PROJECT ENGINEER
TAREG AL JAFFARI CONT EST
Total years of experience :7 years, 6 months
WORKING ON NEW AL OULA
CONSTRUCTION OF 115/13.8kv SUBSTATION (NG-SA)
WORKING ON NEW AL-MUHAMMADIYAH
CONSTRUCTION OF 115/13.8kv SUBSTATION (NG-SA)
JOB RESPONSIBILITIES :
Familiar with SEC Engineering, Material and Construction Standards.
Study of specifications, tender drawings, bill of quantity for electrical distribution systems.
Prepare RFQs, P. Os, Submittals, Transmittals, Technical Proposals for bidding of turnkey projects.
Preparation of project design submittal of ongoing Project.
Arrange the Co-ordination meeting between Clients and Vendors.
Installation, Testing activities at site
Project Close out works until project completion
Coordinates closely with Site electrical engineer to ensure that permanent works are properly coordinated with other disciplines
Witnesses quality control inspections to ensure that the permanent works are constructed according to the contract, applicable codes, standards, approved drawings and specifications.
Witnesses all testing, pre-commissioning, commissioning, and start-up activities to assure compliance with the approved plans and procedures.
Reviews submitted shop and as-built drawings, materials submittals, tie-in procedures, project schedules, and work permits; and coordinates with the concerned departments for obtaining the client approval and/or their comments.
Organizes, coordinates, and conducts in conjunction with the concerned departments acceptance inspections and re-inspections of the completed permanent works, until all deficiencies are corrected and signed off.
Reviews invoices for correctness of installed quantities for the electrical portion of the permanent works.
Attends a bi-weekly meeting between the Client’s Construction team.
Projects :
1. Installation of Anode Beds for Cathodic Protection of Sea Water Injection Pumps in Saudi Aramco.
2. Installation OF Rectifiers for cathodic Protection of Sea Water Injection Pumps in Saudi Aramco.
3. Project of Installation of Line Protection in Berri Power Plant 380/230 KV, Khursaniyah Power Plant 230/115 KV, South Hofuf Substation 230KV(Outage) & Rawadh 1 Substation 115KV(Outage) of Saudi Electricity Company.
4. Working as Work permit Receiver for Integrity test Preparation In Fakhariyah 115KV,
5. Installation of DVM Panel In Khursaniyah 230KV Power Plant and Waist Gas Plant 380 KV of Saudi Electricity Company.
6. Working As a SITE Engineer in Al-Fakhariyah Substation 115KV (SEC).
7. Working As a Site Engineer in Attakhassusy Substation 115KV (SEC).
8.Working As a Site Engineer in D.I.E 6A Substation 115KV (SEC).
9.Catch Basin of oil pits & Firewall works of Transformer in Khursaniyah Substation Of Saudi Electricity Company.
10. Handling the QA/QC Activities for 33KV Overhead Line Transmission Constuctions for New Mequoa Substation.
Job Responsibilities:
• Site Engineer for HV substations, new & reinforcement for substation.
• Responsible for Installation of Transformers, Protection Panels, AC & DC Panels, Surge Arresters, S/S Grounding, RMUs, CommunicationPanels & all other equipment related to Sub Stations.
• Responsible for insulation resistance testing, Megger testing, Secondary and Primary injection for C.Ts and VTs, Contact Resistance Testing, Pre-commissioning of SCADA, SOE and Annunciation Panels.
• Familiar with SEC Engineering, Material and Construction Standards.
• Responsible for installations of anode beds, rectifiers, and pits preparations.
• Study of specifications, tender drawings, bill of quantity for electrical distribution systems.
• Prepare RFQs, P.Os, Submittals, Transmittals, Technical Proposals for bidding of
turnkey projects.
• Preparation for Base design submittal of ongoing Project.
• Capable to deal with material and drawings submittals as per SEC specification.
• Coordination with Client, Consultant & Subcontractors.
• Responsible for Work Permit Activities with Saudi Electricity Company (SEC).
• Responsible for Bidding and Cost Estimation activities of severalprojects.
• To clear all Civil, Electrical and Mechanical Punch list items prior to handover to SEC
• Responsible of Final Testing & commissioning of HVAC, Fire Fightning & Integrity Test.
• Responsible of all Civil Work, HVAC work & fire Fightning Work.
• Responsible of Installation of Capacitor Bank in the Substation.
• Responsible of Power Transformer Ouatge For LCLM Pole.
• Responsible for Catch Basin Of Power Transformers (T701, T702) & firewall B/w them in Berri S/S BSP, Khursaniyah S/S & Safaniyah S/S BSP
Job Responsibilities:
For understanding & maintenance the Generating Operation there.
Installation of Different Instruments like sensors and switches and valves
Supervised Lighting and Earthing of the whole project
Supervision of electrical works along with senior team members
Understood the basic layout for executing a project and how to work in a team being a team member
Interaction of Clients and Contractors with agreed principles
Installation of M.V Panels, L.V Panels and Transformers
Installation of Pumps, Motors and Distribution boards
Cable tray installation
Installation of different Power and Control Cables
Cable Laying, Dressing, Maggering and Termination
Understood the Earthing and Lighting layout diagrams of whole plan
Maintenance of AC/DC Motors Construction & their Control Circuits.
Installation of Sensors, Switches, Circuit Breakers, Relay’s &
other Electrical Control Circuits used in Industry.
Working on Electrical Cables & Power Cable Specification used In Industry.
Installation of Cable Trays
Working at PLC Panels, circuits, programming and also troubleshooting
the faulty circuits.
Working Of Various Logic Control Circuits in Mitsubishi Trainer Software.
CGPA