Ramy El Melegy, Civil engineer

Ramy El Melegy

Civil engineer

Oman Environmental Services Holding Company "BE’AH"

Location
Oman - Muscat
Education
Diploma, Professional Program in Project Management
Experience
13 years, 6 months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 6 months

Civil engineer at Oman Environmental Services Holding Company "BE’AH"
  • Oman - Muscat
  • My current job since April 2015

Business Development Department
As a Civil Engineer I am involved in:
*Developing Protocols for recycling of Construction and Demolition waste (Concrete, blocks, excavation material, marble, Asphalt, etc.) By studying and comparing existing standards for natural aggregates with international available standards for recycled materials to check its suitability for various usages.
* Stakeholder engagement with key recyclers (SME’s and contractors) and Government bodies (Ministry Of Housing, Ministry Of Transportation and Communication, Ministry of Environment and climate affairs, Ministry of commerce and industry, Ministry of regional Municipalities and water resources, Authority of mining and Municipalities).
* Provides technical assistance and expertise during the process of identification, development, management and handover of assigned waste management streams.
*Contributes to the development of operational processes, guidelines etc. for the identified waste management streams, with a focus on setting the technical specifications and standards.
*Supports the operations of the assigned waste management streams by providing technical support and troubleshooting key issues.
* Identifies and highlights any risks for the identified waste management streams, from a technical perspective.
* Provides technical inputs and guidance into tendering and procurement process for identified waste management streams.
*Provides technical specifications and requirements to be included into the tenders related to operations

Senior Civil Engineer at Carillion Alawi
  • Oman - Muscat
  • November 2014 to March 2015

1. Supervising, monitoring and inspecting the following construction aspects of the project such as:
a) Earthworks (Mountain breaking, ground leveling, compaction)
b) Pilling works using DTH method (600 mm dia, up to 15 meters deep)
2. Revising all of BBS and structural drawings prior to get the approval from the consultant.

Senior Civil Engineer at Carillion Alawi LLC
  • Oman - Muscat
  • February 2013 to October 2014

Supervising, monitoring and inspecting the following construction aspects of the project such as:
a) Earthworks ( Excavation, backfilling, compaction and anti-termite application for formation
soil)
b) Formwork fo rafts, slabs, columns, stairs, walls and retaining wall ( PERI & ALUMA
systems)
c) Reinforcement works for Rafts, slabs, columns, stairs, walls and retaining wall.
d) Concrete pouring for Rafts, slabs, columns, stairs, walls and retaining wall and blinding
concrete.
e) Post Tension slabs.
f) Water isulation ( cold applied bitumen, polyethelene membrane sheets ).
g) Shotcreting for the shoring piles to gain a leveled side surface .
h) Block works.
i) Finishing works.
j) Repairing works .
k) Temporary works according to the approved design.

Civil Site Engineer at Al Futtaim-Carillion "AFC" {Cairo Festival City}
  • Egypt - Cairo
  • October 2010 to January 2013

Al Futtaim-Carillion "AFC" \{Cairo Festival City project\}
.. Infra-Structure Phase (Oct. 2010 - Jan. 2013)
-Working as a Civil Site Engineer from project commencement to completion

Supervising, monitoring and inspecting the following construction aspects of the project such as:
a) Main Infra-Structure and its future connections
 Sewer Network (Glass Reinforced Plastic “GRP” pipes up to 600mm dia & Concrete Manholes up to 1500mm dia gravity network including the gullies)
 Force Main (High Density Poly Ethylene “HDPE” pipe sewer pressured line to link the Sewage Pump Station of the city to the main government Waste Water Treatment Station)
 Irrigation Network ( “HDPE” pipes pressured network, including fire hydrant work & Valve Chambers)
 Potable Water Supply Network ( “HDPE” pipes pressured network & Valve Chambers)
 District Cooling (Chilled Water) Network (Pre-Insulated pipes pressured network & Valve Chambers)
 Medium Voltage Network (Armored Aluminum XLPE Cables)
 Street Lighting Low Voltage Network (Armored Aluminum PE Cables & Street Light Bases)
 Fiber Optic Network (LS Micro Ducts “Air Blowing System Cables”)
 High Pressure Natural Gas Network (Poly-Ethylene pressured network)
 Low Pressure Natural Gas Network (Poly-Ethylene pressured network)
b) Landscape preparation (Housing points that link the main irrigation pipe to the sub irrigation network of landscape )
c) Earthworks (Bulk Cut and Fill, Soil & Sand Compaction, Soil & Sand Replacement)
d) Roads Construction (Sub-grade preparation, Road base, Asphalt work, Kerbing, Service roads, Paved walkways)
e) Temporary works for supporting the existing services.
f) Redesign for clashes between existing & proposed utilities.
g) Execution of snagging works.

Education

Diploma, Professional Program in Project Management
  • at American University
  • July 2012

• Project Planning & Control Techniques • Management of Project Resources • Project Budgeting & Financial Control • Risk Management • Project Management International Standards (PMP prep. certified from AACE) • Cost Management (CCE Prep. certified from AACE)

Bachelor's degree, Engineering
  • at Faculty of Engineering - Alexandria University
  • June 2010

-Overall cumulative grade: Good { 69.75% }. -Graduation Project: Steel structure. { My project was a circular mall in Vector Amanuiel's square in Alexandria with four pedestrian bridges to serve the four square branches, with a circular elevator core in the middle to lift people 18 m up to a cirular restaurant} -Graduation project grade:Excellent {Win the prize of best project in Structur e department }.

High school or equivalent, high school
  • at Zahran Language School
  • June 2005

Specialties & Skills

Civil Engineering
Concrete
Project Management
road works
Infrastructure Projects

Languages

Arabic
Expert
English
Expert

Training and Certifications

Responsible for the construction of 8 villas including form work, reinforcement, pouring . (Training)
Training Institute:
El farid for construction in { Alex West Compound }
Date Attended:
July 2008
Responsible for the construction of 11 villas including form work, reinforcement, pouring . (Training)
Training Institute:
El farid for construction { Alex West Compound }
Date Attended:
June 2009
Concrete & Finishing Works in Armed Forces Hotel (Training)
Training Institute:
Alexandria Construction Company”Talaat Mostafa”
Date Attended:
July 2007

Hobbies

  • Sports , fishing , reading scientific books , hiking