Suresh kotha, Site Engineer

Suresh kotha

Site Engineer

hilalco

Location
United Arab Emirates - Al Ain
Education
Bachelor's degree, Civil Engineering
Experience
23 years, 7 months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 7 months

Site Engineer at hilalco
  • United Arab Emirates - Al Ain
  • My current job since October 2007

• Planning for the Material and Man power resources for the work, well in advance and having cost control over the wastage of men and materials
• Inspect the site activities (Road works, Pipe lineworks & Irrigation pumping station) to varify compliance to the project quality require
• Maintaining the Daily Man power Report and Daily Productivity report for the ongoing works
• Undertake regular site supervision, inspection, and quality assurance visits.
• Working with Quality Control Engineers, facilitate the smooth and expeditious resolution of any project design, materials or construction issues with the Consultant.
• Monitoring and reporting the progress the concerned clients and archiving the records so as to get the assurance of Quality of works, and business good will.
• Inspection of Pipe lines of different services after final installation as per approved DEWA standard details and specifications.
• Attend periodic meetings with the consultant and client to discuss the quality issues and to ensure that the construction activities are performed in accordance with the project requirements.
• Inspection of casting the approved element as per Project Specs requirements.
• Reviewing shop drawings related to structural members.
• Reviewing and following up the site clarification requests, RFI and RFIA
• Prepare monthly reports

Highway Engineer at SPAN Consultants Pvt Ltd
  • India - Bengaluru
  • June 2002 to July 2007

Responsible to the Team leader in providing assistance on Widening and Strengthening of existing Bilikere - Belur road (SH 57) from Km 92.00 to 127.00(package BB-3) in Karnataka. This project is funded by HUDCO.

• Work also includes monitoring of daily ongoing works and up keeping of daily records.
• Responsible for ensuring proper check on quantity and quality control of work being executed.
• Work also involved preparation of running account bills based on issued Bill of Quantities.
• All works are being executed to MOST/MORTH specifications.
• Chiefly responsible for maintaining the designed top levels of each layer of subgrade, GSB, WMM and BM for the length constructed thus far
• Checking & controlling the levels of reference bench marks.
• Strictly monitor the progress of work for timely completion of the project.
Supervision, scrutiny, approving the final setting out by the contractor
• Verification of contractor’s monthly estimates of the completed works & assisting the T L in the preparation of Interim Certificates.
• Progress monitoring.
• Keeping record of minutes of the weekly site meetings.
• Final inspection of works
• Verification of contractor’s statement at completion
• Compilation & verification of “As-Built drawings”.

Education

Bachelor's degree, Civil Engineering
  • at Karnatak University,Dharwad
  • June 1999

Specialties & Skills

Materials
Inspection
Preparation
Minutes
Planning

Languages

English
Expert