Work Experience

Total years of experience :8 years, 7 Months

Lead Project Engineer at YOKOGAWA
  • United Arab Emirates - Dubai
  • March 2013 to September 2014

• IO assignment in DCS controllers, Loop Drawing using Engineering tool such as PRIM TOOL.
• I have experience for I/O allocation, Configuration of Control Systems (Database, Serial Interface between DCS & PLC, Graphic, Control Loops, Cause and Effects, Logic Diagrams, Reports and History)
• Developing the System Architecture Drawing, Panel G. A. Drawings, Console Drawings and Wiring drawings
• Exposure to the following documents, Instrument Index, I/O List, PFD, P& IDs, Cause & Effect Diagrams, Logic Diagrams, Loop Diagrams, JB Wiring, Cable Block Diagrams etc.
• Conversant with relevant international/local engineering codes and standard
• Proactively recommends potential quality and efficiency improvements within the engineering group
• Shares technical knowledge with project team, supervisor, own discipline and other disciplines
• Reports progress and technical problems to project and engineering managers.
• Preparation of Project document during FEED stage.
• Deploys standard processes, tools and methodologies in project delivery
• I have Sound knowledge of Control Systems and Detailed engineering deliverables.
• Ensures that the engineered solution meets project requirements, across all disciplines, in terms of functionality, process control standard designs & design rules, quality, and supports documentation and implementation process at minimum cost by optimizing use of global productivity tools and other Standard Builds deliverables.
• Proactively recommends potential quality and efficiency improvements and shares technical knowledge back to Discipline Communities and the project team.

project Engineer at WIPRO Technologies
  • Oman - Muscat
  • August 2012 to February 2013

• My scope of work is do detail design study for new CCR(central control room) and their related softer ware updating.
• And provide solution to their present issue. Which right know they are facing
in automation side.
• They have different DSC platform at different station. I am in a face of combining them into one platform.
• Preparation of As-Is current status report and making It -as per required proposal.
• Updating the present DCS System Architecture.
• Providing the solution related to for interconnecting the PCS domain with Business domain.
• Going for Alarm Management System (AMS) and there rationalization execution procedure.
• Ensures that the engineering solution meets project requirements, across all disciplines, in terms of functionality, PCS standard designs & design rules, quality, and supports documentation and implementation process at minimum cost by optimizing use of global productivity tools and other Standard Builds deliverables.
• Providing the solution related for interconnecting the PCS domain with Business domain.
• Technical interface with customers, to ensure that the project requirements are fully defined, and delivered within schedule and cost constraints.
• Reports progress and technical problems and/or changes to project manager.
• Involved in the pre-engineering phase of a project.

INSTRUMENT SYSTEM ENGINEER at hyundai engineering & construction
  • Saudi Arabia - Dammam
  • May 2010 to May 2012

 Presently working as instrument system engineer in HYUNDAI organization in SAUDI ABABIA for SAUDI ARAMCO KARAN GAS PLANT.
• MY scope of work is preparation of I/O data base, participated in FAT for DCS systems & IFAT for DCS with ESD systems, with VMS systems.
• Conducted SAT for DCS, ESD VMS systems with vendor and client( ARAMCO)
• Reviewing the instrument location in field using Smart Plant P&ID softer. And installing the instrument as per ARAMCO standard. Red line the HOOK-UP drawing to make it As Built Drawing
• Preparation of LOOP FOLDER using HPCM database softer. Red line the LOOP FOLDER and conducting the LOOP TEST and solving the punch related to folder.
• As per control narrative design, preparing the operation & control logic and providing the supporting documents to the DCS (YOKOGAWA) vendor. And support the vendor during the Graphic & Logic design stage.
• Configuration of FF (Foundation Field Bus) device on FCS through HIS SYSTEM by auto configuration mode.
• Reviewing the Shut down CAUSE & EFFECT matrix with the ESD Programming Logic is design with BY-PASS application (TRICONEX).
• Calibration of field instrument like LIT, FIT PIT, TIT, Valves MOV’s Shutdown valves,
Control valves, Actuators, (FISHER) and Loop check for all field related instruments.
• Conducting loop check procedure for the completed system for HART and FF devises using (EMERSON 475) communicator.
• Performing Control Valves and ESD valves operation and stroke check by PRM SOFTER.
• Support during commission the system & equipments at site with client and vendor.

Support Engineer at Info systems Software And Consulting (ISAC) as
  • India - Hyderabad
  • August 2009 to April 2010

 I WORKED in Info systems Software And Consulting (ISAC) as SYSTEM ENGINEER
 Design, develop, realize and test components, modules and subsystems within the limits of system specifications.
 Apply standard engineering techniques, procedures and criteria to make adaptations and modifications in order to solve technical problems.
 Review instrument Schedule, including updating, Interlock (safety and shutdown) logic schematic diagrams.
 Review panel drawings and schematics (both local and central), cabinets, rack layouts, including instrument allocations, Terminal Layout drawings, Console Wiring Diagrams, System Highway Block diagram
 Review graphic Layout Drawings, Report formats, Programmable Logic Controller (PLC) programming, and flow diagram specifications.
 Involved in design at system level platform was INVENSYS for THERMAL PLANT
Preparation of data base as per given I/O list and LOGIC design with graphic details.
 Graphic design with respected given P&ID from client. Preparation of instrument TAG list, Specification list Configuration list and Merging in the softer data base.
 On Site testing the system softer ware with client and preparation of SAT documentation.
 Trouble shooting on coming field related quires.

INSTRUMENTATION ENGINEER at AZIZ COMPANY RIYADH
  • Other
  • January 2007 to July 2009

 I WORKED as INSTRUMENTATION ENGINEER in AZIZ COMPANY for commissioning & start-up of WATER TREATMENT PLANT for SAUDI ELECTICITY & WATER AUTHORITY at ALKHARJ ROAD.
 My status of work was to make P& I AS-Built Drawing, Automation Drawing, MCC Drawing for the plant And to design MCC &AUTOMATION PANELS
 Involved in developing of INSTRUMENT LOOP DIAGRAM(ILD’S) & CABLE
SCHEDULE & FUNCTIONAL LOGIC DIAGRAM (FLD)
 I have designed MCC & Automation panel for HIGH PRESSURE PUMPS (R.O UNITS) &CATRIDGE PUMPS, SLUDGE TREATMENT PUMPS, COOLING TOWER PUMPS for WATER TREATMENT PLANT at AL-KHRAJ ROAD.
 Worked on installation, terminal wiring, testing the control loop signal, and designed the programming logic for SIEMENS PLC S7-300 & S7-400 using the software SIMATIC MANAGER
 I have designed SCADA SCREEN for WATER TREATMENT PLANT using the PLATFORM INTOUCH WONDERWARE 11.1 version
 Programming of MERLIN GERIN SOFT STRATER ATS48& DRIVES(VFD) AVT 28
 MY present status of work is involved in installing, testing and commissioning of field instrument such as PH analyzers ORP analyzers, CONDUCTIVITY analyzers, SDI analyzers LEVEL analyzers, ELECTROMAGNATIC FLOWMETERS, and to troubleshoot the related problem
 Calibration of ELECTRO-PNEUMATIC ACTUATORS (KSB) in field. To check the operation of DOSING PUMPS (ALLDOS)

 Worked on installation, terminal wiring, testing the control loop signal, and apart of programming MODICON PLC PREMIUM
 MY status of work was involved in installing, testing and commissioning of field instruments (ENDRESS+HAUSER) such as ULTRASONIC LEVEL(LIT) & FLOW (FIT), PRESSUER (PIT) TRANSMETER & ANALYTICAL ANALYZERS such as DISSOLVE OXYGEN & CHLORINE SAMPLE ANALYZER, TURBIDITY ANALYZER, PH, CONDUCTIVITY ANALYZER, ELECTROMAGNATIC FLOW METERS (KRONIA) AS PER HOOK-UP DRAWING

Jr testing engineer at ECIL COMPANY
  • India - Hyderabad
  • January 2006 to April 2007

 Worked as a Testing & Program Developer Engineer in SCADA Div., ECIL, Hyderabad, on AUTOMATION OF OIL PIPELINE for ONGC INDIA.
Platform: GE-FANUC 90-60 series, CIMPLICITY SOFTWARE
 My scope of work was to develop PLC program for PETROCHEMICAL PIPELINE in GUJARAT, and preparation of I/O list as per the requirement, Designing the Automation Drawing and Automation Panel.
 I participated in Installation & Commissioning of Koyali and Navagam stations in KVSSPL project.
 I worked on Allen Bradley ControlLogix Platform. 1756-L55, 1756-CNBR/D, PROSOFT Modbus and DNP communication modules are used in my interface unit development.
 I am having exposure on communication protocols like Modbus, SRTP and DNP.
 I am having knowledge on SCADA operation.

Education

Bachelor's degree, B.E instrument engineer
  • at osmania university
  • November 2006

Specialties & Skills

Instrumentation
Installation
Commissioning
Testing