Sarah Elkanany, Technical Office Engineer

Sarah Elkanany

Technical Office Engineer

RtX consultant

Location
Qatar - Doha
Education
Bachelor's degree, civil engineer
Experience
13 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 6 Months

Technical Office Engineer at RtX consultant
  • Qatar - Madinat ash Shamal
  • January 2018 to March 2022

Revision of All Arch. drawings with Civil drawings
Quantity Survey
preparing BOQ
Discuss what's the suitable projects with Target

Senior Technical Office Engineer at ELAF Contacting Company
  • Qatar - Doha
  • August 2015 to December 2018

Quantity survey, prepare tenders with all architectural and construction details, up to date with current materials prices, connect with different companies to ensure from quality and value for all elements, connect with other companies outside Qatar to compare expenses of getting materials from sources with its transportation value and getting them from subcontractors.
Organize all site schedules for labors, reports, performance and costs .
Deal with the owner or the consultant and follow up all steps and sending continuous updates so that we get our deserving extract without delay .
Advertising and marketing for our company to other construction design consultants with our updated brochure.

Project coordinate at Atlas Contracting Company
  • Qatar - Doha
  • September 2014 to May 2015

Project Title: Toyota Car Park (Al Manaa Group)
• Job Description :
B.O.Q of Car park.
B.O.Q of Administration building.
B.O.Q of Staff Camp.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: Store building ( Al Gharafa )
• Job Description :
B.O.Q of Store building.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: 30 Villa (Ar rian)
• Job Description :
B.O.Q of Villas and Guard room.
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Updates.
...............................................................................................................................
Project Title: 2 Villas (Elmora)
• Job Description :
B.O.Q of Villas and Guard Room
• Job Role :
• Visit the site twice weekly.
• Survey all Required Dimensions and revise it with Drawing .
• Quantity survey for all materials ( Excavation, Concrete, Steel, Reinforcement Steel, Ceramic, Blocks, Plaster, Doors and windows, ..........etc. ).
• Determine with Purchasing manager the suitable offers of prices according to market.
• Calculate the total expected cost.
• Determine the total Expected duration for the project from beginning to finish.
• follow all Method Statements of the project.
• preparing Weekly and Monthly Reports with all current Changes .
• Considering H.S.E - Health, Safety and Environment.
• Be on Contact with all Site Engineers to Follow all site Update.

Senior Design Engineer at MOC consultant
  • Egypt
  • February 2014 to September 2014

Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Send all of those drawings to Saudi Arabia Company to start site work.
• Day by day follow what happen in site to solve all sudden problems on time to avoid any delay of project time.

Assistant Project Engineer at United group for construction
  • Egypt - Tanta
  • January 2014 to September 2014

Visit site and sketch the place from all sides.
• Draw all architecture drawings.
• Then prepare all shop drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site day by day to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.

Senior Design & Site Engineer at Sohag city baladya
  • Egypt
  • January 2012 to January 2014

Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site day by day to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.

Maintenance Engineer at Sohag city baladya
  • Egypt
  • January 2011 to January 2012

Visit the building.
• Take pictures of all things that wanted to be replaced, repaired or maintained.
• Prepare a report of the building contain all pictures.
• Determine if cracks in walls or in finishing.
• Determine how to repair them, their cost, and the estimated time for that.
• Exchange of destroyed disks, chairs, fans, doors, and door locks.
• Determine the cost of that.
• Determine the cost of repainting the building.

Senior Design & Site Engineer at freelanser
  • Egypt - Tanta
  • March 2010 to December 2010

Prepare all architecture drawings.
• Revision of all dimensions, walls, columns in the architecture drawing for the building.
• Prepare the civil drawings.
• Revision the civil drawings with the architecture drawings (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Design of all slabs, beams, columns, walls, foundations.
• Design of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Suggest total cost.
• Go to site to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality

Senior Design & Site Engineer at rtc
  • Egypt - Cairo
  • August 2008 to March 2010

Revision of all architecture drawings of all models.
• Revision of all dimensions, walls, columns in the architecture drawing for the same model.
• Revision the civil drawings with the architecture drawings for the same model (axis, columns, walls, beams and stairs).
• Recalculation of all loads.
• Redesign of all slabs, beams, columns, walls, foundations.
• Revision of all sections and reinforcements.
• Quantity survey of concrete and reinforcement.
• Go to site to follow all construction steps and to do field tests on concrete to be sure of its toughness and quality.

Design Structure Engineer at RTC
  • Egypt - Cairo
  • August 2008 to March 2010

visit the building
• Determine if it's safe to put the tower above it or not.
• Measure all roof dimensions and draw a sketch of it.
• Draw that roof in AutoCAD program with its dimension.
• Draw the air condition room and the Electricity generator room with their dimensions which are known.
• Determine the loads of the tower as we know all its content.
• Deign of its concrete foundation reinforcement.

Repair Engineer at RTC
  • Egypt - Cairo
  • August 2008 to March 2010

Visit the building to see all cracks and take pictures to them.
• Determine the width of all cracks and its position.
• Try to know if the reinforcement is issued or not.
• Prepare a report of the building and its condition including pictures and description of all cracks (position and width).
• Determine if the building is in a critical position or not and if we can prepare it with its condition or we must remove and rebuild it.
• Suggest the way of repairing the building.

Design Engineer at RTC
  • Egypt - Cairo
  • August 2008 to March 2010

design of architecture drawing of villa
• Revision of architecture Drawings
• Revise of all axis in drawings
• convert architecture drawings to civil drawings
• Calculation of all loads expected to be in the building.
• Draw the building in designing program with expected dimension of all sections.
• check if all sections are safe or not
• Calculation of reinforcement of all sections for the building (slabs, column, beams and foundations).
• Draw all sections of building with its reinforcement.
• Calculations of concrete and reinforcement amounts (quantity survey).

Site and Design Engineer at Free
  • Egypt
  • July 2009 to February 2010

Supervising implementation of a residential building

Education

Bachelor's degree, civil engineer
  • at College of Engineering
  • July 2008

I got to appreciate the privilege in the graduation project (restoration and repair facilities) in the Department of Civil Engineering, which was divided into two parts First Section: related Compass column Pkmrh flanked with iron chips and there their internal rebar and exposed to the forces of tightening. Section Deliberation: related renovating a building Stadium College of Physical Education at the University of Tanta Has passed Course DVR (autocad2008). And also you self-education program design (CSI.ETAB.NL.V.9.2.0)

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

Arabic
Expert
English
Expert
French
Beginner
Dutch
Beginner

Memberships

engineering association
  • civil engineer
  • August 2008

Training and Certifications

excellent (Certificate)
Date Attended:
July 2007
Valid Until:
August 2007

Hobbies

  • civil Engineering- Travel-Designing