI "Human Machine Interface ".
• System Analysis & Design.
• CRM "Customer Relationship Management ".
• Information for Siemens protection system -Degsi Program.
• PLC "Programmable logic controller ".
electrical technology study
3 years Electrical Power study