Total Years of Experience: 17 Years, 6 Months
May 2013
To Present
Integrated Network Access Lead
at Reliance Jio Infocomm Ltd
Location :
India
LTE 4G rollout and Maintenance
September 2011
To September 2012
FLE Engineer
at zte india pvt ltd
Location :
India - Nagpur
the Telecommunications sector as a BSS and Implementation engineer.
Having knowledge on both GSM (NOKIA) & CDMA (ZTE) BTS.
Working as a back office engineer provide TNMS & OSS support, alarm support knowledge about to login BSC, MUX, Router, .
Operation & Maintenance of Area including OSP & ISP, Circuit provisioning, planning for bandwidth as well as MAN ring Up-gradation.
Having Good knowledge on BSC & BSC MML, Worked on Site creation at BSC end at initial stage of project.
Working on different Transmission equipments like all NOKIA PDH, NOKIA FLEXI HYBRID, NEC (PDH & SDH ), TEJAS MUX, CERAGON, SIEMENS, NORTEL MUX, NORTEL DWDM, INTERCOM ISR & IDR.
Solution to Customer complaint, responsibility is to measure coverage samples & to do BH & ND optimization by antenna azimuth, tilt, antenna height.
Carrying out Plan events for Integration, Network Changes, Up-gradation, and Deletion of NE, Performance Improvement and Fault Managements. Maintain Network Reliability through implementation of preventive & corrective measures
Nortel OME 6500, 6130, 6110, 16XE, 4XE, 1XE, TN1C (having capacity STM 64, STM 16, STM4 & STM 1) installed, commissioning & integration.
Marconi 16XX & SMA 16EX commissioning & integration.
Fibcom 6235 installed, commissioning & integration.
Nortel DWDM, CPL installed, commissioning & integration
Troubleshooting of all SDH Equipment.
POI Testing of ILD/ NLD/ Switch / Transmission done with BSNL and other CMTO & co-ordination with Switch Engineers regarding E1 connectivity issues in POI’s.
Having knowledge on both GSM (NOKIA) & CDMA (ZTE) BTS.
Working as a back office engineer provide TNMS & OSS support, alarm support knowledge about to login BSC, MUX, Router, .
Operation & Maintenance of Area including OSP & ISP, Circuit provisioning, planning for bandwidth as well as MAN ring Up-gradation.
Having Good knowledge on BSC & BSC MML, Worked on Site creation at BSC end at initial stage of project.
Working on different Transmission equipments like all NOKIA PDH, NOKIA FLEXI HYBRID, NEC (PDH & SDH ), TEJAS MUX, CERAGON, SIEMENS, NORTEL MUX, NORTEL DWDM, INTERCOM ISR & IDR.
Solution to Customer complaint, responsibility is to measure coverage samples & to do BH & ND optimization by antenna azimuth, tilt, antenna height.
Carrying out Plan events for Integration, Network Changes, Up-gradation, and Deletion of NE, Performance Improvement and Fault Managements. Maintain Network Reliability through implementation of preventive & corrective measures
Nortel OME 6500, 6130, 6110, 16XE, 4XE, 1XE, TN1C (having capacity STM 64, STM 16, STM4 & STM 1) installed, commissioning & integration.
Marconi 16XX & SMA 16EX commissioning & integration.
Fibcom 6235 installed, commissioning & integration.
Nortel DWDM, CPL installed, commissioning & integration
Troubleshooting of all SDH Equipment.
POI Testing of ILD/ NLD/ Switch / Transmission done with BSNL and other CMTO & co-ordination with Switch Engineers regarding E1 connectivity issues in POI’s.
January 2010
To September 2011
BSS Engineer
at Nokia Siemens Networks (NSN)
Location :
India - Nashik
Responsible for Operation and Maintenance of BSC, BTS and TRANSMISSION and Troubleshoot Problems in Network.
Installation and testing & Trouble Shooting of Tejas (TJ100MC1 R4) SDH.
Worked on SDH -Tejas MUX and NEC, Ceragon MW equipments and Nokia Flexi Hybrid MW equipment.
Planning and implementation for Sites loop protection with SDH.
Maintaining the SDH data backup for entire cluster.
PCM planning to enhance network stability.
Installation, Integration & Commissioning of Nokia Ultra and Flexi BTS.
Trouble shooting of Nokia BTS.
Commissioning & Integration of Nokia & Siemens Microwave links.
Planning & implementation of preventive maintenance to avoid possible Breakdown.
Troubleshooting and maintenance of Nokia BSC 3i.
Planning & implementation of Rehoming of sites between 2 BSC’s.
Handling 120 Cell sites and 2 BSC’s in critical MSEB Area.
Clear the fluctuation cases, TRE (Node with error, RSL, and Frequency correction) cases, Quality Alarms (Block TRX, Channel Failures, VSWR etc.), PDH & SDH Visibility, LVLD & Segmentation activity of entire cluster also maintaining regular reports for the same.
Implementation of TRX addition & Removal of responsible sites & maintaining records.
Responsible for Realignment of Microwave antenna, commissioning of FIU 19, FIU 19E, making cross connections.
Responsible for traffic shifting on SDH, PDH equipment.
Responsible for SDH (NEC, TEJAS, and Nokia Flexi Hybrid) implementation wherever PDH link became full.
Installation and testing & Trouble Shooting of Tejas (TJ100MC1 R4) SDH.
Worked on SDH -Tejas MUX and NEC, Ceragon MW equipments and Nokia Flexi Hybrid MW equipment.
Planning and implementation for Sites loop protection with SDH.
Maintaining the SDH data backup for entire cluster.
PCM planning to enhance network stability.
Installation, Integration & Commissioning of Nokia Ultra and Flexi BTS.
Trouble shooting of Nokia BTS.
Commissioning & Integration of Nokia & Siemens Microwave links.
Planning & implementation of preventive maintenance to avoid possible Breakdown.
Troubleshooting and maintenance of Nokia BSC 3i.
Planning & implementation of Rehoming of sites between 2 BSC’s.
Handling 120 Cell sites and 2 BSC’s in critical MSEB Area.
Clear the fluctuation cases, TRE (Node with error, RSL, and Frequency correction) cases, Quality Alarms (Block TRX, Channel Failures, VSWR etc.), PDH & SDH Visibility, LVLD & Segmentation activity of entire cluster also maintaining regular reports for the same.
Implementation of TRX addition & Removal of responsible sites & maintaining records.
Responsible for Realignment of Microwave antenna, commissioning of FIU 19, FIU 19E, making cross connections.
Responsible for traffic shifting on SDH, PDH equipment.
Responsible for SDH (NEC, TEJAS, and Nokia Flexi Hybrid) implementation wherever PDH link became full.
July 2009
To January 2010
Co-ordinator
at 3Guys networks Pvt. Ltd.
Location :
India - Mumbai
Responsible for management and coordination of BTS and TRANSMISSION implementation teams, and also providing them technical support. Maintained Regular Contacts with the client and made sure for success of feedback.
Responsible for maintaining the DPR about the team movement, site material displacing, material shorting, pending sites, work out etc. for NOKIA Project.
Responsible for installation, commissioning and integration of NOKIA ULTRA SITE, NOKIA METRO SITE BTS.
Responsible for Installation of Microwave Wave link, Alignment of MICROWAVE and Loop/break testing for E1 through BSC, OMCR or MSC end.
Responsible for maintaining the DPR about the team movement, site material displacing, material shorting, pending sites, work out etc. for NOKIA Project.
Responsible for installation, commissioning and integration of NOKIA ULTRA SITE, NOKIA METRO SITE BTS.
Responsible for Installation of Microwave Wave link, Alignment of MICROWAVE and Loop/break testing for E1 through BSC, OMCR or MSC end.
January 2007
To July 2009
Project Engg.
at Reliance Communications Ltd.
Location :
India - Nagpur
Carrying out Plan events for Integration, Network Changes, Up-gradation, Deletion of NE, Performance Improvement and Fault Managements. Maintain Network Reliability through implementation of preventive & corrective measures
Installation testing and commissioning the NE’s as per engineering design document and MW link as per flers.
Project coordination activities with various teams including the NOC, Planning, Provisioning, Operations & Maintenance (ISP) for Implementation & reliability of Network.
Installation testing and commissioning the NE’s as per engineering design document and MW link as per flers.
Project coordination activities with various teams including the NOC, Planning, Provisioning, Operations & Maintenance (ISP) for Implementation & reliability of Network.