Project Manager
Siebenberg Technologies Pvt Ltd
Total years of experience :6 years, 8 Months
Manage 3 Project Coordinators and 24 teams for the Huawei project, Kerala Circle.
Manage the End to End Project of TATA, RJIL, Vodafone Transmission, Idea DWDM, Kerala
Material Transportation, Solving Owner issue, Union issue, Public issue in sites.
Maintaining Integration process until site under on-air.
Attending Meeting with Customer and checking the weekly performance
2.5 years of experience in installation, debugging, commissioning & maintains of Transmission, RAN, BSS, DWDM equipments, Coordinating technicians & Riggers.
Client: Airtel, Etisalat, Tata 3G & 2G, Aircel 3G & 2G, Vodafone.
BTS & MW Pjts: Aircel 3G & 2G, Tata 3G & 2G, Etisalat 2G, BSNL 3G, Reliance 2G.
Installation and Commissioning of Huawei WDM equipments like OLA, OEQ and ROADM
Hands on experience in Node B (BTS 3900, BTS 3900A & DBS) & BTS (3900, 3990A&DBS).
Hands on experience in Huawei DWDM (OSN 3800, 6800, 8800).
Hands on experience in Huawei MW equipments - RTN 620 & RTN 950, NEC Equipments.
Hands on experience in Huawei OSN 8800, OSN 7500 & OSN 3500.
Good experience in attending critical RNC, BSC, BTS & MW outages.
Pre - installation visits in new cell sites to ensure RF and Transmission requirements.
Conducting Acceptance Test for BSC, BTS, MUX, MW Radios, Power plants and Batteries.
Supervising all Installation process of Huawei BTS and RF for Zain and Tigo 3G and 2G project in Tanzania.
Supervising and Commissioning Huawei IPS2000, Hybrid Power system, configuring DG controller intelilite AMF 25, Gen_Trans, etc... Installation and commissioning of DC Power plants and Battery bank.
Implement Automation in Diesel generators by configuring DG control panels
Conducting Site Acceptance test with operator and vendor.
Supervising Installation of Huawei BTS and RF for Safaricom 3G and 2G project in Kenya for 1 month.
VSWR and DTF Checking for site acceptance
RF Survey for Zain 3G project in Uganda.(NSN Project) for 1 month in urgent basis and finished in time.
96 sites 3G RF survey drawings, panoramic photos and documentation submitted without any delay.
Worked as Implementation Manager for the project of ETDB from sept 2009 in Avion Systems Pvt Ltd, Cochin
Manage 5 Coordinators and 28 member’s team for the Etisalat project, Kerala Circle.
Manage the End to End Project of Etisalat, Kerala
Material Transportation, Solving Owner issue, Union issue, Public issue in sites
Controlling Installation of BTS, MW, RF, VSWR Checking, Power Checking and BER Checking.
Worked as an Installation and commissioning, Quality engineer till aug 2009 in Avion Systems Pvt Ltd, Cochin
Installation and commissioning Huawei BSC, BTS (3900, 3012, 3900A), Nokia Flexi and Edge BTS, Ericsson BTS, Minilink, Alcatel BSC, BTS.
Conducting Site Acceptance by checking Tx & Rx Frequency, Output power, Alarms, Labeling, grounding, fuse labeling, Site finder address etc.
Documentation for Site Acceptance, Quality and Assisting Co-ordination.
Checking Performance Statistics using Business Object. Path survey for new sites.
Parameters check and Health check of the new site.