Electrical Engineer
Master Textile Mills
مجموع سنوات الخبرة :14 years, 4 أشهر
Working at Power House, on a set of Turbomach Gas Turbines Model C50, 4.2 MW and 4.6 MW, with a pair of Enerproject Gas Compressors 400 KW, 300 KW and 2 HRSG Boilers 20 Ton, 10 Bar each of Descon, with 4 Catterpillar 3512 Engines 1 MW each.
And have project experience as following:
1) Exchange and Commissioning of Gas Turbine C50 by Turbomach 4.6MW.
2) Exchange and Commissioning of Gas Compressor by Enerproject 0.1-15 Bar, 1500 m³/hr.
3) Erection and Commissioning of Thermal Oil Heater 600 MKCal/hr and HRSG Boiler 1 Ton (with Chinese Engineers).
4) Erection and Commissioning of Gas Engine Jenbacher j616, 3 × 2000KW.
5) Designing, Installation and Commissioning of LT and HT panels.
6) Erection and Commissioning of Rice Husk Boiler 20 Ton.
7) Erection and Commissioning of Air Compressor by Atlas Copco.
8) Erection and Commissioning of Coal Feed Boiler 20 Ton with Chinese Engineers.
9) Estimating of LT, HT cable sizes, Transformers, Termination Kits of HT Cables and laying cables underground.
Installed PLC at Loader, Unloader, Chipper, Conveyor Belts and Forming Units with Italian Engineers.
Worked at Power House on pair of Waukesha Enginators Model L5794 900 KW each.
Bachlor of Electrical Engineering
F.Sc
Matriculation