Project Controls Specialist for Project located at Australia
Scheduling for Project & Proposal
Project Controls responsibilities
Project Planning & Cost Control for Oil and Gas Projects
for Pet Coke Gasification project of Reliance Jamnagar
Refinery. (Deputed at Site from FLUOR Inc.)
• Project Controls Specialist II for KNPC - Mina Abdulla Refinery (MAB - Package 2) ($3.8
Billion)
Project Handled
Project: Modification of Existing Oil Tanks Project at Operational Oil Terminals
Plant: 5X270 MW Amravati Thermal Power Project, Amravati, Maharashtra.
Key Tasks Handled
* Worked in team of Planning and Project Control of 5X270 MW coal based Thermal Power Plant Project.
* Responsible for the Engineering, Procurement & Construction Planning of different packages of Civil,
Mechanical, Electrical, BTG such as General Civil works, Chimney, Reservoir, Structural works, Water
Page 4 of 5
Treatment plant, Coal Handling, Fuel Oil Handling, Ash Handling, Fire Protection System, Railway Siding,
Switchyard,
Project: EPC of 2X300 MW Thermal Power Plant. (Green Field Project)
Project: Engineering & Construction of 29.8 MW Diesel Generator Power Plant