Power Generation and Utilities Operator and Acting as a Power Shift Supervisor upon Request
Abu Dhabi Gas liquefaction Company (ADGAS)
Total years of experience :45 years, 6 months
• As a Power Generation and Utilities Operator Covering Das Island Power Station all operation activities and follow up all maintenance and other activities in the Plant.
• As Acting as a Power Shift Supervisor Covering the Power and Steam generation Panels in LNG Production Plant Centralized with HONEYWELL DCS TDC 3000 Main Control Room complex.
• Maintaining Smooth and Reliable Plant operation in Normal Conditions as well as supervises and Follows up all Defective and Scheduled Maintenance and Permits to work activities during my Duty period.
• Checking, operating, monitoring and observing all activities/situations on plant Equipment within the defined areas of duty.
• Logging and Recording all Running plant Parameters and Reporting back giving detailed information of any abnormalities and Defects.
• Caring out operational preparations on Equipment prior to Release for Maintenance and ensures proper implementation of permit to work system.
• Maintaining a High standard of HSE and observing acceptable levels of Risk perception.
• Providing on job training and coaching for all U.A.E Developees in My assigned areas.
• Participated in annual overhaul Team to Shutdown the Plant, leading area operators through Plant Radio and other Communication means to Isolate the Equipments and prepare the site to Release it for major overhauling activities and Re-commission after jobs Completion
Specialized in Heavy Duty Gas Turbine & Thermal power Generation Plants For:-
• Maintenance works (Preventive, Corrective and troubleshooting).
• New Installation as part of Capital project and upgrading schemes.
• Preparation of Pre-Commissioning Stage and Producing the Required
Reports and Documents covering of performance test of the Equipment, Loop Checking and Verification of the Required Specification.
• Preparation of the detailed commissioning procedure to assure Smooth and Safe Commissioning phase of the New installed Equipment.
• Recording and analyzing the abnormality events during the Commissioning phase and Recommend the Corrective action.
• Participated in Troubleshooting, Implement Upgrading & modification of the pneumatic, Electrical, Electronic and Local control panels.
Responsible for Electrical Power & Control and Field Instrumentation maintenance and Troubleshooting of Gas Turbine Power Generators
I was in depth involvement in the New Installation and Commissioning of the all Electrical and Control Systems for KHALDA Petroleum Company OIL&GAS Production Plants, Then I have been Hired by Khalda it Self.
Installation and Commissioning of Cairo under Ground Metro Project Involved with HV Power System Transformers, Electrical AC to DC Rectifying Stations, Emergency power generation, Fire protection, Lighting and Air Conditioning & Ventilation Systems.
Involvement in the Erection and Maintenance of Power Station & Factory Units.