Total des années d'expérience: 43 Années, 8 Mois
mars 2020
A À présent
Construction Projects Manager
à GRAIA Construction Corporation
Lieu :
Philippines - Imus
Address: Imus, Cavite, Philippines.
Projects: Handle the seven (7) flood control projects for Dept. of Public Works & Highways
(DPWH) and Land Transportation Office (LTO) building.
Projects: Handle the seven (7) flood control projects for Dept. of Public Works & Highways
(DPWH) and Land Transportation Office (LTO) building.
août 2017
A mars 2020
Business Partner/ General Manager
à Rolly Custodio Transport Co
Lieu :
Philippines
Projects: Operate Grab A Car or TNVS
avril 2015
A juillet 2017
Project Civil Structural Engineer
à Jacobs Engineering Group JV Zate Consulting Engineers
Lieu :
Arabie Saoudite - Turaif
Project Two (2) Title: Ma’aden Umm Mual Phosphate Plant Project (6.1 Package-UP1-UP4)
This project is cost $2 Billion USD comprises of Main and four Substation, Cooling RO and Brine Tower, Water Treatment Area (Decarbonator Tanks, Pre-treated and RO Tanks), Sulfuric Acid Tanks, MGA Tank, MGA +Raffinate Tanks, Caustic Soda Tanks, Liquid Molten-Sulfur Tanks, PPA Tanks and Diesel Fuel tanks, 2.5Kms main and secondary Pipe Racks, Clean and Contaminated Ponds, Sulfuric Acid Unloading Pits, Spill Way and Flush Pit, Rail Loading, Contaminated water line, Tertiary Line, Natural gas line, all duct banks and culver, trenches, road works, 62Kms Fiber Glass Pipe Lines (700mm-1000 diameter), Booster and Buffer Pump Houses, 16- Water Well Field/Control Kiosk and Utility Substation.
This project is cost $2 Billion USD comprises of Main and four Substation, Cooling RO and Brine Tower, Water Treatment Area (Decarbonator Tanks, Pre-treated and RO Tanks), Sulfuric Acid Tanks, MGA Tank, MGA +Raffinate Tanks, Caustic Soda Tanks, Liquid Molten-Sulfur Tanks, PPA Tanks and Diesel Fuel tanks, 2.5Kms main and secondary Pipe Racks, Clean and Contaminated Ponds, Sulfuric Acid Unloading Pits, Spill Way and Flush Pit, Rail Loading, Contaminated water line, Tertiary Line, Natural gas line, all duct banks and culver, trenches, road works, 62Kms Fiber Glass Pipe Lines (700mm-1000 diameter), Booster and Buffer Pump Houses, 16- Water Well Field/Control Kiosk and Utility Substation.
avril 2012
A février 2015
Civil and Structural Superintendent
à Jacobs Engineering Group
Lieu :
Arabie Saoudite - AlJubail
Project One (1) Title: Chevron Philips Chemical Process & Conversion Plants
(Nylon 6.6) PCC Project w/ cost of $1.2 Billion USD (total area of 50 Has.) @ Jubail, KSA
(Nylon 6.6) PCC Project w/ cost of $1.2 Billion USD (total area of 50 Has.) @ Jubail, KSA
octobre 2009
A avril 2012
Consulting Project Manager
à Al Mutlaq and Bunuhayah Consulting Engineers
Lieu :
Arabie Saoudite - Dammam
Project Title: $120M Seven (7) Storey Mobily Adamah Data Center @Dammam and Pop Rakah Data Center Technical Buildings @Al Khobar, Saudi Arabia.
août 2008
A septembre 2009
Project Construction Manager
à ACD International Contracting Co. Ltd.
Lieu :
Émirats Arabes Unis - Dubaï
Project Title: Mirdif 3.60 M Gallons reinforced concrete water reservoir, UAE.
septembre 2007
A août 2008
QS and Contracts Manager
à Belhasa Six Construct LLC
Lieu :
Émirats Arabes Unis - Abu Dhabi
Project Title: Ferrari Theme Park & Hotel (250 has. Area), Yas Island, Abu Dhabi, UAE.
septembre 2005
A janvier 2007
Project Site Manager
à Descon Engineering Ltd
Lieu :
Pakistan
Project Title: $400 Million Taunsa Bridge-Barrage Emergency Rehabilitation and
Modernization project (Funded by World Bank)
Comprises of:
Weir, sub-weir, abutment fish ladder wall, flared out wall, guide bank, D.G. khan canal head regulator & silt excluder tunnel & breast wall & 6.7 kilometers feeding channels.
Major components:
• 1500’ spillway = Glacis, stilling basins, chute blocks &sills, crest sill beams (Concrete = 300, 000 m3; excavation= 2, 750, 000 m3),
• Stone apron = 200, 000 m3;
• Permanent sheet piles = 7, 700 lm (2.46’X20’)
• Temporary sheet piles=4, 600 lm (2.46’x40’);
• Solid blocks =22, 000 pcs (4’x4’x4’);
• Curtain & cut out walls (2’x7’) = 3, 800 lm;
• Cofferdams =5, 000 lm (Silt clay-10mx 25mx 5m)
• Stone Bern (5mx13mx4.20m).
• Sub weir navigation lock = miter gate &radial gate,
• 6.7 km. Feeding channel & diversion canal = Excavation volume: 1, 000, 000 m3.
• Also participated in planning of Jari Hydraulic Dam’s Project.
Modernization project (Funded by World Bank)
Comprises of:
Weir, sub-weir, abutment fish ladder wall, flared out wall, guide bank, D.G. khan canal head regulator & silt excluder tunnel & breast wall & 6.7 kilometers feeding channels.
Major components:
• 1500’ spillway = Glacis, stilling basins, chute blocks &sills, crest sill beams (Concrete = 300, 000 m3; excavation= 2, 750, 000 m3),
• Stone apron = 200, 000 m3;
• Permanent sheet piles = 7, 700 lm (2.46’X20’)
• Temporary sheet piles=4, 600 lm (2.46’x40’);
• Solid blocks =22, 000 pcs (4’x4’x4’);
• Curtain & cut out walls (2’x7’) = 3, 800 lm;
• Cofferdams =5, 000 lm (Silt clay-10mx 25mx 5m)
• Stone Bern (5mx13mx4.20m).
• Sub weir navigation lock = miter gate &radial gate,
• 6.7 km. Feeding channel & diversion canal = Excavation volume: 1, 000, 000 m3.
• Also participated in planning of Jari Hydraulic Dam’s Project.
septembre 2003
A septembre 2005
Construction Project Manager
à Al Harbi Trading and Contracting Co. Ltd
Lieu :
Arabie Saoudite - Turaif
Project Title: Turaif General Hospital (200 Beds), Northern Province, Saudi Arabia.
novembre 2001
A janvier 2003
Project Engineer
à Al Zamil Group
Lieu :
Arabie Saoudite - Jeddah
Project Title: Middle East Shopping Center and King Abdullah Aziz University Library, Jeddah, Kingdom of Saudi Arabia.
août 2000
A novembre 2001
Project Engineer
à Freyssinet Saudi Arabia
Lieu :
Arabie Saoudite - Jeddah
Project Title: National Commercial Bank and Mercedes Show Room, Jeddah, Saudi Arabia.
septembre 1999
A avril 2000
Deputy Project Manager
à L & Maxco General Contractor
Lieu :
Philippines - Quezon City
Project Title: National Bookstore Shopping Center and 14 Storey Tiffany Court, Makati and Quezon City, Philippines.
mars 1998
A septembre 1999
Senior Project Engineer
à Shimizu Construction Corporation
Lieu :
Philippines - Makati City
Project Title: Terumo Industrial Factory Project (2 has.), Laguna Techno Park, Philippines.
janvier 1995
A mars 1998
Project Engineer or Owner's Representative
à AIC Realty Corporation - Owned by Tan Yu (1995 Top 10 World's Richest Man)
Lieu :
Philippines - Pasig City
Project Title: High-rises: 37 Storey AIC Gold Tower (Pasig), 37 Storey AIC Victoria Tower (Makati) & 43 Storey AIC Waldorf Tower (Manila), Philippines.
mai 1992
A août 1994
Construction Project Engineer
à Federal Builders Inc.
Lieu :
Philippines - Quezon City
Project Title: 3 has. Evegotesco Shopping Mall (Quezon City) and 37 Storey Trafalgar Plaza (Makati City), Philippines.
novembre 1991
A mai 1992
Consulting Resident Engineer
à Asia Halcrow Consulting Engineers
Lieu :
Philippines - Makati City
Project Title: 4 units High School Buildings @ four different cities (USAID Funded), Tayabas/ Pagbilao/ Atimonan/ Alabat Municipalities. Philippines.
août 1991
A novembre 1991
Senior Project Engineer
à Technoserve International Co. (Sister co. of Japan Gas. Corp
Lieu :
Philippines
Project Title: Structural Designing for PERTAMINA Indonesia Exor-1 Process & Arak Refineries, Ayala Alabang, Philippines.
juillet 1990
A juillet 1991
Construction Chief Engineer
à LAROSA Construction Corporation
Lieu :
Philippines
Project Title: PLDT X5 IMPACT Transmission project (34 Relay Station, 17 Buildings & 17 Site Developments), Luzon- Visayas and Mindanao, Philippines.
juillet 1989
A juillet 1990
Consulting Resident Engineer
à MEGATECH Consulting Engineers
Lieu :
Philippines - Mandaluyong City
Project Title: Eveready Battery Factory Processing Plant & Administration building, Mandaluyong City, Philippines.
février 1988
A mai 1989
Consulting Asst. Resident
à Manaois Consulting Engineers
Lieu :
Philippines - Cotabato
Project Title: Construction of 4th Story, Notre Dame University, New Library College Bldg., and expansion of NDU Elementary Bldg., Construction of Cotabato City Health Expansion Bldg. & Lamsan Trading Processing Conveyor & Support, Cotabato City, Philippines.
janvier 1985
A janvier 1988
Land Surveyor/ Construction Field Engineer
à Dee- Dacup Surveying and Construction Co.
Lieu :
Philippines - Cotabato
Handle construction of housing projects at Polloc, Pigkawayan, Marbel
and Davao cadastral, subdivision & topographic surveying works.
1. Prepare project work schedule.
2. Evaluate accomplishment & prepare/ revise catch up work schedule and S-curve.
3. Attend coordination meeting w/ Subcontractor & Engineers/ Manager.
and Davao cadastral, subdivision & topographic surveying works.
1. Prepare project work schedule.
2. Evaluate accomplishment & prepare/ revise catch up work schedule and S-curve.
3. Attend coordination meeting w/ Subcontractor & Engineers/ Manager.
janvier 1984
A janvier 1985
Quantity Surveyor/ Estimator
à Dee- Dacup Surveying and Construction Co.
Lieu :
Philippines - Cotabato
1. Prepare bill of quantity and costing of projects.
2. Prepare all necessary documents for building permit submittal.
3. Monitor site progress and qty. accomplishment for billing purposes.
2. Prepare all necessary documents for building permit submittal.
3. Monitor site progress and qty. accomplishment for billing purposes.
janvier 1983
A janvier 1984
Draftsman
à Dee- Dacup Surveying & Construction Company
Lieu :
Philippines - Cotabato
1. Prepare Lot plan for Bureau of Land approval.
2. Prepare table survey & subdivide whole lot into required number of lots &
prepare sketch plan.
3. Draft structural &architectural plans for housing project.
2. Prepare table survey & subdivide whole lot into required number of lots &
prepare sketch plan.
3. Draft structural &architectural plans for housing project.
Partager sur Facebook
Partager sur Twitter
Partager via Email