Program manager
Huawei Tech Ltd
Total years of experience :24 years, 6 months
Program Manager (Etisalat Account / UAE)
Job Responsibilities :
•Working as Program manager for all Wireless projects (2G, 3G, 4G(LTE), PS, CS, VGS and CBC) for Etisalat UAE account.
• Bidding and feasibility evaluation support for presales project.
• Project charter output and project stakeholder identification.
•Develop project Management plan (Master Plan), collect requirement, define SOW, create WBS, project time management plan, project cost management plan, project quality management plan, project HR management plan, project Risk management plan and project procurement management plan.
•Monitor & control project work, perform change control, verify & control scope, control schedule, control cost, control quality and monitor & control risks.
•Ensure that all commitments made under the contract and project objectives are fulfilled on time and within the budget.
•Maintain Project progress reporting and finance report
•Maintain revenue, billing and invoicing plan for each project.
•Project closure and Handover to customer and Maintenance team.
SAMPLE SELECTED ACHIEVEMENTS:
•Etisalat Single RAN (modernization project)
Manage the implementation and integration of 7500 (2G, 3G and 4G sites)
Manage the implementation of 16 SRC.
•Etisalat LTE (4G 1800&800MHz) project
Working as project director for Etisalat LTE project.
Manage the implementation of 2000 sites including IBS.
Manage the implementation E2E LTE core site (EPC, MME, HSS, IMS, PCRF, OSC, IPSEC, OSS, Billing and provision system).
Full planning and optimization service.
CSFB, SRVCC, VoLTE and 3CA implementation.
•Etisalat 3G expansion projects
Mange the implementation and integration of 3500 UMTS sites
Mange the implementation and integration of 4 RNC and SRAN BSC
Mange the implementation of 4 OSS systems.
•Etisalat HSPA+ and 3rd carrier expansion project
Mange the implementation and integration of 1500 UMTS sites
PAT/ FAC and handover.
•Etisalat UMTS 900&850 MHz project
Mange the implementation and integration of 900&850 MHz UMTS sites
PAT/ FAC and handover.
•Etisalat PS and CS expansion project
Mange the implementation and integration GGSN, SGSN and DNS expansion.
Mange the implementation MSC and MGW upgrade and expansion.
PAT/ FAC and handover.
Project Manager & Technical Support leader
Job History & Achievements:
•Installation, integration & Technical Support for TV Stations (NEC Transmitters, NEC Digital Transmitters, R&S Transmitters & Thales Transmitters).
•Installation, integration Operation & Technical Support for FM Stations (R&S Transmitters, Hares Transmitters & BE Transmitters).
•Control & Monitoring Systems for TV & FM (Mosley Control System & Net link Control system).
•Installation, integration & Technical Support for MW Stations (Thales Transmitters 800KW).
•Working in High Frequency Coordination Conference in Dubai-UAE between 9-13 February 2004 for Frequency Coordination to Dhabiya SW Center & IT support for the conference.
•Plan the new Digital frequency Assignment for Emirates Media INC. and submit it to ITU Organization
Installation, Commissioning Senior project Engineer in NEC Co.
Job History & Achievements:
•Installation, Commissioning & Maintenance For Mobinil Project
- SDH / PDH Microwave Systems using NEC Multiplexers.
- PNMS / NMS (Paso-link / Network management System).
- NSS (Network Synchronized Subsystem), BSS (Base Station Subsystem).
- Synchronization System for Mobinil Network and Synch View as Management and Supervisory System
•Installation, Commissioning & Maintenance for TELECOM EGYPT PROJECT:
- SDH (STM-4) FOTS System (Fiber Optics Transmission).
- NMS (Network management System) for NEC Multiplexes.
- WLL (Wireless Local Loop).
•June 2002 - August 2002
Mission to Sudan - Sudatel
Survey for WLL (Wireless local loop).
Reported the Survey Completely for All Areas, the report was including the following Items:
- Path Profile with Map Grid.
- Site Drawing using AutoCAD Program14 (Site Layout and Floor Layout).
- Link Budget Or Path calculation.
- System Summary and Site Condition.
- System Configuration.
•March 2002-April 2002
Mission to Turkey - TTI Turktelekom
Supervisor For Installation & Commissioning For :
- SDH Microwave Systems using NEC Multiplexes.
- Installing indoor & outdoor equipments.
- PNMS / NMS (Paso-link / Network management System).
- On-site training and conducting PAT with TTI stuff.
·PC Maintenance.
·LAN installation & maintenance.
·Troubleshooting.
Faculty of Electronic Engineering - Menofia University. BSc. Telecommunication Engineering. Date of Graduation: May 2000. Grade: Good. Graduation Project: Application of Doppler technique in medical diagnosis. Project grade: Excellent.