Sobhy Mankarious, Project Manager

Sobhy Mankarious

Project Manager

Kuwait Gypsum Manufacturing & Trading Co. (K.C.S.C) , Kuwait

Location
Kuwait - Al Kuwait
Education
Bachelor's degree, Architectural engineering
Experience
46 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :46 years, 10 Months

Project Manager at Kuwait Gypsum Manufacturing & Trading Co. (K.C.S.C) , Kuwait
  • Kuwait - Al Kuwait
  • My current job since October 2013

Title: Project Manager.
Duties:
- Construction and maintenance of “College of Science” and the faculty of “Club Saba Al-Salem University City, Kuwait University”.
- Design, supply, installation, testing, warranty and maintenance of gypsum board assemblies works (Various types of ceilings partitions).

Projects Manager at Al Marwad Int. Gen. Trad. & Cont. W.L.L, Kuwait
  • Kuwait - Al Kuwait
  • December 2011 to September 2013

Title: Projects Manager/Coordinator.
Duties:
- Pre-cast yard factory Project for Gamal Abdel Nasser Bridge in Doha (all civil works). The main contractor is Rizani (OHL) Italian company.
- Dewatering system for Gamal Abdel Nasser Foundation.
- Ahmadiah Project, installation of sanitary manhole, excavation and backfilling of fresh water pipelines project.
- KNPC, workmanship of civil works for NLTF project. The main contractor is HOT Engineering Company.

Project Manager at First Kuwaiti Trading and Contracting Co., Kuwait
  • Kuwait - Al Kuwait
  • July 2010 to December 2011

Project Manager. \n \nDescription: \n•Working as Project Manager for Residential Building at Salmyah Plot #51 project. The project is a building consists of 25 floors with basement area 1001 m2 and the estimated cost is about 15 Million U.S. Dollars.

Project Manager at First Kuwaiti Trading and Contracting Co., Kuwait
  • Kuwait - Al Kuwait
  • July 2009 to December 2011

Project Manager. \n \nDescription: \n•Working as Project Manager for Dasman Residential Building project. The project is a building consists of 15 floors with basement area 1000 m2 and the estimated cost is about 11 Million U.S. Dollars.

Project Engineer. at First Kuwaiti Trading and Contracting Co., Kuwait
  • Kuwait - Al Kuwait
  • February 2009 to July 2009

Description:
•Working as Project Engineer on the architectural work of the Legal Advice Legislation Headquarter project, Ministry of Public Works, State of Kuwait. The project is a building consists of 18 floors with landscape area 8000 m2 and the estimated cost is about 57 Million U.S. Dollars.

Project Engineer. at First Kuwaiti Trading and Contracting Co., Kuwait
  • Kuwait - Al Kuwait
  • September 2007 to February 2009

Project Engineer.

Description:
•Working as Project Engineer on Construction and Maintenance of 05 Nos. R.C. Ground Reservoirs for Fresh Water (55 M.I.G. Capacity Each) Ministry of Electricity and Water, State of Kuwait at Azzour, North Area, Kuwait. The project has an area of 150 Feddans and the estimated cost is about 100 Million U.S. Dollars.

Consultant Engineer. at Private Work
  • Egypt - Cairo
  • January 2004 to August 2007

Private Work
Consultant Engineer.

Description:
• Working as a consultant engineer in private projects.

Resident Engineer at Arab Consulting Engineers in association with AMBRIC (American British Consultants)
  • Egypt - Cairo
  • April 2002 to December 2003

Resident Engineer.

Description:
• Worked on Contract 16-2 of Gabal El Asfar Wastewater Treatment Plant of the (REHABILITATION AND EXPANSION OF THE GREATER CAIRO WASTEWATER PROJECT) The project will treat about one million m3/day, the area of the site is about 500 Feddans and the costs is about L.E. 1200 Million .

Resident Engineer. at Arab Consulting Engineers
  • Egypt - Cairo
  • October 2000 to March 2002

Resident Engineer.

Description:
• Worked on EL Nasaym Village Project at 6th of October city.
• Area of site 250 Ferddans.
• Cost is about LE 440 million.
Duties:
• Supervision including:
o Meetings.
o Reports.

o Inspection and construction of major structures of civil and architectural finishing works such as: 6 towers (22 floor, each floor contains 8 apartments, left slab form), 150 unit (each unit contains 4 villas). Mall (including cinema, restaurants…etc), swimming pools, networks, parking and landscape.

Assistant Resident Engineer. at Arab Consulting Engineers in association with AMBRIC (American British Consultants)
  • Egypt - Cairo
  • March 1992 to September 2000

Assistant Resident Engineer.

Description:
• Worked on Contract 16-2 of Gabal El Asfar Wastewater Treatment Plant of the (REHABILITATION AND EXPANSION OF THE GREATER CAIRO WASTEWATER PROJECT) The project will treat about one million m3/day, the area of the site is about 500 Feddans and the costs is about L.E. 1200 Million .



Duties:
• Supervision including recovered keeping, daily, weekly and monthly reports, inspection of construction of major structures such as:
o Primary Sedimentation, Aeration, Final Clarifiers, Chlorine contact & Sludge thickening tanks.
o Primary sludge, Return Activated sludge, Waste Activated Sludge, Drainage and chlorinated effluent pumping stations.
o Distribution, Activated Sludge mixing, primary sedimentation sludge, Activated sludge draw off, Transition, Sludge Force main Valve, Blending and Dilution chambers.
o Aeration, Chlorination Plant sub stations.
o Feed Culverts, Effluent, Influent, sludge sewage and works By-Pass channels.
o Chlorine House.
o Piles.
o Water Tests.
o Electrical draw pits, cable ducts and High Masts.
o Gravity and pressure Pipe lines, Manholes and Chambers up to 2000 mm diameter of various materials including pre-stressed, Concrete, reinforced concrete, Vitrified clay, ductile iron and galvanized mild steel.
o Dewatering systems.
o Gatehouses and Fences.
o Architectural Finishing works.
o Landscaping.
o Roads.
o Agriculture and irrigation network.

Senior Site Engineer at Arab Consulting Engineers in association with AMBRIC (American British Consultants).
  • Egypt - Cairo
  • August 1989 to February 1992

Senior Site Engineer

Description:
Worked on Contract 9 Kossous Pumping Station of the (Rehabilitation and Expansion of the Greater Cairo Wastewater System) the project will pump about 500, 000 m3 /day, the area of the site is about 25 feddans and coast is about L.E. 75 million.

Duties:
• Included the supervision of construction and personal supervision of all the Architectural finishing works for the site which comprising the following structures:
o Feed culvert and reception chambers including blue brick lining.
o Overflow channel of stone pitching.
o Screw pumping station and PVC lining.
o Standby generating station.
o Transfer pumping station control building.
o Distribution sub-station.
o Administration building.
o Gatehouse.
o Force main and gravity pipelines.
o Boundary wall.
o Landscaping and Roads.
o Electrical High mast foundation.

The main civil items include:
• Excavation.
• Dewatering.
• Plan and reinforced concrete.
• Wooden and steel form works (shuttering).
• Steel reinforcement- blue bricks and P.V.C lining.
• Insulation.
• Back filling.
• Asphalt of roads.
• Quality control.
The main Architectural Finishing items include:
• Masonry.
• Plastering.
• Tilling (Floors and Walls).
• Sanitary (Plumping).
• Marble.
• Wooden, Aluminium and steel works.
• Painting.
• False (ceiling and floor).

Site Engineer at Arab Consultants Engineers in association with SOFRETU (French consultants).
  • Egypt - Cairo
  • May 1985 to July 1989

Site Engineer

Description:
Worked on phase I and II of (GREATER CAIRO REGIONAL UNDER GROUND METRO LINE PROJECT HELWAN - EL MEARG) the length of the line is about 44 km (4.5 km under ground including 5 stations), coast is about L.E. 1000 million).

Duties:
• Included supervision of civil work for construction of:
o Gamal Abd El Naser Station.
o Ourabi Station.
o Electrical Station.
o Part of tunnel body.
o Central air-conditioning building for Abd El Naser and Ourabi stations.

Duties of the site Engineer included general supervision of:

• Diversion of public utilities (Electricity, Sewage, Gas & Telephone).
• Main civil works including: Excavation works, soil works, reinforced concrete works, quality control, formwork, water tightness, backfilling & asphalting roads.

Duties of the site Engineer included personal supervision of Architectural finishing works for construction of the following sites:
• PHASE I
o Gamal Abd El Naser station.
o Central Air-Conditioning station for Gamal Abd El Naser and Ourabi stations.
o Dar El Salam station.

• PHASE II
o El Marge station.
o Turra workshops.

The main Architectural-finishing works included:
• Masonry, tiling (walls & floors), coating, painting, plumbing, metal and wood works, signs, ceiling flocking (sound & fire proofing), false (ceilings & floors), marble and fibre glass panel cladding, lighting & asphalt flooring.
• Execution of the Civil and Architectural finishing works took place in accordance with the most recent methods.
• Checking of monthly certificates for all trades.
• Checking of as built drawings and documents concerning the works.
• Checking of final measurements for civil and Architectural finishing works.

Site Engineer at Arab Consultants Engineers.
  • Egypt - Cairo
  • May 1984 to April 1985

Site Engineer

Description:
• AGOUZA RESIDENTIAL COMPLEX PROJECT (Eight Towers) including 84 villas, coast is about L.E. 10 million.
• Supervision of construction for main Architectural finishing works including: Masonry, tiling (walls & floors), coating-painting, plumbing, marble, metal and wood works & false ceiling and Aluminium works.

Site Engineer at Arab Consulting Engineers in association with H.K.Ferguson (American consultants).
  • Egypt - Cairo
  • March 1979 to April 1984

Site Engineer

Description:
• SUEZ CEMENT FACTORY PROJECT the area of the site is about (285 feddans), the project will produce one million ton/year, coast is about $ US 40 million.

• Personal supervision of construction of the Civil and Architectural finishing works for the following buildings:
o Gatehouse & boundary fence.
o Permit building.
o Restaurant and canteen building.
o Administration building.
o Chemical laboratory building and control room building.
o Garage building.
o Workshop building.
o Electrical station.
o General stores building.

Participated in the supervision of construction for the civil works of:
• Chimney (slip form).
• Cement silos (slip form).
• Mixing silos (slip form).
• Clinker silos (slip form).
• Electrical cable tunnel.
• Lighting poles.
• Water tanks.
• Roads.
• Landscaping.

Personal checking of as built drawings for the project:
• Preliminary and final handing over of all the buildings, concerning the architectural finishing works.

Site Engineer at H&H Construction Company
  • Egypt - Cairo
  • June 1977 to February 1979

Site Engineer

Description:
• Worked on Cairo Plaza Towers (Nile View).
• Cost is about $ 50 million.
• Two towers (36 floors each, left slab form).

Education

Bachelor's degree, Architectural engineering
  • at B.SC in ARCHITECTURAL ENGINEERING, HELWAN UNIVERSITY, JUNE 1977.
  • June 1977

Specialties & Skills

Civil Engineering
Planning
Construction & Property
Architecture
Project Management
Project Management

Languages

Arabic
Expert
English
Intermediate