SONNY PINGUE, Qa/qc Civil Engineer

SONNY PINGUE

Qa/qc Civil Engineer

SAFARI COMPANY

Location
Philippines
Education
High school or equivalent, Civil Engineering
Experience
23 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 11 Months

Qa/qc Civil Engineer at SAFARI COMPANY
  • Saudi Arabia - Jizan
  • My current job since April 2019

Position: QA/QC Civil Engineer
Project: New Jazan International Airport
Owner: GACA / CLUSTER 2
Consultant: Saudi Diyar Consultant / Euro Consult
Location: Jizan, KSA

This airport will be located near Jizan Economic City in Saudi Arabia and have capacity to handle 2.4 million passengers a year. Construction of King Abdullah Bin Abdulaziz Airport comprising a three-storey passenger terminal, a control tower, air cargo zones and other facilities. Scope of work includes construction of: - An air traffic control tower - A hangar - Air cargo zones - Fire extinguishing and rescue buildings - Maintenance buildings - Service facilities - 10 gates and a VIP lounge Design of the airport.

Responsibilities / Duties :

 Prepare and monitor the implementation of Method Statements & ITP to ensure all works are compliance with requirements, and that all necessary quality records are generated in a timely & correct manner (concrete design mix, specification & standards).
 Monitor and Inspect soil and ground improvement work activity from earthworks, stone column, and rapid dynamic or impact compaction.
 Monitor and Inspect concrete works activity (Bridge, Buildings & bored pile work).
 Review, submit & monitor all third-party laboratory test report for ground improvement work (FDT, Plate Load Test, & Pre / Post CPT) to the Consultant.
 Coordinate and witness all material test (soil, coarse aggregates, concrete material (fresh & harden, asphalt) with 3rd party on site and laboratory.
 Review, submit & monitor all material test report to the consultant (soil, fresh & harden concrete, reinforcement steel & others).
 Prepare work inspection request, & material inspection request and others.
 Prepare & perform any task given by the QA/QC Manager.

QA/QC Engineer at Joannou & Paraskevaides, J&P Saudi Arabia
  • Saudi Arabia - Tabouk
  • January 2018 to December 2018

Position: QA/QC Engineer
Project: Custodian of Two Holy Mosques King Abdullah Bin Abdul Aziz Project for Development of Security Facilities, Phase 2E (KAP2E-8), Kingdom of Saudi Arabia
Owner: Ministry of Interior
Consultant: NKY
Location: Tabuk, KSA
The construction of the project of the Custodian of the Two Holly Mosques King Abdullah Bin Abdul Aziz for the development of Security headquarters. Residential Building (Tunneling System) and Villas, out of these commercial facilities such as Mosque and other facilities; the project value was 881 Million USD.
 Liaise and coordinate with Independent Testing Laboratory, and 3rd Party Inspection Company (where employed) at site.
 Monitor the implementation of Method Statements and ensure all works are compliance with requirements, and that all necessary quality records are generated in a timely manner for all works in their area of assigned responsibility.
 Assist, where required, a Team in undertaking periodic Internal or External audits, in particular technical audits in their field of specialization.
 Liaise with Consultant in matters pertaining to Inspection, and Quality check for materials and Installation.
 Responsible for the effective and efficient document control of all engineering documents, in accordance with the established procedures.
 Check or Coordinates to Surveyor Team all Levels and Coordinates are correct and asper latest approved drawing.
 Monitoring the installation works prior to submission for inspection and advising of any deviation from the specification and approved drawing .
 Documenting all inspection and test on pro-formas as required by the Project Quality Plan and Contract specification.

QA/QC Engineer at Joannou & Paraskevaides
  • Saudi Arabia
  • January 2014 to December 2017

Position: QA/QC Engineer
Project: Al Waseel Hills Project
Client: SABIC
Consultant: SABIC
Location: Riyadh, KSA

Construction of Phase 1 of a residential community for SABIC employees in Riyadh area. Work includes construction of 623nos. villas, 5no. apartment blocks of total 62nos. apartments, and a number of community and commercial facilities such as market, mosques, schools, clubhouses, various male and female recreation areas and integrated parks and plazas. The residential buildings will be built to achieve LEED Silver ratings under the LEED for Homes rating system from USGBC, USA. In addition to the construction of the buildings and structures, Scope of Work includes construction of the perimeter retaining walls, sewer treatment plant, water treatment plant, main access road and wadi bridges (vehicular & pedestrian), secondary bridges & culverts, as well as all infrastructure, hard and soft landscaping works in Phase 1 area.

Responsibilities / Duties :

 Liaise and coordinate with Independent Testing Laboratory, and 3rd Party Inspection Company (where employed) at site.
 Monitor the implementation of Method Statements and ensure all works are compliance with requirements, and that all necessary quality records are generated in a timely manner for all works in their area of assigned responsibility.
 Assist, where required, a Team in undertaking periodic Internal or External audits, in particular technical audits in their field of specialization.
 Liaise with Consultant in matters pertaining to Inspection, and Quality check for materials and Installation.
 Responsible for the effective and efficient document control of all engineering documents, in accordance with the established procedures.
 Check or Coordinates to Surveyor Team all Levels and Coordinates are correct and asper latest approved drawing.
 Monitoring the installation works prior to submission for inspection and advising of any deviation from the specification and approved drawing .
 Documenting all inspection and test on pro-formas as required by the Project Quality Plan and Contract specification.
 Conduct snagging/punch list to Handing-over of completed works

QA/QC Engineer at Joannou & Paraskevaides, J&P Saudi Arabia
  • Saudi Arabia - Riyadh
  • October 2011 to December 2014

Position: QA/QC Engineer
Project: ITCC 17 PARCELS
Client: RAYADA INVESTMENT COMPANY
Consultant: Zuhair Fayez Partnership Consultant
Location: Riyadh, KSA

17 No. Buildings with a total floor area of 435, 000m2 under EPC. With a value of USD 542 million.


Responsibilities / Duties :

 Liaise and coordinate with Independent Testing Laboratory, and 3rd Party Inspection Company (where employed) at site.
 Monitor the implementation of Method Statements and ensure all works are compliance with requirements, and that all necessary quality records are generated in a timely manner for all works in their area of assigned responsibility.
 Assist, where required, a Team in undertaking periodic Internal or External audits, in particular technical audits in their field of specialization.
 Liaise with Consultant in matters pertaining to Inspection, and Quality check for materials and Installation.
 Responsible for the effective and efficient document control of all engineering documents, in accordance with the established procedures.
 Check or Coordinates to Surveyor Team all Levels and Coordinates are correct and asper latest approved drawing.
 Monitoring the installation works prior to submission for inspection and advising of any deviation from the specification and approved drawing .
 Documenting all inspection and test on pro-formas as required by the Project Quality Plan and Contract specification.

QA Production Site Engineer at LBCD (Odebrecht & Libyan Partner JV)
  • Libya - Tripoli
  • June 2009 to March 2011

Position: Production / Site Engineer
Project: Tripoli Third Ring Road

Client: Housing and Infrastructure Board
Location: Tripoli, Libya

Three traffic lanes per each carriageway and approximately 24 km extension. Including Underpass, Overpass, Underground Utilities and Embankment.

Responsibilities / Duties :

 Review / Understand approved shop drawings and implement into works.
 Communicate in clear, concise manner the current progress of the works to the top management.
 Coordinate with other work discipline.
 Collaborate with cost control and planning department in preparing the daily progress reports.
 Ensure the timely completion of work and that the work is being carried out as per company standards and safety procedure.
 Supervise the subcontractor works and day today activities of the assigned work.
 Lead site personnel to execute and completion of job on time at site.
 Supervise work activity at precast area during night shift.
 Precast Production of manhole & basin for underground utilities, and deck slab for bridges
 Laying and full sealant of precast box culvert at site (3 m. X 3 m.)

QC Engineer at SUNGWON
  • United Arab Emirates
  • August 2008 to February 2009

Position: QC Engineer
Project: The Cube Hotel and Residence

Client: BMG Middle East Development
Location: Dubai, UAE

Construction of 5-star 26-storey Hotel Apartment building. Feature 1, 2 and 3 bedroom apartment as well as studios.

Responsibilities / Duties :

 Handled and Coordinates all shop drawing
 Monitor and prepare reports for materials and work progress
 Prepare and submit WIR to the consultant.
 Conduct Inspect with consultant rebar setting and formwork prior to concrete.
 Prepare document for quality control for materials and shop drawings.
 Perform and coordinates all approved elevations and coordinate to the surveyor
 Witness 3rd party laboratory for material test with consultant.
 Supervision during concrete work activity

Laboratory Technician at Saudi Ready Mix Concrete Company
  • Saudi Arabia
  • November 2005 to January 2008

Project: Concrete Ready Mix Supplier
Owner: Khalid Ali Alturki & Sons Holding Company (Alturki Holding

Draftsman / Office Engineer at Design Science Inc. in Association with Renardet S.A. (Consultant)-
  • Philippines - Quezon
  • September 1998 to August 2005

Position: Draftsman / Office Engineer
Project: Sixth ADB Road Project
Client: DPWH
Location: Qeuzon, Philippines
Sixth ADB Road Project; Road Improvements and Rehabilitation, Contract Package 6L - 5 Macalelon - Mulanay Road Project Quezon Province Philippines


Responsibilities / Duties :

 Check & review shop drawing submitted by the contractor.
 Drafting works for Topographic survey, plan & profile, cross-section, drainage design and other plan for the project.
 Calculate and prepare drawing for the proposed road design alignment and elevation.
 Calculate, investigate and prepare drawing for the proposed drainage system box culvert, reinforced concrete pipe culvert and open channel.
 Assist Quantity Engineer in checking all quantity computation for billing of the contractor.
 Conduct field inspection on site.
 Perform survey works.
 Witness FDT on site.
 Prepare Monthly Report
 Assist the Chief Resident Engineer on site and office.

Education

High school or equivalent, Civil Engineering
  • at Elementary School SMES
  • January 1988

College Degree MSEUF

Bachelor's degree, Civil Engineering
  • at Elementary School SMES
  • January 1988

College Degree MSEUF

Specialties & Skills

Civilian
Civil Engineering
CONSULTING
MATERIALS MANAGEMENT
MICROSOFT WORKS
QUALITY
QUALITY CONTROL
SPECIFICATION
CUSTOMER RELATIONS
BRIDGES

Languages

English
Expert
Arabic
Beginner
Filipino
Native Speaker