Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

sherif Gad

Maintenance Engineer - Countlines and Candy

Location:
Egypt - Cairo
Education:
Master's degree, Mechatronics
Experience:
3 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  3 Years, 9 Months   

October 2014 To September 2015

Maintenance Engineer - Countlines and Candy

at Mondelez International
Location : Egypt
In charge of 9 Electrical and Mechanical Technicians, 1 maintenance planner, Leading all maintenance activities in Count lines plant, Cadbury Egypt.

Provide Daily/Weekly/Monthly cost analysis sheets per Section/Line/Equipment using SAP application.

Reporting directly to the Production Section Manager, Handling all activities related to repairing, maintenance and new projects in 4 production lines.
Biscuit line (Mandolen)
Chocolate lines (Moro, Gersy)
Chixo Line.

Currently, creating a maintenance management system based on Kraft’s standards and Integrated lean six sigma (IL6S).

Supporting the Autonomous Maintenance Team in closing all types of defects appearing in the daily CIL activities in my production lines.

Using advanced problem solving techniques such as RCA (Root cause analysis -- 5 Why -- Fish bone) ..

Supporting the AM Teams in generating Technical OPLs (one point lessons)

Supporting the AM Team in the Technical Kaizens ..

Leading the PM teams (Progressive Maintenance) in the Bars - Candy sections, Hold Daily weekly meetings to close all gabs related to previous breakdowns. Awarding my teams for the Zero Break down cases.

1- Ensure high scoring records in the Safety, Quality trackers, Ensure high Global Efficiency (GE) for the 4 production lines.
2- Total productive maintenance (TPM) leading by evaluating the KPI's of each team work and follows up of it.
d. Ensuring essential spare parts are available on spare parts store stock and the criticality of it.
3- Cost reduction of the PM according to the budget.
4- The overall equipment efficiency (OEE) analysis
5- Supervision of all Preventive-protective and proactive maintenance of the production lines
6- Taking all responsibilities of upgrading my production lines as a project engineer which includes supplier and negotiations and price settlement
June 2013 To September 2014

Electrical and automation Maintenance Engineer

at BMW EGYPT
Location : Egypt - Cairo
In charge of 9 technicians, Leading all electrical/automation and maintenance tasks in Bavarian auto manufacturing company. Solid record of achievements over 2 years of working experience.
Tasks:
1- Establish preventive maintenance checklist from equipment catalogue for all factory equipment.
2- Plan, Schedule and Implement condition monitoring techniques and preventive maintenance procedures (KPI) based on ISO standards. -Emergency troubleshooting and repairs, and Provide accurate repair estimates.
3- Accurately diagnose root causes of equipment failures and implement effective corrective action and maintain the failure analysis database.
4- Spare parts ordering procedures considering inventory of necessary failed components.
5- Implement continuous improvement techniques.
6- Troubleshooting PLC-type control systems (s7-400), Wincc flexible.
7- Commissioning drives Micromaster, Excellent data sheet reader and device configuration, Tools, Sensors. Actuators.
8- Fixing Devices and electronic cards (Through hole PCBs)
9- Report to the maintenance manager for inside the plant/outside issues.
10- Meet suppliers, Negotiate, Settle down prices.
May 2012 To June 2013

Projects & Models Engineer

at bavarian auto group (bmw egypt)
Location : Egypt - Cairo
Reporting directly to the head of the Engineering Department:
1. Following up, coordinating and executing the engineering aspects of the newly introduced
car models and new projects.
2. Prepare for project planning, budgeting, cost of equipments, new tools and prepare
expected scenarios of the German launch team expenses .etc.
3. Following up the delivery of new tools & equipments for new projects.
4. Maintaining the project schedule, deliverables, budget issues, and risks.
5. Track the project progress and provide timely and accurate status sheets.
6. Communicate with germen launch team for Hotel & flight reservation, Coordinate for
their transportations and other daily needs.
7. Coordinate with the process & production sections for project updates, and LOP list during
projects.
8. Preparing the transitions to operations. Project closer (Final delivery to the Sales
department).
9. Prepare high quality documentation, and learned lessons after the project closer.
Tools: Outlook, Microsoft office project, AutoCAD, MS office.

 Technical responsibilities:

Fully responsible for Electronic maintenance in BAMC, service centers and Showrooms.
1- Diagnose and evaluate devices and instruments for fixation.
2- Make purchase requests and following up the delivery for needed spare parts.
3- Fixing Devices and electronic cards (Through hole PCBs) and following up their status after
sending them to the requester.
4- Send devices and devices to special places for diagnosing and fixation to reduce the cost
and expenses.
5- Lead a number of electrical technicians, assign tasks and coordinate with the maintenance
section for “Less cost maintenance solutions in the factory & service centers”.
6- Taking full responsibility of the electrical maintenance engineer in his absence. And share
responsibility of the Paint shop section (Automation duties).
7- Make foreign purchase requests and excellent skills in communicating with external
suppliers for instructions & devices configurations.
8- Coordinate with our maintenance supervisors in the service center for maintenance
issues.

 Achievements:

“Review the cost impact”
1- Fixing the controller’s configuration of the factory Genset 3412 unit.
2- Fixing all production control screens in the factory (Around 20 screen’s microcontroller PCB).
3- Fixing Deutronic chargers and power processors (Around 10 Chargers).
4- Fixing the TempGard Instrument.
5- Designing whole new lighting system “including power calculations, number of needed items and component” for Zamalek Mini-cooper showroom.
6- Constructed new serial numbers for our instruments to facilitate the movement in/out of the factory. And new database for electronics and repair companies, in addition to the foreigner suppliers such as Farnell and mouser.

 Attended and current project:

1. F30 “3 series BMW vehicles 335, 328, 320”. 2 May 2012 to 20 June 2012
2. F02 LCI “ 7 Series BMW Vehicle 740”. 2 Dec 2012 to 11 Dec 2012
3. Paint Shop extension Mega-project.
January 2012 To April 2012

maintenance engineer ( electro mechanical )

at Diamond canari
Location : Egypt - Cairo
Maintenance for CNC Machines

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
May 2015

Master's degree, Mechatronics

at helwan university
Location : Egypt - Cairo
Grade: 3.26 out of 4
Master of Science (M.Sc), Mechatronics Engineering Sept 2011 - May 2015

Thesis Title “Study of Magnetorheological damper in seat suspension for heavy trucks”

Publications:

1. “Vibration Control of Semi-Active MR Seat Suspension for Commercial Vehicles using Genetic PID Controller”. Vibration Engineering and Technology of Machinery, Mechanisms and Machine Science 23. Springer International Publishing, 2015. pp. 721-732, VETOMAC X Conference, 9-11 Sept 2014, Manchester, UK. DOI 10.1007/978-3-319-09918-7_64


2. “Ride Comfort Enhancement of Heavy Vehicles using Magnetorheological Seat Suspension” International Journal of Heavy vehicle System. Vol. 22, No. 2, 2015. pp. 93 -113 Inderscience Enterprises Ltd.


3. “Multi-objective genetic algorithm fractional-order PID controller for semi-active magnetorheologically damped seat suspension, ” Journal of Vibration and Control. 1-19. SAGE Publisher jvc.sagepub.com DOI: 10.1177/1077546315591620
July 2011

Bachelor's degree, B.SC mechatronics engineering

at Helwan university faculty of engineering
Location : Egypt - Cairo
i am a mechatronics engineer, i graduated from helwan university faculty of engineering, i have a great experience in both electrical and mechanical engineering applications, i also can work as an automation engineer

Specialties & Skills

Plant Maintenance

Project Engineering

Maintenance Engineering

Automation

Embedded Systems

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Loading
Loading...
Loading...