Robert Di Lena, Architectural Healthcare Planner

Robert Di Lena

Architectural Healthcare Planner

ICME/SCME

Location
United States - Florida - Tampa
Education
Diploma, Architecture Drafting
Experience
30 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 0 Months

Architectural Healthcare Planner at ICME/SCME
  • United Arab Emirates - Abu Dhabi
  • June 2011 to April 2016

My responsibility as Project Manager:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Senior Medical Equipment Planner at Faust-Obermeyer
  • United Arab Emirates - Abu Dhabi
  • November 2010 to June 2011

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Project Manager/Architect at BakerBarrios
  • Other
  • November 2006 to April 2009

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coordinator at HuntonBrady
  • Other
  • February 2005 to November 2006

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Architectural Designer at Beebe Design Studio
  • Other
  • February 2004 to February 2005

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coord./Designer at SMRT
  • Other
  • July 2002 to February 2004

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Project Mgr./Sr.Proj. Coord./Arch. Designer at TRO Jung/Brannen
  • Other
  • November 1984 to June 2002

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.
My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.
My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Education

Diploma, Architecture Drafting
  • at Architectural Draftsman
  • June 1981

Specialties & Skills

Construction Management
Life Safety
Durable Medical Equipment
Project Management
Healthcare
Healthcare Design and Planning
Presentation Freehand Drawings
Architectural Models

Languages

English
Expert

Memberships

AIA
  • Member
  • April 2010

Training and Certifications

Architectural and Industrial Drafting (Certificate)
Date Attended:
June 1981
Valid Until:
January 9999
ARE Architectural Registration Exam (Training)
Training Institute:
Colorado Department of Regulatory Agencies; DORA
Date Attended:
November 2010
Duration:
47392 hours

Hobbies

  • Architectural Models
    Architectional Presentation: Project: Model for a Full Gospel Assembly of God Church
  • Models
    Automobile
  • Architectural Models
    City of Rome