Total Years of Experience: 18 Years, 8 Months
July 2005
To Present
c.o.o
at deep homes and construction ltd
Location :
India - Mumbai
Leading the Project with planned construction of 9.5 L SFT of residential & commercial. Out of 9 L SFT of Residential, 1 L SFT fully completed and handed over to customers.
Got clearance for the project that was rejected by SEAC2 under the pretext that the ground coverage is more than 50% by presenting a detailed statement collected from various Minutes Of meetings that the committee approved so many projects of more than 50% ground coverage& a detailed disaster management plan to Authorities.
Achieved construction of parking space for over 500 cars (mechanical car parking), UG Water Tank, FFTG Tanks, STP within space constraint by ensuring right design and space planning.
Construction done by creating design mix using G.G.B.S thereby reducing the cement component to tune of 30% achieving costs saving of total 10% of the cement consumption approximately INR 30 million.
Led completion of Project Quality Policy to ensure Construction Quality.
Cost savings achieved by use of readymade steel instead of conventional reinforcement. 10% of the total reinforcement used in project approximately 100 metric tons about INR 3 MN.
Led project under planned construction of more than 12 lac SFT of residential construction ranging from G+7 to G+30 structures and 3 lakh sft of commercial buildings of G+7 and a resort namely ‘Chokhi Dhani’ in the model of heritage village structure.
Completed Mahindra Renault showroom with a built up area of 60thousand SFT and the span between the columns of more than 12m in a record period of 65 days.
Installed 2 STP plants of 250 cubic meter and a 350 cubic meter using MMBR technology for the first time in Thane area.
Led design team to give ethnical look for the ‘Chokhi Dhani’ resort in local Rajasthan style.
Saved cement consumption by 10% and reduced plastering duration by 65 days by using ready-mix plaster giving due consideration to the quality of the sand, and the workmanship.
Implemented stringent quality system to ensure the project quality
Won Absolute Quality award, Best safe zone award, Best Space planning Award and Best Engineer award by Artist in Concrete in collaboration with Indian Express for the year 2008. As a feather in the cap, won the National Level Best Engineer award in 2011.
Got clearance for the project that was rejected by SEAC2 under the pretext that the ground coverage is more than 50% by presenting a detailed statement collected from various Minutes Of meetings that the committee approved so many projects of more than 50% ground coverage& a detailed disaster management plan to Authorities.
Achieved construction of parking space for over 500 cars (mechanical car parking), UG Water Tank, FFTG Tanks, STP within space constraint by ensuring right design and space planning.
Construction done by creating design mix using G.G.B.S thereby reducing the cement component to tune of 30% achieving costs saving of total 10% of the cement consumption approximately INR 30 million.
Led completion of Project Quality Policy to ensure Construction Quality.
Cost savings achieved by use of readymade steel instead of conventional reinforcement. 10% of the total reinforcement used in project approximately 100 metric tons about INR 3 MN.
Led project under planned construction of more than 12 lac SFT of residential construction ranging from G+7 to G+30 structures and 3 lakh sft of commercial buildings of G+7 and a resort namely ‘Chokhi Dhani’ in the model of heritage village structure.
Completed Mahindra Renault showroom with a built up area of 60thousand SFT and the span between the columns of more than 12m in a record period of 65 days.
Installed 2 STP plants of 250 cubic meter and a 350 cubic meter using MMBR technology for the first time in Thane area.
Led design team to give ethnical look for the ‘Chokhi Dhani’ resort in local Rajasthan style.
Saved cement consumption by 10% and reduced plastering duration by 65 days by using ready-mix plaster giving due consideration to the quality of the sand, and the workmanship.
Implemented stringent quality system to ensure the project quality
Won Absolute Quality award, Best safe zone award, Best Space planning Award and Best Engineer award by Artist in Concrete in collaboration with Indian Express for the year 2008. As a feather in the cap, won the National Level Best Engineer award in 2011.