Team Leader
مجموعة بن لادن السعودية - نوسعة الحرم المدني
Total years of experience :17 years, 10 Months
1 - Civil Work: -
• Excavation.
• Probes under Piles.
• Deep Piles (about 60 m).
• Dewatering System & blanket.
• Waterproofing (EPDM & Re-Injectable System).
• Raft as Construction Joint Partitions (Huge Reinforcement & hi- rib shuttering ).
• Tower Crane Footing.
• Huge Column (Cross section area 33 m2) by very difficult RMD shattering system.
• Columns by DOKA & GHI Shattering System.
• POLISIO (MP scaffolding system) for Ground Floor Shuttering
1 - Civil Work: -
• Excavation.
• Probes under Foundations.
• Foundations (Isolated Combined & Raft).
• Retaining walls.
• Columns & (Hollow core - Duple T- Solid - Flat) Slap System.
• Cup Lock Scaffolding System for Shuttering.
• Steel Structure Roof Cladding.
• Bridges Steel between Colleges.
• First Fix Steel System for Segmented Curtain Wall.
2 - Architectural: -
• Gypsum Board Partitions System.
• False Celling System.
• Auditoriums Finishing.
• Atriums Finishing.
• Medical & chemical laps Finishing.
• Toilet Accessories.
• Floor finishing (Carpet, Raised Floor, venial, raisin floor, Temper, Epoxy paint, Granite, Ceramics).
• Aluminum Segmented Curtain Wall & Precast Panel cladding.
3 - Managing Between (ELC. MECH). And Civil / Architectural work
• Fire fitting System.
• Central A/C. System.
• Water Supply System.
• Water Return System.
• Electrical & Low Current Work.
Position : Designer & Supervisor Engineer for R.C. Structures
Some projects as: -
• Border Guard Housing Repair (Maqna - Tabuk ) (20, 000, 000 S.R.)
• Border Guard Outpost (Alquff - Duba - Tabuk) ( 3, 000, 000 S.R.)
• Border Guard Outpost (Aldemaigh- Alwagh- Tabuk) ( 3, 000, 000 S.R.)
• Border Guard Alwagh Drill Center (Alwagh- Tabuk) (3, 000, 000 S.R.)
• Medical Center (AL Fasalya Quarter- Tabuk) (950, 000 S.R.)
• Maisalon Hotel ( Doret Tabuk Quarter - Tabuk) (Designer)