Technical Office Engineer
RtX consultant
Total years of experience :13 years, 6 Months
Revision of All Arch. drawings with Civil drawings
Quantity Survey
preparing BOQ
Discuss what's the suitable projects with Target
Quantity survey, prepare tenders with all architectural and construction details, up to date with current materials prices, connect with different companies to ensure from quality and value for all elements, connect with other companies outside Qatar to compare expenses of getting materials from sources with its transportation value and getting them from subcontractors.
Organize all site schedules for labors, reports, performance and costs .
Deal with the owner or the consultant and follow up all steps and sending continuous updates so that we get our deserving extract without delay .
Advertising and marketing for our company to other construction design consultants with our updated brochure.
Project Title: Toyota Car Park (Al Manaa Group)
• Job Description :
B.O.Q of Car park.
B.O.Q of Administration building.
B.O.Q of Staff Camp.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: Store building ( Al Gharafa )
• Job Description :
B.O.Q of Store building.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: 30 Villa (Ar rian)
• Job Description :
B.O.Q of Villas and Guard room.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: 2 Villas (Elmora)
• Job Description :
B.O.Q of Villas and Guard Room
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Update.
Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Send all of those drawings to Saudi Arabia Company to start site work.
• Day by day follow what happen in site to solve all sudden problems on time to avoid any delay of project time.
Visit site and sketch the place from all sides.
• Draw all architecture drawings.
• Then prepare all shop drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site day by day to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.
Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site day by day to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.
Visit the building.
• Take pictures of all things that wanted to be replaced, repaired or maintained.
• Prepare a report of the building contain all pictures.
• Determine if cracks in walls or in finishing.
• Determine how to repair them, their cost, and the estimated time for that.
• Exchange of destroyed disks, chairs, fans, doors, and door locks.
• Determine the cost of that.
• Determine the cost of repainting the building.
Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality
Revision of all architecture drawings of all models.
• Revision of all dimensions, walls, columns in the architecture drawing for the same model.
• Revision the civil drawings with the architecture drawings for the same model (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Redesign of all slabs, beams, columns, walls, foundations.
• Revision of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Go to site to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.
visit the building
• Determine if it's safe to put the tower above it or not.
• Measure all roof dimensions and draw a sketch of it.
• Draw that roof in AutoCAD program with its dimension.
• Draw the air condition room and the Electricity generator room with their dimensions which are known.
• Determine the loads of the tower as we know all its content.
• Deign of its concrete foundation reinforcement.
Visit the building to see all cracks and take pictures to them.
• Determine the width of all cracks and its position.
• Try to know if the reinforcement is issued or not.
• Prepare a report of the building and its condition including pictures and description of all cracks (position and width).
• Determine if the building is in a critical position or not and if we can prepare it with its condition or we must remove and rebuild it.
• Suggest the way of repairing the building.
design of architecture drawing of villa
• Revision of architecture Drawings
• Revise of all axis in drawings
• convert architecture drawings to civil drawings
• Calculation of all loads expected to be in the building.
• Draw the building in designing program with expected dimension of all sections.
• check if all sections are safe or not
• Calculation of reinforcement of all sections for the building (slabs, column, beams and foundations).
• Draw all sections of building with its reinforcement.
• Calculations of concrete and reinforcement amounts (quantity survey).
Supervising implementation of a residential building
I got to appreciate the privilege in the graduation project (restoration and repair facilities) in the Department of Civil Engineering, which was divided into two parts First Section: related Compass column Pkmrh flanked with iron chips and there their internal rebar and exposed to the forces of tightening. Section Deliberation: related renovating a building Stadium College of Physical Education at the University of Tanta Has passed Course DVR (autocad2008). And also you self-education program design (CSI.ETAB.NL.V.9.2.0)