Total Years of Experience: 19 Years, 9 Months
March 2023
To Present
Senior HSE Engineer
at Al Firas
Location :
United Arab Emirates - Abu Dhabi
December 2022
To February 2023
HSE Officer
at BADER AL MULLA AND BROTHERS
Location :
Kuwait - Al Ahmadi
EQUATE TURN AROUND 2023
August 2020
To February 2021
HSE Manager
at Acetech Heavy Fab
Location :
India - Chennai
March 2018
To February 2020
Construction Specialist (Safety)
at Jacobs
Location :
Kuwait - Al Jahra
Scope/Description:
The Salmi expansion project consists of main components like:
Total Road length approx.: 49.9 km - upgradation from 2 lane, 3 lane & 4 lanes.
Road length /Lane, 4 Lanes-34.4 km, 3 lanes- 4.9 km & 2 lanes -10.7 km.
Total area -779880 m. sq.
Construction of 4 intersections (IC 82 (3 levels), IC 87, IC 92, & IC 98
Construction of 3 Bridges (P1, R1 & Railway Crossing Bridge)
Construction and maintenance of the Temporary detours.
Road marking, signages, Speed cameras, gantry signage, NJ Barrier, MSE walls, Street lighting, construction of water pipelines, storm water drainage, Telephone networks etc...
The Salmi expansion project consists of main components like:
Total Road length approx.: 49.9 km - upgradation from 2 lane, 3 lane & 4 lanes.
Road length /Lane, 4 Lanes-34.4 km, 3 lanes- 4.9 km & 2 lanes -10.7 km.
Total area -779880 m. sq.
Construction of 4 intersections (IC 82 (3 levels), IC 87, IC 92, & IC 98
Construction of 3 Bridges (P1, R1 & Railway Crossing Bridge)
Construction and maintenance of the Temporary detours.
Road marking, signages, Speed cameras, gantry signage, NJ Barrier, MSE walls, Street lighting, construction of water pipelines, storm water drainage, Telephone networks etc...
July 2017
To February 2018
Health, Safety & Environment Officer
at KCPC Contracting Company
Location :
Kuwait - As Salimiyah
Project: RA/222, Salmiya, Construction, Completion and Maintenance of Bridge
& Other Services at Gulf Street on Al-Bidda Roundabout.
* Client: Ministry of Public works, Kuwait
Mushrif Trading &
& Other Services at Gulf Street on Al-Bidda Roundabout.
* Client: Ministry of Public works, Kuwait
Mushrif Trading &
May 2016
To April 2017
Senior Health, Safety & Environment Officer
at Mushrif Trading & Contracting Company
Location :
Kuwait - As Salimiyah
RA/222, Salmiya, Construction, Completion and Maintenance of Bridge & Other Services at Gulf Street on Al-Bidda Roundabout.
Client: Public Authority for Roads and Transport (PART) Ministry of Public works, Kuwait.
Client: Public Authority for Roads and Transport (PART) Ministry of Public works, Kuwait.
June 2013
To April 2016
Senior Safety Officer
at Mushrif Trading & Contracting Company
Location :
Kuwait
Project: Flow line Replacement and General support for Production Operation
JO/SC/302 - PO 11
* Client: Joint Operations, Wafra, Neutral Zone Kuwait (KGOC & Saudi Arabian
Chevron
Scope/Description:
Flow lines maintenances includes installation of new flow lines (6” & 4” TK 236 Pipes, Trunk lines) replacing of well drops (Live crude to Main Gathering Centre’s).
Installation of Commingle points, well shutdown, partial re-routing, preparing temporary production headers while sub centre’s may be in renovations etc.
Installation of valves drain spool and replacement of Gas lines (sand phase).
Commissioning of new sub centre’s (Gathering Centre’s) erection of Manifolds, Separator’s, drop lines, Travel piece etc.
Major shutdowns like up gradation in Sub centres, Maintenances, satellite manifold upgradation, trunk line rerouting etc.
JO/SC/302 - PO 11
* Client: Joint Operations, Wafra, Neutral Zone Kuwait (KGOC & Saudi Arabian
Chevron
Scope/Description:
Flow lines maintenances includes installation of new flow lines (6” & 4” TK 236 Pipes, Trunk lines) replacing of well drops (Live crude to Main Gathering Centre’s).
Installation of Commingle points, well shutdown, partial re-routing, preparing temporary production headers while sub centre’s may be in renovations etc.
Installation of valves drain spool and replacement of Gas lines (sand phase).
Commissioning of new sub centre’s (Gathering Centre’s) erection of Manifolds, Separator’s, drop lines, Travel piece etc.
Major shutdowns like up gradation in Sub centres, Maintenances, satellite manifold upgradation, trunk line rerouting etc.
November 2012
To May 2013
Senior Health, Safety & Environment Officer
at Mushrif Trading & Contracting Company
Location :
Kuwait - Al Farawaniyah
Project : Construction, completion and maintenance of a remote monitoring &
control centre, for the facilities of sewage network in Kuwait
• Implementation of HSE Policies & Plans.
• Review Contractual documents related to the scope and other HSE related to the Project Management.
• Review & approve of contractor HSE plan, Method statements, Hazard identification and risk Assessment based on activities.
• Coordinate with the Client, Consultant & Contractor Key employees for the improvement and development of the Project.
• Training all Contractor and other employees to report near miss & incident for necessary investigation and identify with root cause to eliminate such hazards in the work place (CAPA).
• Provision of safe work procedures and ensure its compliance with contractor and visitors.
• Prepare and implementation of emergency response procedure and emergency team (ERT) for the project.
• Train staff /employees to respond during emergencies and evacuation drill
• HSE statutory and legal compliance are in place and periodically updated.
• Employees undergo periodical HSE trainings based on the work nature.
• Permit to work system is in place.
• Report Project HSE Statistics to the HSE Manager.
control centre, for the facilities of sewage network in Kuwait
• Implementation of HSE Policies & Plans.
• Review Contractual documents related to the scope and other HSE related to the Project Management.
• Review & approve of contractor HSE plan, Method statements, Hazard identification and risk Assessment based on activities.
• Coordinate with the Client, Consultant & Contractor Key employees for the improvement and development of the Project.
• Training all Contractor and other employees to report near miss & incident for necessary investigation and identify with root cause to eliminate such hazards in the work place (CAPA).
• Provision of safe work procedures and ensure its compliance with contractor and visitors.
• Prepare and implementation of emergency response procedure and emergency team (ERT) for the project.
• Train staff /employees to respond during emergencies and evacuation drill
• HSE statutory and legal compliance are in place and periodically updated.
• Employees undergo periodical HSE trainings based on the work nature.
• Permit to work system is in place.
• Report Project HSE Statistics to the HSE Manager.
August 2010
To October 2012
Project Safety Manager
at Mushrif Trading & Contracting Company
Location :
Kuwait - Al Jahra
Responsibilities include:
1. Review and Submit HSE Documents like HSE Plan, Policy, HIRA and SOP to Client and receive the approval.
2. Review and submit Traffic Management Plan for Necessary Diversion during construction of road and bridges.
3. Co ordinate with approved contractor for the provision of Road marking, installation of Studds, Guard railing, gantry sign board erection, installation of Signage etc.
4. Coordinate with Traffic Department for necessary Detour Drawing and Approval.
1. Review and Submit HSE Documents like HSE Plan, Policy, HIRA and SOP to Client and receive the approval.
2. Review and submit Traffic Management Plan for Necessary Diversion during construction of road and bridges.
3. Co ordinate with approved contractor for the provision of Road marking, installation of Studds, Guard railing, gantry sign board erection, installation of Signage etc.
4. Coordinate with Traffic Department for necessary Detour Drawing and Approval.
April 2008
To July 2010
Health, Safety & Environment Lead
at Mushrif Trading & Contracting Company
Location :
Kuwait - Al Jahra
Process and non-process Buildings,
Transmission Line,
Twin lines,
Over Head Lines,
Guard House,
Main Pumping- Station (Jahra).
Transmission Line,
Twin lines,
Over Head Lines,
Guard House,
Main Pumping- Station (Jahra).
March 2008
To April 2008
Health, Safety & Environment Officer
at Mushrif Trading & Contracting Company
Location :
Kuwait - Al Fintas
Construction of North and South Buildings (2), Culvert Area, Boat House.
April 2007
To February 2008
Health, Safety & Environment Officer
at Mushrif Trading & Contracting Company
Location :
Kuwait - Al Ahmadi
Dow- PIC olefins II Project, Seawater Cooling Tower
(SCT 06-001 /OL2K) Kuwait.
RESPONSIBILITIES
* Implementation of HSE policies & plans.
* Review Contractual documents related to the scope and other HSE related to the Project Management.
* Review & approve of contractor HSE plan, Method statements, Hazard identification and risk Assessment based on activities.
* Coordinate with the client, Consultant & Contractor Key employees for the
improvement and development of the Project.
* Training all Contractor and other employees to report near miss & incident for necessary investigation and identify with root cause to eliminate such hazards in the work place (CAPA).
* Provision of safe work procedures and ensure its compliance with contractor and visitors.
* Prepare and implementation of emergency response procedure and emergency team (ERT) for the project.
* Train staff /employees to respond during emergencies and evacuation drill
* HSE statutory and legal compliance are in place and periodically updated.
* Employees undergo periodical HSE trainings based on the work nature.
* Permit to work system is in place.
* Report HSE Statistic for the Board Members and Management.
(SCT 06-001 /OL2K) Kuwait.
RESPONSIBILITIES
* Implementation of HSE policies & plans.
* Review Contractual documents related to the scope and other HSE related to the Project Management.
* Review & approve of contractor HSE plan, Method statements, Hazard identification and risk Assessment based on activities.
* Coordinate with the client, Consultant & Contractor Key employees for the
improvement and development of the Project.
* Training all Contractor and other employees to report near miss & incident for necessary investigation and identify with root cause to eliminate such hazards in the work place (CAPA).
* Provision of safe work procedures and ensure its compliance with contractor and visitors.
* Prepare and implementation of emergency response procedure and emergency team (ERT) for the project.
* Train staff /employees to respond during emergencies and evacuation drill
* HSE statutory and legal compliance are in place and periodically updated.
* Employees undergo periodical HSE trainings based on the work nature.
* Permit to work system is in place.
* Report HSE Statistic for the Board Members and Management.
January 2005
To October 2006
Social Compliance officer
at Al Khat Packaging
Location :
Kuwait - Al Farawaniyah
Responsibilities include:
• Preparing all the Hazards and critical control points
• Check for the positive approach and results.
• Graded A continuously for 2 years from the External Audit Personnel from Europe for maintaining high standards & documentation.
• Monthly Meeting and training towards occupational safety and health, for both old and fresh candidates.
• Develop committee members, organizing and discussed on various polluting hazards, Chemicals, sewage and other normal wastages.
• Recycle option was suggested in particular area’s where it was applicable to save energy and source.
• Maintaining the facility with various Internal & External audit’s and to stay update with all related issues towards Safety and Hygiene.
• Preparing all the Hazards and critical control points
• Check for the positive approach and results.
• Graded A continuously for 2 years from the External Audit Personnel from Europe for maintaining high standards & documentation.
• Monthly Meeting and training towards occupational safety and health, for both old and fresh candidates.
• Develop committee members, organizing and discussed on various polluting hazards, Chemicals, sewage and other normal wastages.
• Recycle option was suggested in particular area’s where it was applicable to save energy and source.
• Maintaining the facility with various Internal & External audit’s and to stay update with all related issues towards Safety and Hygiene.
January 2004
To December 2004
Graphic Designer
at Al Khat Packaging
Location :
Kuwait
May 2001
To September 2003
System Engineer
at Simos Pheripherals Pvt ltd.
Location :
India - Chennai
Share on Facebook
Share on Twitter
Share Via Email