Total Years of Experience: 43 Years, 9 Months
March 2020
To Present
Construction Projects Manager
at GRAIA Construction Corporation
Location :
Philippines - Imus
Address: Imus, Cavite, Philippines.
Projects: Handle the seven (7) flood control projects for Dept. of Public Works & Highways
(DPWH) and Land Transportation Office (LTO) building.
Projects: Handle the seven (7) flood control projects for Dept. of Public Works & Highways
(DPWH) and Land Transportation Office (LTO) building.
August 2017
To March 2020
Business Partner/ General Manager
at Rolly Custodio Transport Co
Location :
Philippines
Projects: Operate Grab A Car or TNVS
April 2015
To July 2017
Project Civil Structural Engineer
at Jacobs Engineering Group JV Zate Consulting Engineers
Location :
Saudi Arabia - Turaif
Project Two (2) Title: Ma’aden Umm Mual Phosphate Plant Project (6.1 Package-UP1-UP4)
This project is cost $2 Billion USD comprises of Main and four Substation, Cooling RO and Brine Tower, Water Treatment Area (Decarbonator Tanks, Pre-treated and RO Tanks), Sulfuric Acid Tanks, MGA Tank, MGA +Raffinate Tanks, Caustic Soda Tanks, Liquid Molten-Sulfur Tanks, PPA Tanks and Diesel Fuel tanks, 2.5Kms main and secondary Pipe Racks, Clean and Contaminated Ponds, Sulfuric Acid Unloading Pits, Spill Way and Flush Pit, Rail Loading, Contaminated water line, Tertiary Line, Natural gas line, all duct banks and culver, trenches, road works, 62Kms Fiber Glass Pipe Lines (700mm-1000 diameter), Booster and Buffer Pump Houses, 16- Water Well Field/Control Kiosk and Utility Substation.
This project is cost $2 Billion USD comprises of Main and four Substation, Cooling RO and Brine Tower, Water Treatment Area (Decarbonator Tanks, Pre-treated and RO Tanks), Sulfuric Acid Tanks, MGA Tank, MGA +Raffinate Tanks, Caustic Soda Tanks, Liquid Molten-Sulfur Tanks, PPA Tanks and Diesel Fuel tanks, 2.5Kms main and secondary Pipe Racks, Clean and Contaminated Ponds, Sulfuric Acid Unloading Pits, Spill Way and Flush Pit, Rail Loading, Contaminated water line, Tertiary Line, Natural gas line, all duct banks and culver, trenches, road works, 62Kms Fiber Glass Pipe Lines (700mm-1000 diameter), Booster and Buffer Pump Houses, 16- Water Well Field/Control Kiosk and Utility Substation.
April 2012
To February 2015
Civil and Structural Superintendent
at Jacobs Engineering Group
Location :
Saudi Arabia - Jubail
Project One (1) Title: Chevron Philips Chemical Process & Conversion Plants
(Nylon 6.6) PCC Project w/ cost of $1.2 Billion USD (total area of 50 Has.) @ Jubail, KSA
(Nylon 6.6) PCC Project w/ cost of $1.2 Billion USD (total area of 50 Has.) @ Jubail, KSA
October 2009
To April 2012
Consulting Project Manager
at Al Mutlaq and Bunuhayah Consulting Engineers
Location :
Saudi Arabia - Dammam
Project Title: $120M Seven (7) Storey Mobily Adamah Data Center @Dammam and Pop Rakah Data Center Technical Buildings @Al Khobar, Saudi Arabia.
August 2008
To September 2009
Project Construction Manager
at ACD International Contracting Co. Ltd.
Location :
United Arab Emirates - Dubai
Project Title: Mirdif 3.60 M Gallons reinforced concrete water reservoir, UAE.
September 2007
To August 2008
QS and Contracts Manager
at Belhasa Six Construct LLC
Location :
United Arab Emirates - Abu Dhabi
Project Title: Ferrari Theme Park & Hotel (250 has. Area), Yas Island, Abu Dhabi, UAE.
September 2005
To January 2007
Project Site Manager
at Descon Engineering Ltd
Location :
Pakistan
Project Title: $400 Million Taunsa Bridge-Barrage Emergency Rehabilitation and
Modernization project (Funded by World Bank)
Comprises of:
Weir, sub-weir, abutment fish ladder wall, flared out wall, guide bank, D.G. khan canal head regulator & silt excluder tunnel & breast wall & 6.7 kilometers feeding channels.
Major components:
• 1500’ spillway = Glacis, stilling basins, chute blocks &sills, crest sill beams (Concrete = 300, 000 m3; excavation= 2, 750, 000 m3),
• Stone apron = 200, 000 m3;
• Permanent sheet piles = 7, 700 lm (2.46’X20’)
• Temporary sheet piles=4, 600 lm (2.46’x40’);
• Solid blocks =22, 000 pcs (4’x4’x4’);
• Curtain & cut out walls (2’x7’) = 3, 800 lm;
• Cofferdams =5, 000 lm (Silt clay-10mx 25mx 5m)
• Stone Bern (5mx13mx4.20m).
• Sub weir navigation lock = miter gate &radial gate,
• 6.7 km. Feeding channel & diversion canal = Excavation volume: 1, 000, 000 m3.
• Also participated in planning of Jari Hydraulic Dam’s Project.
Modernization project (Funded by World Bank)
Comprises of:
Weir, sub-weir, abutment fish ladder wall, flared out wall, guide bank, D.G. khan canal head regulator & silt excluder tunnel & breast wall & 6.7 kilometers feeding channels.
Major components:
• 1500’ spillway = Glacis, stilling basins, chute blocks &sills, crest sill beams (Concrete = 300, 000 m3; excavation= 2, 750, 000 m3),
• Stone apron = 200, 000 m3;
• Permanent sheet piles = 7, 700 lm (2.46’X20’)
• Temporary sheet piles=4, 600 lm (2.46’x40’);
• Solid blocks =22, 000 pcs (4’x4’x4’);
• Curtain & cut out walls (2’x7’) = 3, 800 lm;
• Cofferdams =5, 000 lm (Silt clay-10mx 25mx 5m)
• Stone Bern (5mx13mx4.20m).
• Sub weir navigation lock = miter gate &radial gate,
• 6.7 km. Feeding channel & diversion canal = Excavation volume: 1, 000, 000 m3.
• Also participated in planning of Jari Hydraulic Dam’s Project.
September 2003
To September 2005
Construction Project Manager
at Al Harbi Trading and Contracting Co. Ltd
Location :
Saudi Arabia - Turaif
Project Title: Turaif General Hospital (200 Beds), Northern Province, Saudi Arabia.
November 2001
To January 2003
Project Engineer
at Al Zamil Group
Location :
Saudi Arabia - Jeddah
Project Title: Middle East Shopping Center and King Abdullah Aziz University Library, Jeddah, Kingdom of Saudi Arabia.
August 2000
To November 2001
Project Engineer
at Freyssinet Saudi Arabia
Location :
Saudi Arabia - Jeddah
Project Title: National Commercial Bank and Mercedes Show Room, Jeddah, Saudi Arabia.
September 1999
To April 2000
Deputy Project Manager
at L & Maxco General Contractor
Location :
Philippines - Quezon City
Project Title: National Bookstore Shopping Center and 14 Storey Tiffany Court, Makati and Quezon City, Philippines.
March 1998
To September 1999
Senior Project Engineer
at Shimizu Construction Corporation
Location :
Philippines - Makati City
Project Title: Terumo Industrial Factory Project (2 has.), Laguna Techno Park, Philippines.
January 1995
To March 1998
Project Engineer or Owner's Representative
at AIC Realty Corporation - Owned by Tan Yu (1995 Top 10 World's Richest Man)
Location :
Philippines - Pasig City
Project Title: High-rises: 37 Storey AIC Gold Tower (Pasig), 37 Storey AIC Victoria Tower (Makati) & 43 Storey AIC Waldorf Tower (Manila), Philippines.
May 1992
To August 1994
Construction Project Engineer
at Federal Builders Inc.
Location :
Philippines - Quezon City
Project Title: 3 has. Evegotesco Shopping Mall (Quezon City) and 37 Storey Trafalgar Plaza (Makati City), Philippines.
November 1991
To May 1992
Consulting Resident Engineer
at Asia Halcrow Consulting Engineers
Location :
Philippines - Makati City
Project Title: 4 units High School Buildings @ four different cities (USAID Funded), Tayabas/ Pagbilao/ Atimonan/ Alabat Municipalities. Philippines.
August 1991
To November 1991
Senior Project Engineer
at Technoserve International Co. (Sister co. of Japan Gas. Corp
Location :
Philippines
Project Title: Structural Designing for PERTAMINA Indonesia Exor-1 Process & Arak Refineries, Ayala Alabang, Philippines.
July 1990
To July 1991
Construction Chief Engineer
at LAROSA Construction Corporation
Location :
Philippines
Project Title: PLDT X5 IMPACT Transmission project (34 Relay Station, 17 Buildings & 17 Site Developments), Luzon- Visayas and Mindanao, Philippines.
July 1989
To July 1990
Consulting Resident Engineer
at MEGATECH Consulting Engineers
Location :
Philippines - Mandaluyong City
Project Title: Eveready Battery Factory Processing Plant & Administration building, Mandaluyong City, Philippines.
February 1988
To May 1989
Consulting Asst. Resident
at Manaois Consulting Engineers
Location :
Philippines - Cotabato
Project Title: Construction of 4th Story, Notre Dame University, New Library College Bldg., and expansion of NDU Elementary Bldg., Construction of Cotabato City Health Expansion Bldg. & Lamsan Trading Processing Conveyor & Support, Cotabato City, Philippines.
January 1985
To January 1988
Land Surveyor/ Construction Field Engineer
at Dee- Dacup Surveying and Construction Co.
Location :
Philippines - Cotabato
Handle construction of housing projects at Polloc, Pigkawayan, Marbel
and Davao cadastral, subdivision & topographic surveying works.
1. Prepare project work schedule.
2. Evaluate accomplishment & prepare/ revise catch up work schedule and S-curve.
3. Attend coordination meeting w/ Subcontractor & Engineers/ Manager.
and Davao cadastral, subdivision & topographic surveying works.
1. Prepare project work schedule.
2. Evaluate accomplishment & prepare/ revise catch up work schedule and S-curve.
3. Attend coordination meeting w/ Subcontractor & Engineers/ Manager.
January 1984
To January 1985
Quantity Surveyor/ Estimator
at Dee- Dacup Surveying and Construction Co.
Location :
Philippines - Cotabato
1. Prepare bill of quantity and costing of projects.
2. Prepare all necessary documents for building permit submittal.
3. Monitor site progress and qty. accomplishment for billing purposes.
2. Prepare all necessary documents for building permit submittal.
3. Monitor site progress and qty. accomplishment for billing purposes.
January 1983
To January 1984
Draftsman
at Dee- Dacup Surveying & Construction Company
Location :
Philippines - Cotabato
1. Prepare Lot plan for Bureau of Land approval.
2. Prepare table survey & subdivide whole lot into required number of lots &
prepare sketch plan.
3. Draft structural &architectural plans for housing project.
2. Prepare table survey & subdivide whole lot into required number of lots &
prepare sketch plan.
3. Draft structural &architectural plans for housing project.
Share on Facebook
Share on Twitter
Share Via Email