Soumya Roy, Senior Planning & Cost Control Engineer

Soumya Roy

Senior Planning & Cost Control Engineer

SAIF BIN DARWISH

Location
United Arab Emirates
Education
Bachelor's degree, CIVIL ENGINEERING (B.E-Civil)
Experience
21 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 11 Months

Senior Planning & Cost Control Engineer at SAIF BIN DARWISH
  • United Arab Emirates - Abu Dhabi
  • My current job since October 2012

Responsible for overall project based Cost management through Budget Formation, Actual Cost Analysis, EV Analysis, Co-ordination Between Finance, & ERP Division, Cost Reporting & ETC/CTC Projection for all Verticals. Analysis & Monitoring of Activity based Unit Cost data-project wise & related Variation & Corrective Action identification. Integration of Cost reporting possibilities in P6 8.2 Web Version for the management. Preparation of Tender Programs & Estimation works related to bidding.

Senior Engineer MIS at M/s AFCONS Infrastructure Ltd
  • India - Kolkata
  • November 2011 to September 2012

• Nov 2011 till date.
M/s AFCONS Infrastructure Ltd
MIS in Charge for Construction of Viaduct for Metro Rail from New Garia to Airport Link (Pkg ANV1 & ANV3) -Overall 10.96 km of Project Length. Client -RVNL. Project Cost - 4460 Million. Key Responsibilities were preparation of Project Budget and Monthly MIS & Cost Control Statements along with day to day planning related monitoring Works. Identifting Cost Control areas and implementing Cost Control Measures.Selection of Sub contractors and Rate Analysis of Items of Work.

Planning-Manager for Kolkata Elevated Corridor Project at M/s Hindustan Construction Company Ltd
  • India
  • November 2009 to October 2011

• Nov 2009 -Oct 2011.
As Planning-Manager for Kolkata Elevated Corridor Project -4 Lane 9.154KM long flyover connecting existing AJC Bose Flyover to E.M Bypass beyond Parama Rotary towards Airport & Garia. CLIENT-KMDA. Project Cost 3179 Million. (JNNURM & State Funded) . Major Responsibilities included Primary Design Co-ordination, Preparation Overall Contractual Program & updation etc Cost Control Measures through Project Budget Projections & Estimation and Contractual Correspondence related to EOT/ Impacted schedule etc.

Planning Engineer at Paradip Road Project at NH-5A at M/s Hindustan Construction Company Ltd
  • India
  • April 2007 to November 2009

• April 2007 to Nov 2009.
As a Planning Engineer at Paradip Road Project at NH-5A. CLIENT: PPRCL / NHAI. Project Cost: Rs. 3270 Million. (Paradip Port Connectivity Project) Preparation of Season Budget, Cost To Company Calculation for a project on Quarterly basis and reviewing the same at the end of each Quarter. Costing Analysis of Actual vs. Budget with Variance. Estimation of balance quantities and identification of variations, quantity work out from GFC Drawings issued. Preparing and Analyzing MIS with Accounts Executive reporting to the Project Controller regarding shortcomings, identifying improvement zones and shortfalls as well remedial measures taken up. Preparation of Monthly as well as season work programs. Checking of Working Drawings and Bar Bending Schedule for issue to Client/Consultant. Preparation of Claim Documents regarding EOT/ Overstay etc. Proper documentation of Drawings, Work methodology and contractual letters etc. Preparation of Client Program, Monthly Client Report, Flash report Physical and Financial Status of the project to the Management. Preparation of review slides regarding project performance on Quarterly basis. Technical Co-Ordination in between all the Service Dept at Site level. (Operations, Mechanical and Procurement). Additional responsibilities include Budget Preparation and Cost Control Measures for Assam Road Project Package AS 23. Project Cost: Rs. 3170 Million. (East West Corridor)

Assistant Engineer, at the Construction Site at GAMMON INDIA LTD
  • India
  • July 2005 to April 2007

❖ JULY 2005 TO April 2007
M/s. GAMMON INDIA LTD. India.
• As Assistant Engineer, at the Construction Site of 1.965 km long, 7 Ramp R.O.B (DOMORIA FLYOVER) JALLANDHAR.Govt of INDIA funded Project of Rs.250 Million. The project comprises of 47 spans of varying length (20-35m) super structure comprising of Box & I Girders (PSC) and 817 m of Reinforced Earthwall at ramps. Duties involving execution of Superstructure Work comprising of Casting of Pretension I-girders by using LONG LINE System of Prestressing, it's launching and casting of Deck Slab. Preparation of Control Estimate and Daily planning and co-ordination of activities.
• As Assistant Engineer, at the Construction Site of 310 m long R.C.C Spandrel Braced Arch and Prestressed Concrete Box Girder CLC Bridge at Bagchal Over Govind Sagar Reservoir (Himachal Pradesh) CLIENT: H.P (P.W.D) Project Cost:230 Million (NABARD Funded Project) . Duties involved Monitoring of excavation of Rock strata by Drilling and Blasting for open foundation of 45 m Ht. of Pier. Preparation of Concrete Mix Design, Soil Investigation, Billing of Sub-Contractors, Estimation of Quantities etc.Preparation of Control Estimate and Daily planning and co-ordination of activities.

Field Engineer in Construction of National Highway Project Contract at Lea Associates South Asia Pvt. Ltd. In association with Lea International, Canada
  • India
  • May 2003 to July 2005

❖ MAY 2003 TO JULY 2005
Lea Associates South Asia Pvt. Ltd. In association with Lea International, Canada
• Worked as a Field Engineer in Construction Supervision of National Highway Project Contract no. GTRIP/6 (Construction Package IV-A & IV-C) (World Bank Funded Project) -implemented under FIDIC Conditions of contract and ICB, Project Cost Rs. 5760 Million. CLIENT: NHAI (GOVT OF INDIA)
• Responsible for Supervision of the Structural works along with Quality Assurance Wing for the construction of 4-laning and Strengthening of NH-2.which comprises Major Bridge-Sone Bridge (3.065KM long prestressed concrete post tensioned with segmental box girder on Well Foundation) & 21 kms. New bypass (Sasaram Bypass), 5 minor bridges, 5 underpasses, 7 subways, 16 box culverts, 51 HP culverts and more than 9KM of Retaining Wall. Extensive Execution & Supervision construction experience related to Flexible Pavement, Cross Drainage Works & Minor Bridges. The duties include overall supervision of physical progress of work by using project management technique, ensuring establishment of proper quality assurance and standard controlled system of works maintaining safety and environmental practices under the able guidance of Bridge Engineer and Resident Engineer.

Site Engineer at M\s Amritalal Chatterjee (Govt.Contractor)
  • India
  • May 2002 to May 2003

❖ MAY 2002 TO MAY 2003
M\s Amritalal Chatterjee (Govt.Contractor)
• Worked as a Site Engineer at a construction site of a R.C.C Box Bridge (28m) with Open Foundation (R.O.B) at Anandapur, a project work of (P.W.D) Govt.of West Bengal. I have predominantly worked on CONCRETE mix design of different Grades such as M 20, M 25, M 35 as per workability and strength requirements of the different road structures of the project as per IS: 10262 - 1982 / SP 23.
• I was responsible for preparing Bar Bending Schedule, quantity calculation, preparation of bill and construction execution of open foundation, & its superstructure. I was instrumental in establishing the Quality Control Laboratory at site regarding tests conducted for cubes, aggregates, & cement.

Education

Bachelor's degree, CIVIL ENGINEERING (B.E-Civil)
  • at Jawaharlal Nehru National College of Engineering
  • May 2002

Passed BACHELOR OF ENGINEERING IN CIVIL ENGINEERING from Jawaharlal Nehru National College of Engineering under Visveswaraiah Technological University, Belgaum, Karnataka in 2002 with 69.06% (FIRST CLASS) and an average of 63.86% (All Semesters)

Specialties & Skills

Project Estimation
MS Project
Project Execution
Microsoft Office
Project Costing
Computer Skills MSP , MS Office, Primavera
Planning & Monitoring of Large Scale Infrastructure Projects
Project Costing & MIS Monitoring & Reporting
Reporting of Project Progress & Cost Performance Status
DOCUMENTATION
Project Execution Highway & Complex Structural Works
Project Methodology & Estimation

Languages

Bengali
Expert
Hindi
Expert
English
Expert

Training and Certifications

Yes (Certificate)
Date Attended:
April 2007
Valid Until:
March 2008